OFFICE OF THE
CONTROLLER GENERAL OF ACCOUNTS
iaierea
m
,
DIRECTORATE GENERAL MIS/FABS, ISLAMABAD
CGA Complex, FBC Building Sector G-5/2, ISLAMABAD
Ph: 051-92-9217457 Fax: 92-051-9208896
No. 5W /MIS/Proc/Misc. Procurement-issues/2022 October 6, 2022
The undersigned has been directed to submit further compliance report with respect to
uploading of additional bid evaluation and contract award documents on PPRA and organizational
websites in continuation of the compliance already made by this office after publishing of tenders bid
evaluation reports with contract award details on PPRA prescribed formats at Annex-IX (Technical Bid
Evaluation Report) and Annex-X (Final Evaluation Report) on PPRA and FADS websites.
In light of the specific clarification on the subject matter issued by the PPRA vide letters
dated 21.07.2022 (Annex-VIII) and dated 11.11.2021 (Annex-VII) and intimation to Transparency
International (TI) in compliance to observance of Rule 47 'Public Access and Transparency' of the Public
Procurement Rules, 2004 (Annex-XI), it is submitted that this office had already complied the existing
PPRA Rules, 2004 by publishing bids evaluation reports on PPRA's prescribed format and PPRA had
acknowledged it by publishing the Technical Bid Evaluation Report on their website by 23.02.2022 under
report Number EV39108 (Annex-MI) and Final Evaluation Report No. EV40301 dated 06.04.2022
(Annex-MID comprises additional details required (Bills of quantities with contract award) by TI.
(MUHAMMAD jAVED)
Accounts Officer (Coordination)
4 00 Al?' c
\4W
\L0 tktt FOce'
ai\ S:
0 c,e oz to an-I kr
t":00‘eettle‘
(‘tse Igivvy
CP
MOST IMMEDIATE
( .a ad Umair)
Deputy Secr tary(Exp-CGA)
Tel:- 9213930
Voft1/ 1/
,n
NASin t
lstant Accoun .s
"5te GeneTal
oliecto i a Gov at et qc
Controlle r
istamabad
Eg3 EL
Pri44A-
MOST IMMEDIATE
GOVERNMENT OF PAKISTAN
PRIME MINISTER'S INSPECTION COMMISSION
(Rflarnina
-INaeeni Jan Khan)
IViern$
"Secretary,
MinistrY of Finance and Revenue,
Islamabad.
A -cy t+1,-
1\ „sista^ Generakk ,cco unts
r
"e cttuc o\a‘t:e 'an :diP.
Co^ IOW
©2.
03 August 2022
TL2022/0803/1I
Mr. Flamed Yasoeb Sheikh
Secretary,
Ministry of Finance and Revenue,
Government of Pakistan,
Islamabad
Transparency International Pakistan has been monitors implementation of PPRA Rule 2004, and noted
non-compliance of Rule 47 by all departments. PPRA Rule 47 requires all procuring agencies to upload all
contract award agreements/documents along with rates/prices quoted/BOQ on the PPRA website.
47.
Public access and transparency. - As soon as a contract has been awarded the procuring
agency shall make all documents related to the evaluation of the bid and award of contract public:
On the report of TI Pakistan, the Managing Director PPRA vide letter F. No. 1
(5)/M&E/PPRA/20 18 dated
lith November 2021 issued following directives to all Procuring Agencies to provide requisite documents
pertaining to all procurements along with duly filled proformas, in compliance with Rule 47 (Annex-A).
Quote
"The Authority vide letter of even No. dated July 01, 2021, (copy attached) required all procuring agencies
to submit documents related to the evaluation of the bid and award of the contract * without any reference to
the contract amount) for uploading on the PPRA webslte, as enshrined under Rule 47 of Public Procurement
Rules, 2004 ancl Regulation (2) of Public Procurement Regulations, 2009. However, it has been observed
thql, pro" illtreilehOtyire in partial compliance of the said requirement by submitting the requisite
'related to few procurements.
once again requested to issuelluctructions to all procuring agencies under the administrative control
Mi
avision to provide riiè.site documents pertaining to all procurements along with duly
ched with the abeUe enwl letter,
ched) so that t Ø4. .4kmay (which includes the requirement of a copy of the
ri! be uploaded on the Authority website to ensure public
47 of the Publigkifecurement Rules 2004, as soon as the contract has been awarded
hall make ments related to the evaluation of bid and award of contract public.
en df4:o evaluation of bid also include bill of quantities or schedule of
requirement, whereas the documents related to award of contract include form of contract and
award. letter of
In view of the above, you are hereby required to upload all the documents related to evaluation of bid
including bill of quantities or schedule of requirement, and documents related to award of contract including
form of contract and letter of award on the Authority Website to ensure public access and transparency in
accordance with Rule 47 of the public Procurement Rule, 2004".
