20 Breathing apparatus
22 Torque wrench
26 PWHT Equipment
28 Welding Engine
31 Air compressor
32 Air dryer
33 Air blower
34 Personal gas detector
38 Lapping machine
38 Generator set PR MR AGRU 75 KVA
Specification
One (1) set of breathing apparatus EQUIPMENT supplied by CONTRACTOR shall consist of the followings:
1. One (1) air supply trolley unit (brand – Scott Safety) suitable for 2ea x Scott Safety air cylinder (cap. 6-7 liters 300 bars p
cylinder), fully adjustable cylinder bands, stainless steel tubular frames with wheels, handles, moulded hose reel drum
including anti-static airline hose (60 meters) complete with CEN couplings for up to 2-man use, valves, regulators and
suitable for Scott Safety Vision 3 positive pressure face mask supplied below
2. Four (4) carbon fibre fully wrapped aluminium composite cylinders (brand – Scott Safety) with capacity
6-7 liters 300 bars per cylinder, CE
specifications, CEN couplings, cylinder valves incorporating safety locking hand wheel.
3. Additional anti-static airline supply hose (60 meters) (brand – Scott Safety or equivalent) complete with male and fema
CEN couplings and suitable for Scott Safety Vision 3 positive pressure face masks supplied
4. One (1) Y-piece complete with CEN couplings (brand – Scott Safety)
5. Two (2) positive pressure face masks (brand – Scott Safety type Scott Vision 3) with 5-point fully adjustable neoprene
head harness, bayonet connection for demand valve
6. Two (2) FLITE airline apparatus (brand – Scott Safety type FLITE). Each apparatus shall include bandolier and hip
mounted cylinder harness (suitable for Scott Safety FLITE cylinder), 1ea x 2 liters 200 bars cylinder (brand – Scott Safet
FLITE), CE specifications, tempest automatic positive pressure demand valve, regulator, supply hose and pigtail with CE
couplings, suitable for Scott Safety Vision 3 positive pressure face mask
7. One (1) complete set of high-pressure stationary air compressor include a compatible cascade system and filling station
following specific details:
Charging Rate : > 680 l/min
Pressure : 225/330 bar with 2 selectable modes
Filling hose : 2x200 and 2x300 bar
Filling Valve : Include 4 (four) filling valves 200 & 300 bar (*) Motor : 3 (three) phase(s)
Electrical Power : 15 kW(400V-50/60Hz) connected with socket outlet type 3P+N 32A - electric cable minimum 5 meters
Sound level : Silent Mode < 75 dB(a)
1. Tohnichi/Proto/Elora/Stanley or equivalent
2. KAN certified
3. Square driver 3/8” with range 10-100 Nm (3 + 13)
4. Square driver 1/2” with range 20-100 Nm (3 + 13)
5. Square driver 1/2” with range 40-200 Nm (3 + 13)
6. Square driver 1/2” with range 50-250 Nm (3 + 13)
7. Square driver 1/2” with range 70-350 Nm (3 + 13)
8. Square driver 3/4” with range 60-300 Nm (3 + 13)
9. Square driver 3/4” with range 100-750 Nm (3 + 13)
1. Diesel engine driven complete with silent compartment and certified spark arrestor
2. Capacity 750 SCFM with discharge pressure up to 10 bars
3. Non-hazardous classification
4. Minimum IP56 complete with certificate
5. Complete with lifting frame and set as specified in COMPANY’s onshore CCU specifications
6. Complete with safety protection features (trip & alarm) such as over speed, low lube oil pressure, high engine
temperature, low fuel level and Emergency Shutdown (ESD) push button
7. Complete indicators to monitor operating parameters such as flow rate, pressure, speed, lube oil pressure, engine
temperature, fuel level
8. Each compressor shall complete with air distribution package including feed air hoses (Min 3/4” + 15 rolls x 20 me
each roll), manifolds with quick connect and water traps (2 EA), hose whip check, fittings, connectors, pressure gauges, reg
with, etc.
