You are on page 1of 12

FUGRO TECHNICAL SERVICES LIMITED

Tel : +852-2450 8233


Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 1 of 12

Report No. : 220196NT221186 Date Inspected: 06-08-2022

Inspection of Fabrication of Structural Steelwork out Hong Kong for the Project -
Columbarium at Cape Collison Road in Chai Wan (Programme No. 023NB)

Subject: Inspection of Fabrication of Steelwork Outside Hong Kong

Dear Sir,
Enclosed herewith please find our inspection report No.220196NT221186 Dated: 06/08/2022 for
Final inspection at Dongguan Qiaotou Zhude Hardware processing factory

Should you need further information on this report, please feel free to contact us.

Thank you for your attention.

For and on behalf of


Fugro Technical Services Ltd.

V.K. Babu
Manager - NDT/Welding Dept.
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 2 of 12
Report No. : 220196NT221186 Date Inspected: 06-08-2022
Inspection Report (Galvanization)
Summary of Inspection
The total number of members that has been blast cleaned, the number of members that has been
1 inspected for blast cleaning in this visit, since the last inspection visit and the remaining number of
members that has not yet been blast cleaned; and
Refer to attached inspection progress

2 Identification of steel members for blast cleaning that has been inspected in the visit.
Ref to Appendix: 1

Details of Inspection and observation


Activities Involved Observation / Findings / Corrective action Reference

Follow up of the Recommendation of the previous


N/A N/A
report

Ensure that all QA/QC documentation and all


Factory does not provide QA/QC documents and
compliance test results of fabrication works are in N/A
records
order

Check surface condition prior to hot-dip galvanization


(All weld slags and paints on steel surface shall be No such activity during visit N/A
removed. All cut surfaces shall be ground smooth)

Check vent and drainage holes in accordance with


The galvanized holes have been repaired, Appendix: 4
approved shop drawings

Check the process of galvanization in accordance


with the approved method statement and QA/QC has No such activity during visit N/A
been implemented

The galvanize thickness was 88-135um, and the test


Check thickness of galvanization coating Appendix: 3
results met the design requirements

Record all the defects Galvanized surface is smooth without zinc slag Appendix: 2

Carry out repair work in accordance with the The factory uses zinc rich primer to repair uncoated
Appendix: 4
approved method statement areas

Recommendation: Nil

Conclusion: The above works were checked and agreed to next process.

Remark: Nil
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 3 of 12
Report No. : 220196NT221186 Date Inspected: 06-08-2022
Inspection Report (Painting)
Summary of Inspection
The total number of members that has been blast cleaned, the number of members that has been
1 inspected for blast cleaning in this visit, since the last inspection visit and the remaining number of
members that has not yet been blast cleaned; and
Refer to attached inspection progress

2 Identification of steel members for blast cleaning that has been inspected in the visit.
Metal Railing : T5-1,T5-7,T6-8,T7-2,T7-7,T8-6,T5-4,T5-9,T6-4,T6-10,T7-4,T8-3

Details of Inspection and observation


Activities Involved Observation / Findings / Corrective action Reference

Follow up of the Recommendation of the previous report No such activity during visit N/A

Method of painting and procedure to be in accordance with


the approved method statement and specifications No painting activity during the visit Appendix: 5
(Information of paint shall be recorded)

Paint and associated materials are properly stored and


No such activity during visit N/A
protected

Witness T-wash process and application of primer No such activity during visit N/A

Check each coat is completely dried before the application


of further coats and all coats are applied within the allowable No such activity during visit N/A
time limit

The painting thickness of flat iron railings have not


Check the dry film thickness of the paint coats Appendix:6
reached the required painting thickness.

Adhesion of paint is failure which can be peeled off


Visual inspection for surface defects and record all defects Appendix: 5
easily.

