LEGEND

EQUIPMENT LAYOUT A GE Supplied D Available from GE


B GE Supplied/contractor installed E Equipment existing in room
C Customer/contractor supplied and installed * Item to be reinstalled from another site
MAX MAX
HEAT WEIGHT HEAT WEIGHT
BY ITEM DESCRIPTION OUTPUT (lbs) OUTPUT (kg)
(btu) (W)
A 1 Gantry 18700 3979 5480 1805
A 2 Patient Table (GT1700V) 1030 1481 300 672
A 3 Power Distribution Unit 3400 816 1000 370
A 4 Operators Console 3200 57 940 26
A 5 Console Power Box - 22 - 10
POSITION TO BE DEFINED
B 6 Main Disconnect Panel - 46 - 21
A 7 Partial UPS (10 kVA) 2828 265 830 120
9
8 CONTROL ROOM A 8 Service Cabinet - - - -
13 4 A 9 Operators Chair - - - -
A 10 Console Desk - 126 - 57
A 11 Express Camera - 7 - 3
5
A 12 SmartView Monitor 300 61 88 28
10 E 13 Injector Control and Electronics - - - -
E 14 Injector - ceiling mounted - - - -
C 15 Lead glass window
Minimum door opening for equipment delivery is 42 in. w x 82 in. h [1067mm x
C 16
15 2083mm], contingent on a 96 in. [2439mm] corridor width
5'-8"

6'-0"

EXAM ROOM HEIGHT

3'-8"
14 FINISHED CEILING HEIGHT 9'-6"

11 4'-4"
Camera Below Finished Ceiling Note:
Please note that the finished ceiling height is above the maximum camera installation height. Extender
4'-2" kit 5821337 is required to install the Junction Plate.

17'-0"
1'-8"
For Accessory Sales: (866) 281-7545 Options 1, 2, 1, 2 or mail to: gehcaccessorysales@ge.com
2'-9" 2 HCA Florida West Marion Hospital A part of HCA Florida Ocala Hospital
Ocala, FL
United States of America

EXST 7'-9"
12 1 John Proctor
3
5'-10" GE Healthcare (678) 977-4672
2'-11"

7
3'-11"

John.proctor@ge.com
6
EXAM ROOM ALL INFORMATION IN
REVOLUTION ASCEND THIS DRAWING SET IS
PRELIMINARY, SUBJECT
16 PRELIMINARY STUDY TO CHANGE!

EXST 6'-11"
18'-5"

A 08/Jun/2022 Preliminary (DC-344843)


REV DATE MODIFICATIONS
A mandatory component of this drawing set is the GE Healthcare Pre Installation manual.
Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.
Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning
GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of
final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused.
Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work due to scaling from these drawings.

Drawn by Verified by S.O. (GON) Concession PIM Manual Rev


JM JM 2007986429.4 - 5987663-1EN 3
Format Scale File Name Date Sheet
A3 1:48 CT-M316512-PRE-00-A.DWG 08/Jun/2022 01/02
TEMPERATURE AND HUMIDITY SPECIFICATIONS POWER REQUIREMENTS
IN-USE CONDITIONS
EXAM ROOM CONTROL ROOM
3 PHASES+G
Min Recommended Max Min Recommended Max POWER SUPPLY 200/220/240/380/400/420/440/460/480 V ± 10%
Temperature (up to
18°C 22°C 26°C 18°C 22°C 26°C
2400 m [7875 ft]) FREQUENCIES 50/60 Hz ± 3 Hz
64°F 72°F 79°F 64°F 72°F 79°F
MAXIMUM POWER DEMAND 100 kVA
Temperature (up to 18°C 22°C 25°C 18°C 22°C 25°C
AVERAGE (CONTINUOUS) POWER DEMAND 20 kVA
3000 m [9843 ft]) 64°F 72°F 77°F 64°F 72°F 77°F
POWER FACTOR 0.85
Temperature (up to 18°C 22°C 23°C 18°C 22°C 23°C
4000 m [13124 ft]) 64°F 72°F 73.4°F 64°F 72°F 73.4°F
Relative humidity (1) 30% to 60% 30% to 60% · Power supply should come into a man disconnect panel (MDP) containing the protective units and controls.
Max Max · The section of the supply cable should be calculated in accordance with its length and the maximum
System heat dissipation permissible voltage drops.
6.78 kW 0.94 kW
· There must be discrimination between supply cable protective device at the beginning of the installation
STORAGE CONDITIONS (main low-voltage transformer side) and the protective devices in the PDB.
0°C to +30°C
Temperature
32°F to +86°F SUPPLY CHARACTERISTICS
≤ 3°C/h · Power input must be separate from any others which may generate transients (elevators, air conditioning,
Temperature gradient
≤ 5.4°F/h radiology rooms equipped with high speed film changers...).
Relative humidity (1) 20% to 60% · All equipment (lighting, power outlets, etc...) installed with GE system components must be powered
Humidity gradient ≤ 5%/h
separately.
· Phase imbalance 2% maximum.
Storage longer than 6 months is not recommended.
(1) Non-condensing
· Transients must be less than 1500V peak. (on a 400V line)
AIR RENEWAL
According to local standards.
NOTE
In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to
take measures to protect the equipment from dropping water.

DELIVERY DISCLAIMER

THE CUSTOMER/CONTRACTOR SHOULD: This drawing is a preliminary drawing. Site conditions and/or equipment configuration may have a significant
impact on room layout and site preparation. Final study must be done before installation of the GE equipment. GE
· Provide an area adjacent to the installation site for delivery and unloading of the GE equipment. cannot accept any responsibility for errors due to lack of information.
· Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the
movement of GE equipment from the delivery area into the definitive installation room. The room dimensions used to create the equipment layout may originate from a previous layout and may not be
· Ensure that access routes for equipment will accommodate the weights of the equipment and any accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of
transportation, lifting and rigging equipment. information.
· Ensure that all necessary arrangements for stopping and unloading on public or private property not
belonging to the customer have been made. It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final
drawings. These drawings are not to be used for actual construction purposes. The company cannot take
responsibility for any damage resulting therefrom.
DIMENSIONS OF DELIVERY WITH DOLLY TRANSPORT EQUIPMENT
The customer must ensure the floor strength is sufficient to support the fixings as required. A qualified structural
EQUIPMENT DIMENSIONS WEIGHT engineer must be consulted and all work carried out according to his specifications.
LENGTH 2910 mm 115 in
GANTRY WIDTH 1290 mm 51 in 2035 kg 4486 lbs Suitable radiological protection must be determined by a qualified radiological physicist in conformation with local
HEIGHT 2000 mm 79 in regulations. GE does not take responsibility for the specification or provision of radio-protection.
LENGTH 2489 mm 98 in
GT1700V TABLE WIDTH 762 mm 30 in 576 kg 1270 lbs
HEIGHT 1143 mm 45 in
THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.

DATE NAME SIGNATURE

HCA Florida West Marion Hospital A part of HCA Florida Ocala Hospital REVOLUTION ASCEND CT-M316512-PRE-00-A.DWG Rev A Date 08/Jun/2022 Details 02/02