Unquote
The Secretary Ministry of Finance and Revenue is requested to issue directives to all the following
departments to follow PPRA Rules 47, provide PPRA the requisite documents pertaining to all procurements
along with duly filled proformas attached with the above referred letter, (which includes the requirement of
a copy of the agreement to be attached) so that the same may be uploaded on the PPRA Authority's
website to ensure public access and transparency.
TI Pakistan is striving for across the board application of Rule of Law, which is the only way to stop
corruption and achieve zero tolerance against Corruption.
With Regards,
IA M4
N _I/ ti ps1RmI—GLotuiCritsmo‘isti.cceikies1
to ,Pescst‘ostlaatneitteenne ltaall ko.it AciC ° WI"
- Con"" ‘stainab"
4. •
Amvux-Lte than_
Annex-B
4-C, Mezzanine Floor, Khay3ban-e-1ttah5d, Phase VII,
RANSPARENCY Defence ,Housing Authority, Karachi.
NTERNATIONAL-PAKISTAN Tel: (92-21) 95390408, 35311897-8,
Fax: (92-21) 35390410
E-mail; tl.paidstan©gmall.com
Webslte: wenttransearency.org.pk
Sub: yialialai
PPRA Webs'et
te of Communication
under ubne in the Publication of the Contract A reements n
0 Rule 47 mi neat Rule 50
Dear Sir,
Transparency International Pakistan monitors implementation of PPRA Rule 47 (quoted below) which
requires all procuring
on the PPRA website. agencies to upload contract award agreements along with rates/prices quoted/BOQ
47.
Public access and transparency. - As soon an contract has been awarded the procuring
agency shall make all documents related to the evaltration of the bid and award of contract public:
On 22s October 2021, Section Officer Ministry of Communication vide letter No.
6(3)/2020-Road-I
addressed to Chair
and enclosed and Vice Chair Transparency International Pakistan stated the following
as (Annex-A): quoted below
Quote
"However, it is pertinent to highlight that PPRA has circulated two proformas as Attaclunent-I and
Attachment LI (enclosed) for uploading the information regarding contract award in compliance of
Rule 7 of Notification S.R.0.805 02003 of PPRA. PPPRA Rule 47 does not require uploading of BOQs
ratherUnqini
it demands uploading the information i.e. tender cost, awarded cost and other details of bids"
ote
SPPIZA Rule 51 and BPPRA Rule 56 are quoted below fbr your reference:
SPPRA Rule SO: publication of the Award of Contract - Within fifteen (15) days of
signing of contract, procuring agency
shall publish on the website of the Authority and on
its own website, if such a website exists,
the results of the bidding process, identifying the
bid through procurernerd identifying number, if any, and the following information:
ecwitWOL EItaluation Report;
gam of Coritract and Letter of Award;
Bill of Quantities or Schedule of Requirement.
BPPRA
of Rule 49. Publication of the Award of Contract - Within forty-five (45) days
the award of contract, Procuring Agency shall publish
and on its own website, on the website of the Authority
if such a website exists, the results
of the bidding process,
identifying
information:the bid through procurement identifying number, if any, and the following
TI Pakistan has consistently informed Ministry of Communications that PPRA Rule 47, SPPRA Rule 50
and BPPRA Rule 49 have been incorporated with a view that the
rates, prices and monthly remuneration
of consultants/experts are to be known to the public, whereby public can scrutinize any overpriced
rate/purchase by comparing prices for similar procurements by different departments. It may also be
noted that such attempts are the efforts by Ministry of Communication to hide the rates (BOQ rates) of the
contracts awarded, and in accordance with PPRA Rule 50, noncompliance of any of PPRA Rules amount
to mis-procurement.
"The Authority vide letter of even No. dated July 01, 2021, (copy attached) required all procuring
agencies to submit documents related to the evaluation of the bid and award of the contract * without any
reference to the contract amount) for uploading on the PPRA website, as enshrined under Rule 47 of
Public Procurement Rules, 2004 and Regulation (2) of Public Procurement Regulations, 2009. However,
It has been observed that procuring agencies are in partial compliance of the said requirement by
submitting the requisite documents related to few procitremena
You are once again requested to issue instructions to all procuring agencies under the administrative
control of your MMistry/Division to provide requisite documents pertaining to all procurements along
with duo,
filled profotmas attached with the above referred letter, (which includes the requirement of a
Spy of the agreement to be attached) so that the same may be uploaded on the Authority's website to
ensure public access and transparency".