Check surface preparation work and subsequent protection


No such activity during visit N/A
treatment against the approved method statement

Carry out other tests as appropriate No such activity during visit N/A

Recommendation: Nil

Conclusion: Repair and retest are requested for flat iron railing : T5-1, T5-7, T6-8, T7-2, T7-7, T8-6, T5-4, T5-9, T6-4, T6-10, T7-
4,
T8-3

Remark: Nil
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 4 of 12
Rep
220196NT221186 Date Inspected: 06-08-2022
ort
Inspection Report (Final Inspection)
Summary of Inspection
The total number of members that has been final check and pack up, the number of members that
1 has been inspected forfinal check and pack up in this visit, since the last inspection visit and the
remaining number of members that has not yet been final check and pack up; and
Refer to attached inspection progress
2 Identification of steel members for final check and pack up that has been inspected in the visit.
Ref to Appendix: 1

Details of Inspection and observation


Activities involved Observation / Findings / Corrective action Reference

Follow up of the Recommendation of the


N/A N/A
previous report

Document Reiew (QA/QC documents and Factory does not provide QA/QC documents and
N/A
records) records

Material Inspection (delivered steel sections


to be checked against manufacturer's Material has been checked on previous visits N/A
certificates)

Storage of structural steel members (Stockist


certificate and all steel members shall be All structural steel members are stored indoors Appendix :2
traceable)

Check dimensions of members, pre-camber,


alignment and setting out of connection joints All dimensions are checked and recorded by
N/A
and holes in accordance with approved shop factory QC
drawings

Check welds and stud welds according to Weld type and dimensions are in accordance
Appendix :2
approved shop drawings with approved construction drawings

Recommendation: Nil

Conclusion: The above works were checked and agreed to next process.

Remark: Nil
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 5 of 12

Report No. : 220196NT221186 Date Inspected: 06-08-2022

Inspection Summary

- Finding:
1 QA/QC documents and records have not been provide during the visit.

The painting thickness of flat iron railings have not reached the required painting thickness ,
2 adhesion of paint is failure which can be peeled off easily.
(Flat iron railing : T5-1, T5-7, T6-8, T7-2, T7-7, T8-6, T5-4, T5-9, T6-4, T6-10, T7-4, T8-3)

- Conclusion and Recommendation (If Any):


QA/QC and NDT reports for all componebts should be tidied up and send to ASD & IIA for
1
record and checking as soon as possible after the fabrication.
Repair and retest are requested for flat iron railing : T5-1, T5-7, T6-8, T7-2, T7-7, T8-6, T5-4,
2
T5-9, T6-4, T6-10, T7-4, T8-3

- Follow up action from previous visits:


Nil

• Inspected by:
Name: Xu Chunyu Qualification: CSWIP3.1 Certified Welding Inspector
NACE level 1 coating inspector
Any attachment: Yes ■ No □
Appendix 1 to 7
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 6 of 12

Report No. : 220196NT221186 Date Inspected: 06-08-2022

Appendix: 1

Photo 1 :Check the number of delivery orders and components


FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 7 of 12

Report No. : 220196NT221186 Date Inspected: 06-08-2022

Appendix: 2

Photo 2 to 9 : Galvanized surface is smooth without zinc slag


FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 8 of 12

Report No. : 220196NT221186 Date Inspected: 06-08-2022

Appendix: 3

Photo 10 to 17 : The galvanize thickness was 88-135um, and the test results met the design requirements
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 9 of 12

Report No. : 220196NT221186 Date Inspected: 06-08-2022

Appendix: 4

Photo 18 to 25 :The galvanized holes have been repaired and the uncoated areas have been repaired by the factory using zinc
rich primer.
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 10 of 12

Report No. : 220196NT221186 Date Inspected: 06-08-2022

Appendix: 5

Photo 26 to 33: Adhesion of paint is failure ahich can be peeled off easily. (Flat iron railing : T5-1, T5-7, T6-8, T7-2, T7-7, T8-6,
T5-4, T5-9, T6-4, T6-10, T7-4, T8-3)
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 11 of 12

Report No. : 220196NT221186 Date Inspected: 06-08-2022

Appendix: 6
Photo 34 to 38 :The painting thickness of flat iron railings have not reached the required painting thickness. (Flat iron railing :
T5-1, T5-7, T6-8, T7-2, T7-7, T8-6, T5-4, T5-9, T6-4, T6-10, T7-4, T8-3)
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com

Page 12 of 12

Report No. : 220196NT221186 Date Inspected: 06-08-2022

Appendix: 7

Photo 39 to 46 :Components have been signed for shopping.

You might also like