Worksheet for Dye Penetrant Examination

Information Supplied by Client

Client : CLP Power Hong Kong Ltd.


Client Address : GED Black Point Power Station, Yung Long Road, Lung Kwu Tan,
Tuen Mun, N.T., Hong Kong
Project : Provision of Specialized Service - NDT
Location of test : Black Point Power Station Unit: C7 Plant: Turbine
Component description : LP Steam Turbine Loop Pipe Expansion Bellow
Welding process : Not Applicable
Component Material : Alloy Steel
Acceptance Standard : All indications to be reported
New Engineering Contract No. :
P.O. Number :

Laboratory Information

Date tested : 26-Dec-2018


07/12/2023
Inspection procedure MI-17.5.1-N019
Surface condition : As Smooth, Dry and Clean
Viewing condition : ( >1000Lux) Artificial Light
Pre-cleaning : Cleaning the surface with clean cloths & rag

Equipment ID. & Consumable Use :-


- Penetrant : SHERWIN DP-50
- Remover : SHERWIN DR-60
- Developer : SHERWIN D-100

Remarks : 1. All test results are as at time of testing.


2. All test locations are as directed by the client.
3. See the attached sketch for test locations.

Results Summary:
Parts with deviation : --
Parts with no deviation : LP Steam Turbine Loop Pipe Expansion Bellow - L.H.S & R.H.S - No.1 to 3
Remarks : --

NT-R-78 (25/10/2008) P.1


Lab. Code No. : 0 Page 2 of 4
Report No. : 0

Worksheet for Dye Penetrant Examination


Test Results

Description of Test Item : C7 Turbine - LP Steam Turbine Loop Pipe Expansion Bellow

Item Tested Location Tested Indication No.


L.H.S. - No.1 to 3 See attached sketch -- No Recordable Indication
R.H.S. - No.1 to 3 See attached sketch -- No Recordable Indication
-End-

Tested by : C.W.Kung Qualification : ASNT-SNT-TC-1A-Level II Date :

Authorized by : Position : Manager - NDT Welding Date :


BABU, Vinodh Kumar ASNT-PT-Level 3
NT-R-78 (25/10/2008) P.2
Remarks
--
--

07/12/2023
Lab Code No. : 0 Page 3 of 4
Report No. : 0

Worksheet for Dye Penetrant Examination

C7 Turbine - LP Steam Turbine Loop Pipe Expansion Bellow

Test Location for LP Steam Turbine Loop Pipe Expansion Bellow

Remark: This sketch is not in scale.


Tested Area
NT-R-78 (25/10/2008) P.3
Lab Code No. : 0 Page 4 of 4
Report No. : 0

Worksheet for Dye Penetrant Examination

C7 Turbine - LP Steam Turbine Loop Pipe Expansion Bellow

Test Location for LP Steam Turbine Loop Pipe Expansion Bellow

Remark: This sketch is not in scale.


Tested Area