However, the contracts award information along with BOQ rates of Ministry of Communications are still
not uploaded under the "Procurement Contracts" section on the PPRA website.
TI Pakistan requests the honorable Prime Minister to issue orders for the compliance of PPRA Rule 47 by
Ministry of Communications and all other Ministries to publish a) Contract Evaluation Report;
(b) Form of Contract and Letter of Award; and (c) Bill of Quantities or Schedule of Requirement
along with contracts on PPRA website.
TI Pakistan is striving for across the board application of Rule of Law, which is the only way to stop
corruption and achieve zero tolerance against Corruption.
With Regards,
Copies forwarded for the infonnition with request to take action under their mandate to:
I. MD PPRA, PPRA, Islamabad
2. Registrar, Supreme Court of Pakistan
Office of the
h f
aUDITOR-GENERAL OF FAKItYrAN
Constitution Avenue
j , ISLAMABAD
No. /0//20-Coord/C/2021-22
Date: /08/2022
To,
to
o _. -
0 0 .... •
C) z
E' 5., "";
,
F; 0 c 4
MOST liktIMEDI"),..,.
1-
A pre;
°-rit
e
br r
C.
0 Oitt '
t.
-tr,
0
LUNATION SECTION
GOVERNMENT OF PAKISTAN
PRIME MINISTER'S INSPECTION COMMISSION
Secretary,
Ministry of Finance and Revenue,
‘10
tok" 000
00%s s
14‘ on`
TAcc. NCC°
•!.
C•SS‘st-ste"%elt‘:
etV% vi% sOSI)
uo‘ VP%
CO •
(7?) A itga -Yr
Annex-A
F.Na. 1(5)/M&E/PPRA/2018
PUBLIC PROCUREMENT REGULATORY A
UTHORIT
CABINET DIVISION
GOVERNMENT OF PAKISTAN
Managing Director
Islamabad, the 11 th
November, 2021.
Subject: PUBLICATION OF
CONTRACT AWARDS ON PPRA's WEBSITE
WITHOUT ANY REFERENCE TO THE AMOUNT OF CONTRACT
The Authority vide letter of even No. dated July 01, 2021, (copy attached)
required all procuring agencies to submit documents related to the evaluation of the bid and
award of the contract (without any reference to the contract amount) for uploading on the
PPRA's website, as enshrined under Rule 47 of Public Procurement Rules, 2004 and Regulation
(2) of Public Procurement Regulations, 2009. However, it has been observed that procuring
agencies are in partial compliance of the said requirement by submitting the requisite documents
related to few procurements.
2.
You are once again requested to issue instructions to all procuring agencies
under the administrative control of your Ministry/Division to provide requisite documents
pertaining to all procurements along with duly filled proformas attached with the above referred
letter, so that the same may be uploaded on the Authority's website to ensure public access and
transparency.
End: as above
CC:
Director (MIS), PPRA with the direction to upload the same on the Authority's
website for compliance.
\\__j INP`S‘CC:citersNIN36t°4
tts05 ste c's 36`%‘ 36
0 , cat ost
1st
Floor, Federal Bank for Cooperatives Building, Sector G-5/2, Is act ad-Pakistan
Tel; +92-51-9224824, Facsimile: +92-51-9224823
e-mail: mdppra@ppra,oriok
Atta-0
G3vernmeni of Pakistan Annex-C
Public Ptocurernent Regulatory Authority
(Monitoring & Evaluation Wing)
<><><>
No: 01(23)/M&E/PPRA/2018/61
Islamabad, July ).), 2022
Subject: VIOLATION BY MiNiSTRY OF COMMUNICATION IN THE
PUBLICATION OF THE CONTRACT AGREEMENTS ON PPRA
VVEBS3TE UNDER PUBLIC PROCUREMENT RULES
MIS-PROCUREMENT RULE 50 2004 RULE 47
It is apprised that this Authority has already issued instructions vide letter
dated July 01, 2021 and November 11, 2021 (copy attached), wherein all the procuring
agencies were directed to provide requisite documents pertaining to all procurements
along with duly filled proforma's attached with the above referred letter, so that the same
may be uploaded on the Authority's website to ensure public access and transparency.
In view of the above, you are hereby required to upload all the documents
related to evaluation of bid including bill of quantities or schedule of requirement, and
documents related to award of contract including form of contract and letter of award on
the Authority Website to ensure public access and transparency in accordance with Rule
47 of the Public Procurement Rules, 2004.
1,10
(Muh4rtcj Ibrahim R. Khan)
Section Officer (General / Adman) Deputy Director-III (M&E)
Ministry of Communications
Islamabad.