9. Suitable and sufficient to operate minimum five (5) hydraulic bolt torquing/tensioning pumps
10. Drip pan
11. Grounding cables completed with clamps
12. Equipment’s fast moving spare part (filters, hydraulic hoses, water trap spares such as cartridge with using cartridge sy
etc) & consumables for any contingencies
13. Emission gas compliance to environmental minister regulation no.13/2009
1. Portable air dryer for air outlet capacity min 800CFM and suitable for supporting 750 SCFM air compressor
2. Output air Dew Point -40 degC / 633 ppm
3. Complete set with 5 x 15 m hoses, adapter, whip-check, accessories with spark arrestor
4. Equipment’s fast moving spare part (filter cartridge and other consumables for any contingencies
5. Cable ground completed with clamps
1. Coppus RF-12 Reaction Fan Air Blower (Pneumatic air driven) or equivalent with Connection 3/4" Dixon Chicago Co
for air supply
2. Outlet flow of 2,100 to 5,100 cfm (3,566 to 8,665 m3/hr) at 80 psig air driven
3. Use for fresh air supply or fume exhaust
4. Low compressed air consumption
5. Spark-resistant, cast-aluminium housing and fan blade
6. Handle & support equipped at body
7. Each blower to be completed with:
- Air driven supply regulator
- ¾” Air supply hoses 5 x 20 m with Chicago Quick Coupling Connection
- Blow air duct with (5 x 20 m)
1. MSA Altair 5X with pump and probing or equivalent
2. MSA Altair 5X IR (Infra-Red) with pump and probing or equivalent
3. MSA Altair 4X or equivalent
4. Each type of gas detector shall be equipped with bump test station completed with consumable gas (mixed gas) for da
bump test during all TAR or Campaign duration
5. General specifications for all types above include:
a. Sensor gas readings:
• CH4 – Methane (IR %vol or non-IR %LEL)
• O2 – Oxygen (%vol)
• CO – Carbon Monoxide (ppm)
• H2S – Hydrogen Sulphide (ppm)
b. Explosion proof (EX) standards complete with certificates:
- IEC – Ex ia d IIC T4 Gb
- ATEX – Ex II 2G Ex ia IIC T4 Gb
- CSA – Class I Div 1 Groups ABCD T4, Class 1 Zone 1 Ex ia d IIC T4
- MED – (0038/YY) Modules B & E, A.1/3.30
CE
6. IP67 complete with certificates
7. Audible, visual, and vibrating alarm features
8. Rechargeable battery with running time > 14 hours
9. Charging unit complete with cable (100-240 VAC, 50-60 Hz
10. Calibrated complete with certificates
1. Lapmaster or equivalent
2. Size up to 24 inch
3. Three conditioning rings with roller yoke and bearing assemblies to facilitate in-process plate flatness control
4. Abrasive feed system designed for water or oil-based lapping slurries
5. Automatic digital cycle timer
6. Electrical system voltages 100-240 VAC, 50-60 Hz
Detail Diesel Engine Generator specification shall refer to Doc No. 420-SPE-EL-5001. It shall be completed with 1 unit distri
panel with following specification:
- Industrial type, metal enclosed, sheet steel 2 mm, wall mounted, RAL 7032
- Operating Voltage 220V (1ph)/380V (3ph)
- Ingress Protection minimum IP55
- Cable entry shall be at the bottom side
- Dimension and capacity shall be advised by Vendor
- Incoming breaker shall be sufficient to accommodate Diesel Engine Generator maximum capacity
- Incoming cable size shall be provided by Vendor, cable size shall be able to accommodate maximum generator capacity a
accordance with incoming breaker size
- Outgoing breaker shall be as following:
a. 6 ea MCB 2P 16 Amp
b. 4 ea MCB 3P 63 Amp
- Outgoing feeder shall be completed with outdoor socket as following:
a. 6 ea wall mounting socket 220V, 2P+E, 16 Amp including electrical plug, min IP 55 for outdoor installation
b. 4 ea wall mounting socket 380V, 3P+E, 63 Amp including electrical plug, min IP 55 for outdoor installation
Detail Diesel Engine Generator specification shall refer to Doc No. 420-SPE-EL-5001. It shall be completed with 1 unit distri
panel with following specification:
- Industrial type, metal enclosed, sheet steel 2 mm, wall mounted, RAL 7032
- Operating Voltage 220V (1ph)/380V (3ph)
- Ingress Protection minimum IP55
- Cable entry shall be at the bottom side
- Dimension and capacity shall be advised by Vendor
- Incoming breaker shall be sufficient to accommodate Diesel Engine Generator maximum capacity
- Incoming cable size shall be provided by Vendor, cable size shall be able to accommodate maximum generator capacity a
accordance with incoming breaker size
- Outgoing breaker shall be as following:
a. 2 ea MCB 2P 16 Amp
b. 2 ea MCB 3P 63 Amp for Electrical Welding Lincoln Aspect TIG 375 & 1 spare
