Dear Sir,
Enclosed herewith please find our inspection report No.220196NT221186 Dated: 06/08/2022 for
Final inspection at Dongguan Qiaotou Zhude Hardware processing factory
Should you need further information on this report, please feel free to contact us.
V.K. Babu
Manager - NDT/Welding Dept.
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 2 of 12
Report No. : 220196NT221186 Date Inspected: 06-08-2022
Inspection Report (Galvanization)
Summary of Inspection
The total number of members that has been blast cleaned, the number of members that has been
1 inspected for blast cleaning in this visit, since the last inspection visit and the remaining number of
members that has not yet been blast cleaned; and
Refer to attached inspection progress
2 Identification of steel members for blast cleaning that has been inspected in the visit.
Ref to Appendix: 1
Record all the defects Galvanized surface is smooth without zinc slag Appendix: 2
Carry out repair work in accordance with the The factory uses zinc rich primer to repair uncoated
Appendix: 4
approved method statement areas
Recommendation: Nil
Conclusion: The above works were checked and agreed to next process.
Remark: Nil
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 3 of 12
Report No. : 220196NT221186 Date Inspected: 06-08-2022
Inspection Report (Painting)
Summary of Inspection
The total number of members that has been blast cleaned, the number of members that has been
1 inspected for blast cleaning in this visit, since the last inspection visit and the remaining number of
members that has not yet been blast cleaned; and
Refer to attached inspection progress
2 Identification of steel members for blast cleaning that has been inspected in the visit.
Metal Railing : T5-1,T5-7,T6-8,T7-2,T7-7,T8-6,T5-4,T5-9,T6-4,T6-10,T7-4,T8-3
Follow up of the Recommendation of the previous report No such activity during visit N/A
Witness T-wash process and application of primer No such activity during visit N/A
Carry out other tests as appropriate No such activity during visit N/A
Recommendation: Nil
Conclusion: Repair and retest are requested for flat iron railing : T5-1, T5-7, T6-8, T7-2, T7-7, T8-6, T5-4, T5-9, T6-4, T6-10, T7-
4,
T8-3
Remark: Nil
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 4 of 12
Rep
220196NT221186 Date Inspected: 06-08-2022
ort
Inspection Report (Final Inspection)
Summary of Inspection
The total number of members that has been final check and pack up, the number of members that
1 has been inspected forfinal check and pack up in this visit, since the last inspection visit and the
remaining number of members that has not yet been final check and pack up; and
Refer to attached inspection progress
2 Identification of steel members for final check and pack up that has been inspected in the visit.
Ref to Appendix: 1
Document Reiew (QA/QC documents and Factory does not provide QA/QC documents and
N/A
records) records
Check welds and stud welds according to Weld type and dimensions are in accordance
Appendix :2
approved shop drawings with approved construction drawings
Recommendation: Nil
Conclusion: The above works were checked and agreed to next process.
Remark: Nil
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 5 of 12
Inspection Summary
- Finding:
1 QA/QC documents and records have not been provide during the visit.
The painting thickness of flat iron railings have not reached the required painting thickness ,
2 adhesion of paint is failure which can be peeled off easily.
(Flat iron railing : T5-1, T5-7, T6-8, T7-2, T7-7, T8-6, T5-4, T5-9, T6-4, T6-10, T7-4, T8-3)
• Inspected by:
Name: Xu Chunyu Qualification: CSWIP3.1 Certified Welding Inspector
NACE level 1 coating inspector
Any attachment: Yes ■ No □
Appendix 1 to 7
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 6 of 12
Appendix: 1
Page 7 of 12
Appendix: 2
Page 8 of 12
Appendix: 3
Photo 10 to 17 : The galvanize thickness was 88-135um, and the test results met the design requirements
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 9 of 12
Appendix: 4
Photo 18 to 25 :The galvanized holes have been repaired and the uncoated areas have been repaired by the factory using zinc
rich primer.
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 10 of 12
Appendix: 5
Photo 26 to 33: Adhesion of paint is failure ahich can be peeled off easily. (Flat iron railing : T5-1, T5-7, T6-8, T7-2, T7-7, T8-6,
T5-4, T5-9, T6-4, T6-10, T7-4, T8-3)
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 11 of 12
Appendix: 6
Photo 34 to 38 :The painting thickness of flat iron railings have not reached the required painting thickness. (Flat iron railing :
T5-1, T5-7, T6-8, T7-2, T7-7, T8-6, T5-4, T5-9, T6-4, T6-10, T7-4, T8-3)
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 12 of 12
Appendix: 7