Cc:
1. Wis.
Yazeneen LEN, Chairperson, Transparency International Islamabad
2 PS to Managing Director,
Islamabad. Public Procurement Regulatory Authority,
ATTACHMENT — I
(See regulation 2)
PUBLIC PROCUREMENT REGULATORY
AUTHORITY (PPRA)
CONTRACT AWARD PROFORMA — I
To Be Filled And Uploaded on PPRA Website In Respect of All
Public Contracts of Works. Services and Goods Worth Fifty
Million or More
NAME OF THE ORGANIZATION/DEPTT: Office of the Controller General
of Accounts/ Directorate General Management Information System (MIS)_
> FEDERAL / PROVINCIAL GOVT: Federal Government
TITLE OF CONTRACT: Procurement of Centralized Servers and Network
Firewall Solutions for Financial Accounting and Budgeting System (FABS)
TENDER NUMBER: IFB-30/MIS/FABS/Proc/Basis-N.W/2021
BRIEF DESCRIPTION OF CONTRACTS The Contract was related to
Procurement of Hardware goods including Database Server Machines,
storage drives, backup software and Network Solution comprises firewalls,
switches and Virtual Private Network Licenses Subscription for centralized
FABS data Centre at AGPR Islamabad.
). TENDER VALUE Rs763,180,390/- (Total Actual value)
ENGINEER'S ESTIMATE Not Applicable
(for civil Works only)
ESTIMATED COMPLETION PERIOD (Hardware Delivery time 8-12 weeks)
ADVERTISEMENT:
). NUMBER OF BIDS RECEIVED 04-Four (one bid for Lot 1,2,3 and one bid
for Lot-3 Network Hardware and two bids for Basis Turnkey Solution).
Special Condition Clause 11-Payment: 85% Payment of the total contracted price on
satisfactory delivery of complete hardware with required quantities duly signed and
authenticated by Team Leads and 15% payment on receiving of duly signed and
authenticated satisfactory Operational Acceptance Report (OAT) of the Hardware.
[F.No.2/1/2008PPRA-RA.III]
@f7)
A-v\v-tv A
1 WS Multilynx 2,500
.i p‘t
05 k i,s.c.°:axk‘1% scccg
sis
r toeitet Gesec
osbse
seci to#1 p‘a
GO
, OFFICE EistKO
nlr /110.,
CONTIZOLLER GENERAL OF ACCOUNTS
IR 0 - MGENEIZA A MIS, IS 1MM Ps
CGA Complex, l:BC Building Sector G-5/2, ISLAMABAD
Ph: 051-92-9202753 Fax: 92-051-9208896
Sr. No. Description of the BASIS Turnkey Solution Quantity Total Bid Price
in (PI(R) inclusive
t n Amber of all taxes-
Delivered, duty
i aid etc
01 BASIS Servers and Allied Equipment Turnkey Solution for Rs.671,512,199/
Primery Itid DR Site with 3' generation scalable
proeessorb hr Centralized Data Centre with 05 Years fl_A
(Quanti:v. Content meaning for all bid items to be read as
(corrected bid
pm- Tect Meal Specifications approved by the Technical Rid
Evaluator' Committee under Technical bid of price after
Ms Mortriyni .srom page 11 to 37): arithmetic
_ calculation)
SAP HANA Database, Application and Backup iiO3
Servers ( HP Server with Intel Xeon-Platinum 8376HL '
(2.6 GlIz/28-core/205W) for Data Base- Scalable -
HI' Server with intel Xeon -Platinum 8358 1012
(2.6 Gh- 32-core/250W) , H? Silver Server Model)
/ A
iv) Software- VMWare , SUSE Linux, MicrLosat with 05 01
years subscription (Qty and details in Technical
'. Specifications),- I ' ..-
Hardware
P . delivery time (
Backup Software-Veeam, 01 period i.e
Tape Libraries-LT0-8-MSL3040-Store Ever-Scalable Minimum
02
library 56 days to
Maximum
Flash Storage Solution-HPE Alletra 9060-100 TB 02 84 days.
useable for Primary site and HPE Alletra 9060-50TB
useable-NVMe storage for Primary and DR Site,
S( rver
_ Racks (42U)- 600mm*1200mm Rack, Ai) 04
Tynings for 06 Human Rs:sources in administration xi-;;) 06
of Servers, Storage, disk base Backup appliance, Veeam ILT
and VM Ware Trainings from Internationally
Recognized/certified Master Trainer and physically in
certhied/partner Institute of the OEM (not Virtual ILT).
;.;ervice Level Agreement for 5 Years (24 hours* 'NH) 01
7 days hardware, software support, with 5-6 dedicated
technical human resources for DR site/04 AGs/AGPR
offices)-Maximum up to 4 Hours Response and restore
time-maximum hp to 48 hours parts replacement.
