Worksheet for Manual Ultrasonic Examination (Thickness Gauging)

Information Supplied by Client


Client : CLP Power Hong Kong Ltd.
Client Address Shown : GED Office, Black Point Power Station, Yung Long Road,
Lung Kwu Tan, Tuen Mun, N.T., Hong Kong
Project : Provision of Specialized Service - NDT
Location of test : Black Point Power Station Unit: C3 Plant: HRSG
Sample description : Air Tank TCV020&PCV068 Valve
Test method used : OP-303-0454-314 Rev.A
Acceptance standard : Thickness Measurement
Material Specification : Steel
Stage of material supplied : In-Services
Surface Condition : As Smooth, Dry and Clean
New Engineering Contract No. :
P.O. No. :

Laboratory Information
Inspection Procedure : OP-303-0454-314 Rev.A
Date tested : 16-3-2023
Surface condition : As Smooth, Dry and Clean
Test Surface Temperature : 25°C
Couplant : UCA2 Test Restriction : None

Equipment - Flaw detector : SIUI / CTS-9005 / Code No. N-001-31


- Probes used : SIUI Probes Welding Gauge : Not Applicable

Probe type 4Z8FG -- -- -- --


Probe crystal size 8mm -- -- -- --
Probe angle 0° -- -- -- --
Probe frequency 4MHZ -- -- -- --
Time Base Range 0-50mm -- -- -- --
- Calibration block : 1mm - 8mm Step Wedge / Code No: N-004-1
- Sensitivity block : Not Applicable

Scanning sensitivity level : - Parent metal-compression probe: First back-wall echo 80% full screen height
at sound parent metal.

Remarks : 1. All test results are as at time of testing.


2. All test locations are as directed by the client.
3. See the attached sketch for test locations.
NT-R-82 (25/10/2008) P.1
Lab Code No. : CNT230025 Page 2 of 3
Report No. : 0

Worksheet for Manual Ultrasonic Examination (Thickness Gauging)


Test Results

Description of Test Item : C3 HRSG - Air Tank TCV020&PCV068

Item Tested Location Tested Thicknes Measured Remark


Air Tank TCV020 P1 4.9mm --
P2 4.8mm --
Air Tank PCV068 P1 4.9mm --
P2 4.7mm --
-End-

Note:All Dimension are measured in millimetre.

Tested by : K.T.Wong Qualification : ASNT-SNT-TC-1A-Level II Date : 16-3-2023

Authorized by : Position : Manager - NDT Welding Date :


BABU, Vinodh Kumar ASNT-UT-Level 3
NT-R-82 (25/10/2008) P.2
Lab. Code No. : CNT230025 Page 3 of 3
Report No. : 0

Worksheet for Manual Ultrasonic Examination (Thickness Gauging)

C3 HRSG - Air Tank TCV020&PCV068 Valve

P1 P2 P1 p2
TCV020 PCV068

Test location for Air Tank TCV020&PCV068 Valve- P1 to P2

Remark: This sketch is not in scale.


Tested Area