Professional Documents
Culture Documents
PENGEMBANGAN HD CENTER RSUD DR - SOEBANDI JEMBER
PENGEMBANGAN HD CENTER RSUD DR - SOEBANDI JEMBER
REV R0
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 29 SEPTEMBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 1
JUDUL: DENAH EXISTING HD CENTER - RSUD dr. SOEBANDI -
01 - R0 DENAH EXISTING 29/09/2022 MAP - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_01-29092022-R_00 01/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
03 - R2 REV MEETING DENGAN RS 18/10/2022 MAP - PT. SINAR RODA UTAMA ENGINEERING HAL. 3
02 - R1 REV REQ RS ISOLASI & GUDANG 07/10/2022 MAP - JUDUL: DENAH PENEGMBANGAN LT.1 HD CENTER - RSUD dr.
01 - R0 DENAH PENGEMBANGAN OPSI 2 29/09/2022 MAP - SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 02/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
03 - R2 REV MEETING DENGAN RS 18/10/2022 MAP - PT. SINAR RODA UTAMA ENGINEERING HAL. 3
02 - R1 REV REQ RS ISOLASI & GUDANG 07/10/2022 MAP - JUDUL: DENAH PENEGMBANGAN LT.2 HD CENTER - RSUD dr.
01 - R0 DENAH PENGEMBANGAN OPSI 2 29/09/2022 MAP - SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 03/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 4
JUDUL: DENAH INSTALASI TITIK LAMPU & STOP KONTAK LT.1 HD
CENTER - RSUD dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 04/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 5
JUDUL: DENAH INSTALASI TITIK LAMPU & STOP KONTAK LT.2
HD CENTER - RSUD dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 05/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 3
JUDUL: DENAH INSTALASI AIR DISTRIBUSI RO LT.1 HD CENTER -
RSUD dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 06/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 7
JUDUL: ISOMETRIK INSTALASI AIR DISTRIBUSI RO LT.1 HD
CENTER - RSUD dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 07/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 8
JUDUL: DENAH INSTALASI BUANGAN MESIN HD LT.1 HD CENTER -
RSUD dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 08/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 09
JUDUL: DENAH INSTALASI AIR BERSIH LT.1 HD CENTER - RSUD
dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 09/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 10
JUDUL: DENAH INSTALASI AIR BERSIH LT.2 HD CENTER - RSUD
dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 10/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 11
JUDUL:DENAH INSTALASI AIR KOTOR LT.1 HD CENTER - RSUD dr.
SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 11/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 12
JUDUL: DENAH INSTALASI AIR KOTOR LT.2 HD CENTER - RSUD
dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 12/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 13
JUDUL: DENAH INSTALASI AIR KOTOR PADAT LT.1 HD CENTER -
RSUD dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 13/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 14
JUDUL: DENAH INSTALASI AIR KOTOR PADAT LT.2 HD CENTER -
RSUD dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 14/04
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 15
JUDUL: DENAH INSTALASI TITIK AC & EXHAUST LT.1 HD CENTER
- RSUD dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 15/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 16
JUDUL:DENAH INSTALASI TITIK AC & EXHAUST LT.2 HD CENTER