-
Total PurchiSe drder/Commitment Price for BASIS Solution I. 671,512,199/-
with Five (05) years SLA [w.e.f OAT/final testing -go live date] r
7. Any deviation from the specifications given in the offer shall.b1 deemed as violation of
this document and may result in cancellation of the Purchase lirder, even if the product
required has been delivered.
8. The rates accepted are for Delivered Duly Paid (DDP) and are inclusive of all taxes and
duties payable by M/s Multilvin as per laws of Islamic Repul.iic of Pakigtan.
9. Income tax will be deducted at source as per FBR rules & regultaions; if applicable.
(page 3 of 5)
10. The 85% payment will be made to M/s Multilynx upon satisfactory delivery and
pre-inspection of the actual hardware with delivery challans mentioning the actual
quantity as per approved technical specifications by the Team Lead BASIS/BASIS
Expert. The remaining 15% payment will be made on receiving of Operational
Acceptance Tests (OATs) reports on attached format, duly verified by the Team Lead
Basis . or authorized FABS Representative alongwith submission of complete
documentation comprising bill of entry, sales tax invoice, warranty certificate,
shipment vouchers, manuals, CDs and other technical literature of the hardware etc will
be submitted by M/s Multilynx as per requirement of the AGPR for releasing payment.
Authority: Director General MIS/FABS (Head of Department) Approval vide oara I15/N dated 23.04.2022
Regulations: PAO Regulations Act, 2021
End:
Ackildivledgement of Purchase Order/LOA
Integrity Pact form
Non Disclosure Agreement (NDA)
Copy of Bid Approved by Committee
OAT Format
(page 4 of 5)
C4D
i
Bill of Quantities (Hardware, Software, Services)
Technical
Specifications at
Sr. No Basis Items Qty Reference Page
number in bidding
document
SAP HANA Database Servers 02
1 Page 56-57
(Primary Site)
SAP HANA Database Servers 01
2
(DR Site)
Application Servers for SAP Dialog, Page 58
3 08
PO, BW4Hana and other Instances
Application Servers for SAP Dialog, Page 59
4 04
PO, BW4Hana and other Instances
Backup Servers Page 60
5 02
(One for primary and one for DR site)
All Flash Enterprise Storage Page 61
6 02
(One for primary and one for DR site)
SAN Switches (Two for primary and Page 62
7 04
Two for DR site)
Tape libraries Page 63
8 02
(One primary and one for DR site)
Disk based backup appliance Page 64
9 02
(One primary and one for DR site)
KVM Switches 02
10
(One primary and one for DR site) Page 65
Server Racks (4213) (Two for primary 04
11
and Two for DR site)
Backup Software (Qty in
12 Page 66-67
(Qty in details specifications) Specs)
. eA
01/4 ot‘c• \
„s‘ v. 00 ets
k‘r% NCC k COI)
s'eaSk GeW a ok
PSs cei‘e eet‘e"..36
eck° \el
ow to` \s‘a
coo
'• CP, c)
Note: Goods delivery time period of 08-12 weeks (i.e 56 days to 84 days) includes all days
(work and off work days i.e including public and other holidays).
2. The details of Hardware, quantity and approved bid price is given below for
claiming 85% payment on successful delivery of the hardware and 15% on satisfactory testing
till go live of the network hardware on Operational Acceptance Testing verified by the Team
Lead Network FABS
Sr. No. Description of the Network Lots Quantity Total Bid Price
in (PKR) inclusive
number of all taxes-
Delivered, duty
paid etc
Lot-I-CISCO Core hrcwalls 04 i)Rs. 36,433,645/
(Part No. ClSCO/FPR4 II 2-NGFW-K9/USA)
(page I of 4)
3. You are requested to submit the following documents for further signing of the contract
Bank Guarantee/pay order only in favor of DDO, Directorate General MIS as per
ITB Sub clause 33.1 of the bid soliciting document (Network Items) within 15
5. You are requested to please coordinate with the above mentioned Technical
(page 2 of 4)
v,I1t•t .‘0% 5\
\
a v,Oka„okkc.1081„
Nvhsor tee\ oa‘C``
s‘s% ker't oets 0
;60% \ 0 5 alGap
to°
In ease of any delay, late job/service Delivery Charges @0.2% to 1.0% of undelivered
portion of hardware per week will be levied beyond the time of hardware delivery,
Any deviation from the specifications given in the offer shall be deemed as violation of
this document and may result in cancellation of the Purchase Order, even if the product
The rates accepted are for Delivered Duty Paid (DDP) and are inclusive of all taxes and
duties payable by M/s Wateen Solutions Pvt Limited as per laws of Islamic Republic
o I Pakistan.
