You are on page 1of 7

Lab. Code No.

: Page 1 of 4
Report No. :

.
Worksheet for Magnetic Particle Inspection

Information Supplied by Client

Client : CLP Power Hong Kong Ltd.


Client Address : GED Black Point Power Station, Yung Long Road, Lung Kwu Tan,
Tuen Mun. N.T. Hong Kong
Project : Provision of Specialized Service - NDT
Location of test : Black Point Power Station Unit: C6 Plant: Turbine
Component description : LP Cylinder Casing (Bottom Half)
Welding Process : M.M.A.W
Component Material : Steel
Acceptance Standard : All Indications to be reported
New Engineering Contract No. :
W.O. Number :

Laboratory Information

Date Tested : 11-02-2022


Inspection procedure no. : MI-17.5.1-N020
Magnetization Method : Flux Flow, Continuous
Pole Direction : Two directions approx. 90° apart
Pole Spacing : Max. 150mm
Pole Dimension : 25mm x 25mm
Viewing Condition : ( >1000Lux ) Artificial Light
Surface Condition : As Smooth, Dry and clean
Medium Application : Spraying

Equipment ID. & Consumable Used :-


- Magnetization Equipment : N-026-37
- Background Media : Ardrox 8901/W White Contrast Paint
- Detecting Media : Ardrox 800/3 Black Magnetic Ink.

Remarks : 1. All test results are as at time of testing.


2. All test locations are as directed by the client.
3. See the attached sketch for test locations.

Results Summary:
Parts with deviation : : --
Parts with no deviation : :
Remarks : --
NT-R-76 (25/10/2008) P.1
Lab. Code No. : 0 Page 2 of 4
Report No. : 0

Worksheet for Magnetic Particle Inspection


Test Results

Description of Test Item : C6 Turbine - LP Cylinder Casing (Bottom Half)

Item Tested Location Tested Indication No. Assessment Remarks


J1 to J3 100% Weld Tested -- No Recordable Indication --
** End **

Tested by : K.H.Ho / C.W.Kung Qualification : ASNT-SNT-TC-1A-Level II Date : 11-02-2022

Authorized by : Position : Manager - NDT Welding Date :


BABU, Vinodh Kumar ASNT-MT-Level 3

NT-R-76 (25/10/2008) P.2


Lab. Code No. : 0 Page 3 of 4
Report No. : 0

Worksheet for Magnetic Particle Inspection

C6 Turbine - LP Cylinder Casing (Bottom Half)

CASIO : CIMG6243.JPG

Test Location for LP Cylinder Casing (Bottom Half)

Remark: This sketch is not in scale.


NT-R-76 (25/10/2008) P.3
Lab. Code No. : 0 Page 4 of 4
Report No. : 0

Worksheet for Magnetic Particle Inspection

C6 Turbine - LP Cylinder Casing (Bottom Half)

J3 J2
J1

Test Location for LP Cylinder Casing (Bottom Half)

Remark: This sketch is not in scale.

Tested Area
NT-R-76 (25/10/2008) P.3