- RSUD dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 16/16
NO. REV R2
DRAWING LAYOUT HD CENTER
E:\PT. SINAR RODA UTAMA\1. PEKERJAAN\DENAH KANTOR\thumb_sinarodautama.png
TGL. REV 18 OKTOBER 2022
NEW CENTER & MECHANICAL KODE F-SRU-NCME-02
PT. SINAR RODA UTAMA ENGINEERING HAL. 16
JUDUL: LAYOUT MESIN RO PENGEMBANGAN HD CENTER - RSUD
dr. SOEBANDI - JEMBER
NO. PROYEK: NO GAMBAR: NO. HAL:
NO. POS REV PERUBAHAN TGL. DIREVISI DIPERIKSA - NCME-NO_03-18102022-R_02 17/17
No. Revisi
UTILITY HD CENTER - AIR BAKU DAN AIR LIMBAH HD
Tgl. Revisi
Kode F-SRU-NCME-03
PT SINAR RODA UTAMA NEW CENTER AND MECHANICAL ENGINEERING Halaman 1
RO water/rinse Liter 25
Disinfectant/rinse milliliter
Reuse
Rinse Time Minute 10
Reuse Waste LPM 2.50 5.00
Disiapkan oleh,
M ARIF PRASETIYO
NEW CENTER AND MECHANICAL ENGINEERING
Tgl :
UTILITY HD CENTER - LISTRIK DAN AC
No. Area Equipment Daya Satuan (Watt) Jumlah Equipment (unit) Total Daya (Watt)
Type
BESARAN DAYA YG TERSEDIA Watt GOL MCB / MCCB V Kabel
VA rounde d (VA) kVA @ PF = 0.8 A Fasa Toefoer Besar Kabel by AKLI
450 0,45 360 TR 2 1ɸ 220 V NYY / NYM 3 x 2.5 mm²
900 0,9 720 TR 4 1ɸ 220 V NYY / NYM 3 x 2.5 mm²
1.300 1,3 1.040 TR 6 1ɸ 220 V NYY / NYM 3 x 4 mm²
2.200 2,2 1.760 TR 10 1ɸ 220 V NYY / NYM 3 x 4 mm²
3.500 3,5 2.800 TR 16 1ɸ 220 V NYY / NYM 3 x 4 mm²
4.400 4,4 3.520 TR 20 1ɸ 220 V NYY / NYM 3 x 4 mm²
5.500 5,5 4.400 TR 25 1ɸ 220 V NYY / NYM 3 x 4 mm²
7.700 7,7 6.160 TR 35 1ɸ 220 V NYY / NYM 3 x 6 mm²
11.000 11 8.800 TR 50 1ɸ 220 V NYY / NYM 3 x 6 mm²
13.900 13,9 11.120 TR 63 1ɸ 220 V NYY / NYM 3 x 10 mm²
3.949 3.900 3,9 3.159 TR 6 3ɸ 380 V NYY / NYFGBY 4 x 4 mm²
6.582 6.600 6,6 5.265 TR 10 3ɸ 380 V NYY / NYFGBY 4 x 4 mm²
10.531 10.600 10,6 8.425 TR 16 3ɸ 380 V NYY / NYFGBY 4 x 6 mm²
13.164 13.200 13,2 10.531 TR 20 3ɸ 380 V NYY / NYFGBY 4 x 10 mm²
16.454 16.500 16,5 13.164 TR 25 3ɸ 380 V NYY / NYFGBY 4 x 10 mm²
23.036 23.000 23 18.429 TR 35 3ɸ 380 V NYY / NYFGBY 4 x 16 mm² PANEL RO BARU
32.909 33.000 33 26.327 TR 50 3ɸ 380 V NYY / NYFGBY 4 x 16 mm²
41.465 41.500 41,5 33.172 TR 63 3ɸ 380 V NYY / NYFGBY 4 x 25 mm²
52.654 53.000 53 42.123 TR 80 3ɸ 380 V NYY / NYFGBY 4 x 35 mm²
65.818 66.000 66 52.654 TR 100 3ɸ 380 V NYY / NYFGBY 4 x 50 mm²
82.272 82.500 82,5 65.818 TR 125 3ɸ 380 V NYY / NYFGBY 4 x 50 mm² PANEL HD BARU
105.309 105.000 105 84.247 TR 160 3ɸ 380 V NYY / NYFGBY 4 x 70 mm²
131.636 131.000 131 105.309 TR 200 3ɸ 380 V NYY / NYFGBY 4 x 95 mm²
148.090 147.000 147 118.472 TR 225 3ɸ 380 V NYY / NYFGBY 4 x 95 mm²
164.545 164.000 164 131.636 TR 250 3ɸ 380 V NYY / NYFGBY 4 x 120 mm²
197.454 197.000 197 157.963 TR 300 3ɸ 380 V NYY / NYFGBY 4 x 150 mm²
233.654 233.000 233 186.923 TM 355 3ɸ 380 V NYY / NYFGBY 4 x 150 mm²
279.726 279.000 279 223.781 TM 425 3ɸ 380 V NYY / NYFGBY 4 x 240 mm²
329.090 329.000 329 263.272 TM 500 3ɸ 380 V NYY / NYFGBY 4 x 240 mm²
414.653 414.000 414 331.722 TM 630 3ɸ 380 V NYY / NYFGBY 4 x 300 mm²
TABEL DAYA & UKURAN KABEL (STANDAR AKLI)
NOTE:
Berdasarkan perhitungan di atas didapatkan total daya 60453 Watt, sehingga apabila mengacu tabel ukuran kabel digunakan
size kabel utama panel hd 4x50 mm2 dengan mccb 3p 125A
Untuk panel ro dibutuhkan daya 14000 watt digunakan kabel power 4x16 mm2 dengan mccb 3p 35A
Perhitungan daya ini hanya pada area baru dan bed baru saja, area existing menggunakan daya existing
Disiapkan oleh,