Income tax will be deducted at source as per FBR rules & regulations, if applicable.
The 85% payment will be made to M/s Wateen Solutions Pvt Limited upon
satisfactory delivery and pre-inspection of the actual hardware with delivery challans
mentioning the actual quantity as per approved technical specifications by the Team
Lead Networks. The remaining 15% payment will be made on receiving of Operational
Acceptance Tests (OATs) reports on attached format, duly verified by the Team Lead
documentation comprises bill of entry, sales tax invoice, warranty certificate, shipment
vouchers, manuals, CDs and other technical literature of the hardware etc will be
submitted by M/s Wateen Solutions Pvt Limited as per requirement of the AGPR for
releasing payment.
Authority : Director General MIS/FABS (Head of Department Approval vide nara 1)51N dated 23.04.2022
Regulations: PAO Regulations Act, 2021
Ends:
I. Acknowledgement of Purchase Order/LOA
Integrity Pact form
OAT Format
(page 3 of 4)
Bill of Quantities (Hardware, Software, Services)
Networks Items (Lot 1,2,4)
M/s Wateen Solutions Pvt Ltd
Page Ref of
Sr. No Networks Items Detailed
Qty
Technical
Specifications
Lot-I Core Firewalls with allied
04 Page 31
items as per approved specs.
Core Switches with allied
Lot-2 . 04 Page 32
items as per approved specs.
Note for strict compliance: Goods delivery time period of 08-12 weeks (i.e 56 days to 84
days) includes all days (work and off work days i.e including public holidays).
The contractor will provide weekly Report through nominating a focal person of contact with
manufacturer and related departments with respect to the placing of order, manufacturing, loading and
departure of consignment from shipment tracking, landing on sea port/airport, custom clearance, and
departure from Karachi to Islamabad under intimation to purchaser from time to time.
Contractor will also share list of critical inventory spares, software licenses details, source, origin,
make, model, year of manufacturing of all items under supply.
A separate warranty certificate will also be provided by the contractor on its letter head along with
standard manuals, warranty certificate and other supplementary material related to the consignment.
2. The details of Hardware, quantity and approved bid price is given below for
claiming 85% payment on successful delivery of the hardware and 15% on satisfactory testing
till go live of the solution on Operational Acceptance Testing verified by the Team Lead
Networks FAB S:-
Sr. No. Description of the Network Lot-3 (part number) Quantity Total Bid Price
in (PICR) inclusive
number of all taxes-
Delivered, duty
paid etc
SRX4200-SYS-JB-AC 04 Rs.25,846,134/-
SRX-SFP-10GE-SR 08
Ho Ex-SFP-100E-DAC-1M 04
iv) 08
SRX-SFP-10GE-DAC-3M
SRX-SFP-1G-T 24
PAR-RTF-SRX4200JB 04
(page 1 of 4)
3. You are requested to submit the following documents for further signing of the contract
agreement on legal instrument of the required denomination:
Submit the performance guarantee amounting to Rs. 2,584,6 131- (10% of the total
purchase order price) within 15 days of the receipt of Purchase Order/letter of
Acceptance in light of the ITB clause 33.1, G.C.0 Clause 7 and S.S.0 Clause 3.
The validity of the Bank guarantee (10%) should cover satisfactory delivery time
period and preliminary inspection of the required quantity of hardware as per
approved specifications.
The 10% performance guarantee shall be reduced to 2% of the purchase order
price on satisfactory delivery, preliminary inspection of the hardware as per
approved specifications, quantities of the items under turnkey solution.
The validity of the financial instrument (bank guarantee or CDR-R of 02%)
should cover the contract validity period including warranty time effective from
the satisfactory OAT/Final testing/go live date.
The period of performance guarantee should be submitted in shape of CD-R/
Bank Guarantee/pay order only in favor of DDO, Directorate General MIS as per
1TB Sub clause 33.1 of the bid soliciting document (BASIS Items) within 15 days
after receipt of this Letter of Acceptance/ Purchase order.
To provide and sign the Integrity Pact form per attached format on legal paper of
required denomination or letter head of your firm in accordance with the PPRA
Rules 2004.
Signing of Non Disclosure Agreement (NDA) as per attached format on letter
head of your firm.
6. In case of any delay, late job/service Delivery Charges @0.2% to 1.0% of undelivered
portion of hardware per week will be levied beyond the time of hardware delivery,
subject to a maximum of 10% of the purchase order/contract price.
