Professional Documents
Culture Documents
C1-Turbine & HRSG & Generator
C1-Turbine & HRSG & Generator
Nane Test Type Report No. Report Title Date Tested P.O.No. Re-Inspection Report No.
Ben PT Bearing No.7 to No.9 - Indication No.7 Bottom ( #1 & #2 13-Feb-20
K.T.Wong UT Bearing No.7 to No.9 ( Top & Bottom Half ) 13-Feb-20
C.Y.Kong PT Bearing No.7 & No.8 ( Top & Bottom Half ) 18-Feb-20
T,C.Ng UT Bearing No.7 & No.8 ( Top & Bottom Half ) 18-Feb-20
T,C.Ng PT Bearing No.8 ( Top & Bottom Half ) New Spare 20-Feb-20
T,C.Ng UT Bearing No.8 ( Top & Bottom Half ) New Spare 20-Feb-20
Y.S.Liu / Ben / Paul PT Seal oil Pipe 7,9 & 10-03-2020
K.T.Wong PT Bottom H2 Pipe Work 14-Mar-20
K.T.Wong PT Soal Oil Pipe Work 14-Mar-20
K.T.Wong PT H2 Dryer Pipe Work 14-Mar-20
Lun / Wood PT Rotor Fan Blade ( Top & Bottom Half ) 24 to 26-02-2020
C.W.Kung PT Bearing No.7,8,9 Top & Bottom Half 23-Mar-20
C.W.Kung UT Bearing No.7,8,9 Top & Bottom Half 23-Mar-20
C.W.Kung PT Stator Water Pipe 24-Mar-20
C.W.Kung PT Rotor Hydrogen Seal Ring C/E Top & Bottom Half 31-Mar-20
C.W.Kung UT Rotor Hydrogen Seal Ring C/E Top & Bottom Half 31-Mar-20
T,C.Ng PT Rotor Hydrogen Seal Ring T/E Top & Bottom Half 30-Mar-20
T,C.Ng UT Rotor Hydrogen Seal Ring T/E Top & Bottom Half 30-Mar-20
NDT Summary for C1 HRSG (2020 - 2020)
Name Test Type Report No. Report Title Date Tested P.O.No. Re-Inspection Report No.
NDT Summary for C1 Turbine - (2020 - 2020)