c. 2 ea MCB 2P 125 Amp for Electrical Welding Lincoln Precision TIG 375
- Outgoing feeder shall be completed with outdoor socket as following:
a. 2 ea wall mounting socket 220V, 2P+E, 16 Amp including electrical plug, min IP 55 for outdoor installation
b. 2 ea wall mounting socket 380V, 3P+E, 63 Amp including electrical plug, min IP 55 for outdoor installation
c. 2 ea wall mounting socket 220V, 2P+E, 125 Amp including electrical plug, min IP 55 for outdoor installation
Detail Diesel Engine Generator specification shall refer to Doc No. 420-SPE-EL-5001. It shall be completed with 1 unit distri
panel with following specification:
- Industrial type, metal enclosed, sheet steel 2 mm, wall mounted, RAL 7032
- Operating Voltage 220V (1ph)/380V (3ph)
- Ingress Protection minimum IP55
- Cable entry shall be at the bottom side
- Dimension and capacity shall be advised by Vendor
- Incoming breaker shall be sufficient to accommodate Diesel Engine Generator maximum capacity
- Incoming cable size shall be provided by Vendor, cable size shall be able to accommodate maximum generator capacity a
accordance with incoming breaker size
- Outgoing breaker shall be as following:
a. 8 ea MCB 2P 16 Amp
b. 8 ea MCB 3P 63 Amp
- Outgoing feeder shall be completed with outdoor socket as following:
a. 8 ea wall mounting socket 220V, 2P+E, 16 Amp including electrical plug, min IP 55 for outdoor installation
b. 8 ea wall mounting socket 380V, 3P+E, 63 Amp including electrical plug, min IP 55 for outdoor
installation
T
1. Air compressor – function test and performance test for two (2) hours
2. Hose package installed with fittings, connectors and manifolds – 100%
successfully pressure tested (e.g hydrotest or pneumatic test)
3. Measuring devices (e.g. pressure gauges) – calibrated by reputable third-party
company/in-house accredited by National Accreditation Committee (KAN) or
equivalent
4. Pressure relief valves - calibrated
5. Indicators (as described above) – function test
6. Safety protection features (as described above) – trip test
7. ESD – function test
8. Primary Injection test for breaker
9. Documentation:
a. Manufacturing certificates, maintenance records
b. Testing reports,
c. Manual books
d. Spark arrestor
e. Primary Injection for MCCB
f. Calibration cert for instrumentation/ measuring device
g. IP certificates
h. Lifting point/Frame or Lifting Gears must be accompanied lifting design
calculation; COC
& TER (Thorough Examination Report) by LEEA third party inspector & its
company.
1. Visual inspection
2. Function test and performance test for two (2) hours
3. Package installed with fittings, connectors and regulator – 100% successfully
pressure tested
4. Hose assembly, complete with fittings and connectors – 100% hydrotested
5. Documentation:
a. Manufacturing certificates, maintenance records
b. Testing reports,
c. Manual books
d. Spark arrestor certificate
f. Calibration cert for instrumentation/ measuring device
h. Lifting point/Frame or Lifting Gears must be accompanied lifting design
calculation; COC & TER (Thorough Examination Report) by LEEA third party
inspector & its company
1. Visual inspection
2. Function test and performance test for two (2) hours
3. Air Supply hose assembly, complete with fittings and
connectors – 100% hydrotested
4. Package installed with fittings, connectors and regulator – 100% successfully
pressure tested
5. Documentation:
a. Manufacturing certificates, b. Maintenance records,
c. Testing reports d. Manual books.
e. Calibration cert for instrumentation/ measuring device.
1. Visual inspection
2. Calibration test
3. Function test (bump test) – gas test to be provided by CONTRACTOR
4. Documentation – manual books, manufacturing certificates, calibration
certificates, IP certificates, EX certificates
1. Visual inspection
2. Calibration test
3. Function test (bump test) – gas test to be provided by CONTRACTOR
4. Documentation – manual books, manufacturing certificates, calibration
certificates, IP certificates, EX certificates
1. Function test with refractory materials
2. Hoses, fittings, connectors –
100% successfully hydrotested with complete unit assembled
3. ESD test.
4. Documentation
a. Manufacturing certificates,
b. Maintenance records,
c. Testing reports,
d. Manual books
e. Calibration for instrumentation/ measuring device if required
1 ea
1 ea
1 ea
3 ea
See detail
each type
10 ea
2 ea
1 ea
4 ea
3 ea
10 ea
12 ea
4 ea
4 ea
45 ea
64 ea
41 ea
1 ea
1 ea
1 ea
2 ea
1 ea
1 ea