(page 2 of 4)
'es
Any deviation from the specifications given in the offer shall be deemed as violation of
this document and may result in cancellation of the Purchase Order, even if the product
The rates accepted are for Delivered Duty Paid (DDP) and are inclusive of all taxes and
duties payable by MIS Premier Systems Pvt Limited as per laws of Islamic Republic
of Pakistan.
Income tax will be deducted at source as per FBR rules & regulations, if applicable.
The 85% payment will be made to MIS Premier Systems Pvt Limited upon
satisfactory delivery and pre-inspection of the actual hardware with delivery challans
mentioning the actual quantity as per approved technical specifications by the Team
Lead Networks. The remaining 15% payment will be made on receiving of Operational
Acceptance Tests (OATs) reports on attached format, duly verified by the Team Lead
Networks or authorized FABS Representative alongwith submission of complete
documentation comprises bill of entry, sales tax invoice, warranty certificate, shipment
vouchers, manuals, CDs and other technical literature of the hardware etc will be
submitted by M/s Premier Systems Pvt Limited as per requirement of the AGPR for
releasing payment.
number 051-9208896 and send one signed original copy of this Purchase order by
Authority : Director General MIS/FABS (Head of Department Approval vide para 115/N dated 23.04.2022
Regulations: PAO Regulations Act, 2021
Ends:
.1. Acknowledgement of Purchase Order/LOA
OAT Format
(Faz bbas Jaffery)
Accou Ifficer (Admn)
(page 3 of 4)
Bill of Quantities (Hardware, Software, Services)
Networks Items (Lot 3-Distribution Firewalls)
(M/s Premier Systems Pvt Limited)
Page Ref of
Detailed
Sr. No Networks Items Qty
Technical
Specifications
Distribution Firewalls with
allied hardware items as per Page 52
Lot-3 04
details in approved technical
specs. and copy of bid.
C (0-Delivery Schedule (IFB-30)
(M/s Premier Systems Pvt Limited)
For Lot 1 to 4:
Mr. Qaiser Nadeem
Minimum 08 Team Lead Networks
to Maximum 2" Floor, Office of the
12 weeks AGPR, G-8/4,
Lot-3 Distribution Firewalls 04
(i.e 56 days to Islamabad.
84 days) w.e.f 051-9107240
23.04.2022 0300-5233790,
qaiser@cga.gov.pk
Note for strict compliance: Goods delivery time period of 08-12 weeks (i.e 56 days to 84
days) includes all days (work and off work days i.e including public holidays).
The contractor will provide weekly Report through nominating a focal person of contact with
manufacturer and related departments with respect to the placing of order, manufacturing, loading and
departure of consignment from shipment tracking, landing on sea port/airport, custom clearance, and
departure from Karachi to Islamabad under intimation to purchaser from time to time.
Contractor will also share list of critical inventory spares, software licenses details, source, origin,
make, model, year of manufacturing of all items under supply.
A separate warranty certificate will also be provided by the contractor on its letter head along with
standard manuals, warranty certificate and other supplementary material related to the consignment.
r_
5
Seal and Signature by the Contractor
c
07;0•Gc",,,z‘;,csio
p,s`croc 'sseece‘036
VGoouo \S
(.1\w 0.-c.)
Moit Iminediate jj(t4
OFFICE OF THE
CONTROLLER GENERAL OF ACCOUNTS
DIRECTORATE G,ENE 't L.MIS/FABS, ISLAMABAD
CGA Complex, FBC Building Sector G-5/2, ISLAMABAD
Ph: 051-92-9214620 Fax: 92-051-9208896
fv) V.ANWAR-UL-HAQ
M/s Multilynx
7th Floor,
Office # 702,
Green Trust Tower
Near OGDCL & UBL Building
Jinnah Avenue, Islamabad.
Reference your bid dated 14.02.2022, please find enclosed an original copy of
the Technical Bid Evaluation Report (IFB-30) in continuation of already published BER on
PA to DO (MIS/?ABS), Islamabad.
