You are on page 1of 6

Lab. Code No.

: CNT230042 Page 1 of 3
Report No. :

.
Worksheet for Magnetic Particle Inspection

Information Supplied by Client

Client : CLP Power Hong Kong Ltd.


Client Address : GED Black Point Power Station, Yung Long Road, Lung Kwu Tan,
Tuen Mun. N.T. Hong Kong
Project : Provision of Specialized Service - NDT
Location of test : Black Point Power Station Unit: C3 Plant: HRSG
Component description : Blow Down Drain Vessel
Welding Process : M.M.A.W
Component Material : Steel
Acceptance Standard : All Indications to be reported
New Engineering Contract No. :
W.O. Number :

Laboratory Information

Date Tested : 15-3-2023


Inspection procedure no. : WI-303-0403-100-18-1 (Rev.A)
Magnetization Method : Flux Flow, Continuous
Pole Direction : Two directions approx. 90° apart
Pole Spacing : Max. 150mm
Pole Dimension : 25mm x 25mm
Viewing Condition : ( >1000Lux ) Artificial Light
Surface Condition : As Smooth, Dry and clean
Medium Application : Spraying

Equipment ID. & Consumable Used :-


- Magnetization Equipment : N-026-14
- Background Media : Ardrox 8901/W White Contrast Paint
- Detecting Media : Ardrox 800/3 Black Magnetic Ink.

Remarks : 1. All test results are as at time of testing.


2. All test locations are as directed by the client.
3. See the attached sketch for test locations.
4.This report is a supplement to our previous test report no.131053CNT160042

Results Summary:
Parts with deviation : : --
Parts with no deviation : :
Remarks : --
NT-R-76 (25/10/2008) P.1
Lab. Code No. : CNT230042 Page 2 of 3
Report No. : 0

Worksheet for Magnetic Particle Inspection


Test Results

Description of Test Item : C3 HRSG - Blow Down Drain Vessel

Item Tested Location Tested Indication No. Assessment Remarks


Silencer Support Plate 100% Weld Tested -- No Recordable Indication --
L.P Water Header 100% Weld Tested -- No Recordable Indication --
H.P Water Header 100% Weld Tested -- No Recordable Indication --
Drain Vent 100% Weld Tested -- No Recordable Indication --
Circ. Pump 100% Weld Tested -- No Recordable Indication --
Support Plate Weld 101% Weld Tested -- No Recordable Indication --
'-End-

Tested by : K.T.Wong Qualification : ASNT-SNT-TC-1A-Level II Date : 15-3-2023

Authorized by : Position : Manager - NDT Welding Date :


BABU, Vinodh Kumar ASNT-MT-Level 3
NT-R-76 (25/10/2008) P.2
Lab. Code No. : CNT230042 Page 3 of 3
Report No. : 0

Worksheet for Magnetic Particle Inspection

C3 HRSG - Blow Down Drain Vessel

Silencer Support Plate

Support Plate Weld

L.P Water Header H.P Water Header

Circ. Pump
Drain Vent

Test Location for Blow Down Drain Vessel

Remark: This sketch is not in scale.


Tested Area