You are on page 1of 5

NDT Summary for C1 Generator (2020 - 2020)

Nane Test Type Report No. Report Title Date Tested P.O.No. Re-Inspection Report No.
Ben PT Bearing No.7 to No.9 - Indication No.7 Bottom ( #1 & #2 13-Feb-20
K.T.Wong UT Bearing No.7 to No.9 ( Top & Bottom Half ) 13-Feb-20
C.Y.Kong PT Bearing No.7 & No.8 ( Top & Bottom Half ) 18-Feb-20
T,C.Ng UT Bearing No.7 & No.8 ( Top & Bottom Half ) 18-Feb-20
T,C.Ng PT Bearing No.8 ( Top & Bottom Half ) New Spare 20-Feb-20
T,C.Ng UT Bearing No.8 ( Top & Bottom Half ) New Spare 20-Feb-20
Y.S.Liu / Ben / Paul PT Seal oil Pipe 7,9 & 10-03-2020
K.T.Wong PT Bottom H2 Pipe Work 14-Mar-20
K.T.Wong PT Soal Oil Pipe Work 14-Mar-20
K.T.Wong PT H2 Dryer Pipe Work 14-Mar-20
Lun / Wood PT Rotor Fan Blade ( Top & Bottom Half ) 24 to 26-02-2020
C.W.Kung PT Bearing No.7,8,9 Top & Bottom Half 23-Mar-20
C.W.Kung UT Bearing No.7,8,9 Top & Bottom Half 23-Mar-20
C.W.Kung PT Stator Water Pipe 24-Mar-20
C.W.Kung PT Rotor Hydrogen Seal Ring C/E Top & Bottom Half 31-Mar-20
C.W.Kung UT Rotor Hydrogen Seal Ring C/E Top & Bottom Half 31-Mar-20
T,C.Ng PT Rotor Hydrogen Seal Ring T/E Top & Bottom Half 30-Mar-20
T,C.Ng UT Rotor Hydrogen Seal Ring T/E Top & Bottom Half 30-Mar-20
NDT Summary for C1 HRSG (2020 - 2020)

Name Test Type Report No. Report Title Date Tested P.O.No. Re-Inspection Report No.
NDT Summary for C1 Turbine - (2020 - 2020)

Name Test Type Report No. Report Title Date Tested


Y.Y.Leung UT CNT Erosion Shield of LP Stage 5 Blade ( Non Pressure Side ) 10 to 12-02-2020
Y.S.Liu / C.W.Kung PT CNT Purge Air Line - Pipe Ferrule & Bend 12 to15 & 17,20-02-2020
C.W.Kung PT CNT MSG UV020 Coupling 13-Feb-20
Y.S.Liu / C.W.Kung PT CNT Flase Start Drain System Modification ( GE ) 18,25 to 28-2& 2,5-03-2020
K.T.Wong / Y.S.Liu / C.W.Kung FDE CNT 3 Stage Bucket 20 to 23-02-2020
Y.S.Liu / C.W.Kung PT CNT Flow Sleeve 24 to 27-02-2020
C.W.Kung PT CNT Bucket Rockwire Tab ( 3 No.s ) 24-Feb-20
L.K.Cheung / K.T.Wong PT CNT I.B.H.Fiange 29-02 & 05-03-2020
C.W.Kung PT CNT C6 AA-Pre- Cooler 26-Feb-20
C.W.Kung PT CNT C1 AA-Pre- Cooler ( New Spare ) 26-Feb-20
L.K.Cheung UT CNT Gland Steam Condenser 3-Mar-20
W.C.Liu / K.S.Lau MT CNT Gland Steam Condenser 3-Mar-20
C.W.Kung PT CNT First Stage Gas Manifold Pipe ( PM1,2,3 & D5 ) 04 & 05-03-2020
C.W.Kung PT CNT MGM AA Filter Housing 4-Mar-20
C.W.Kung PT CNT MGM AA Filter Housing ( Repaired Weld ) 5,7,10 & 21-03-2020
C.W.Kung PT CNT Bearing Tunnel Internal Weld 6,7,9,16 to 18-03-2020
C.W.Kung MT CNT Gland Steam Superheater 10-Mar-20
K.T.Wong UT CNT Gland Steam Superheater 11-Mar-20
K.T.Wong / Wood PT CNT Gas Turbine Exhaust Diffuser 27-2 & 4 to 14-3 & 17,18-03-2020
L.K.Cheung UT CNT Diffuse Casing Deflector Pins 10 & 11-03-2020
K.T.Wong PT CNT Exhaust Radiation Shield 29-02 & 5-03-2020
C.Y.Kong / K.T.wong FDE CNT Bull Horn 26-Feb-20
Y.Y.Leung / K.T.wong FMPI CNT Shroud Block Slot 24 & 25-02-2020
C.W.Kung PT CNT HP Governor Valve - Bush Sleeve 11-Mar-20
C.W.Kung PT CNT HP Stop Valve 12,16,17-03-2020
C.W.Kung FMPI CNT HP Stop Valve - Strainer 13-Mar-20
K.T.Wong PT CNT Turbine Bearing No.1 & No.6 3 & 4-03-2020
K.T.Wong UT CNT Turbine Bearing No.1 & No.6 3 & 4-03-2020
L.K.Cheung MT CNT Condensafe Extraction Pump & Motor Refurbishment 14-Mar-20
K.T.Wong PT CNT HP Stop Valve 4-Mar-20
K.T.Wong PT CNT HP Governor Valve 4-Mar-20
C.W.Kung FMPI CNT HP Stop Valve - Cover Bolt 17-Mar-20
C.W.Kung FMPI CNT HP Stop Valve - Cover Bolt & Nut 17-Mar-20
C.W.Kung PT CNT Bearing Tunnel Cover - Lock Plate Weld Cancelled
K.T.Wong / Wood PT CNT Diffuse Casing Deflector 27-2,4 to 7 & 9 to 11-03-2020

You might also like