Nkt1).‘410‘5 s$1
Vilt‘t‘tik‘°‘SiC ts
sto. P
ttkt, I Ss\1/410.1t% peg°
c:::e
k sv• sxe /01‘
r ettal C>e oat
CDS
Most Immediate 1-9se—
OFFICE OF THE
CONTROLLER GENERAL OF ACCOUNTS
t • DIRECTORA E GENERALMEWFAI3S, LANLABA
CGAtornplex, FBC Building Sector G-5/2, ISLAMABAD
Ph: 051-92-9214620 Fax: 92-051-9208896
Reference your bid dated 14.02.2022, please find enclosed an original copy of
the Technical Bid Evaluation Report (IEB-30) in continuation of already published BER on
Afr 1
Each (10 Pages)
krtivitiog,)pa2,
Assn. Accounts Officer (Proc & CM)
okt
\---) ‘tet Ptat tottce;:es`
ot \,0 I 00
10.5s‘st tec't°
tots 0 se°03"4
ost'
nweet00 ‘svi
v Gat
CAy‘w2y-e,)
Most Immediate
OFFICE OF THE
CONTROLLER GENERAL OF ACCOUNTS
DIRECTORATEIGEN L MIS/FANS, I'SLAMABAD
GA Complex, FBC Building Sector G-5/2, ISLAMAEAD
Ph: 051-92-9214620 Fax: 92-051-9208e6
0•1•1•11,
Reference your bid dated 14.02.2022, please find enclosed an original copy of
the Technical Bid Evaluation Report (IFB-30) in continuation of already published BER on
The r,Tubsc ntation of M/s 13L Unisys was considered on ment:: by the
Grievance Rediess1:1 Committee in compliance to PPI,A Rules 2004 Sub RciP 48, but was
not accert:u to having no merit.
,
s issues with the approval of Chairman Grievance ed, r C'omm,ttee.
Director (FADS)
Copy to:
7e Membd CRC
TB No:30
To:
DIRECTORA GENERAL NIIS/FABS
CONTROtR GENERAL OF ACCOUNTS
Sector -5/2, ISLAMABAD
Dear Sir
As per technical evaluation published on PPRA website on dated. 23/02/2022,
Where our bid (Ws IBL Unisy,f) has beer. disqualified due to follow reasons
1- Processor
2-Tape library.
8 X Primary Site Application Servers for SAP Dialog, PO, BW4Hana and other Instances
Compliant-1
HS No Paran'eters Requirement Quoted processor
•
x Intel Aeon Gold
Ode: Xecii Scalable
6330 2G, 28C/581,
:giririm Processor or latest
.2(5" 7s. 42M Cache, V
1 le 1 Processor ; with 28 Gores must be listed
Turbo, HT (206W)
61' le ! on SAP RANA certified
DDR4-21333
! hardware ditecrary
2 x LT0-8 Tape libraries (one fee Primary and one for DR sire)
r- —r
; P4nter
raie ; Functionality I Ouelnd Tape Library ComPliant •
-V _1 MN) !
•
Stinit be cPereti with filininw-n ; Tape Library [2 x LTC- !
; of 2 LIO.S EC rape drive and a ML311`.A 3E FO Tape
! minimum or 40 cartridge :ACAS. Libraryj ve;th TO!
! Shall support encryption:. slots Expansion
Refeiance to skive table. we have quoted (one stop/one window SAP HANA
Rointion'i the iiitest !nisi Gen3 28 Cocos which is listed on SAIL ihANA
certified P2iidware directeiy as per tender documents along with fill_3/E tape iihrtlry
with 40 slurs I nue. We have asse shared our comoliance as pef your requirement
which cleariy show(s) quantities mentioned in Ri:P.
Ptage I of 7.
.011L-Unisys (Pvt) Limited
An !BL Group Company
Rek•rence to PPRA rule # Rule 35 of PP Rules. 2004. We are hereby submitting our
grievances and we would like to request you for a personatheering in order to defend
our case.
m ite
Cc:
Assistant Accounts Officer (Prcc & CM)
The Deputy Director (IT) PPRA for uploading on to PPRA Website.
.3. The Deputy Director (FABS) for uploading on tos FAGS Website.
4. PS to the Deputy CGA (FABS/MlS), Islamabad.
Page 2 ot 2
D.0 OW' 951
eAS tktS f
IltSe;;LPG°13@i8\ 1t1",,,Scit,o0"
Ns aisle GOeane0 10"
KARACHI: LAHORE: ISLAMABAD:
okietOsIraisr0036
2nd Floor, One IBL Centre, DMCHS 10th f low, Office # 1014, IlfgbeRdwer, " 2nd Floor, Emirates Tower, M-13,
Tipu Sultan Road, Off Shahrah-e-Faisal, Plot # 1., GJIberg 5, Jail Road, Lahore - Pakistan. F-7 Markaz, Islamabad - Pakistan.
Karachi - Pakistan. Tel: +92 213 717 0200 Tel: + 92 42 3577 5580 Tel: + 92 051 209 9129
•
Anktx—.1X.
TOP PRIORITY
OFFICE OF THE
CONTROLLER GENERAL OF ACCOUNTS
II], w 0] nli are DM Dittit3 3.3orin—ri irrn
(GA Complex, FBC Building Sector, G-5/2, ISLAMABAD
Ph: 051-9208808 Fax: 92-051-9208896
open financial bids of the technically qualified bidders according to the Single Stage-Two
End: (08)
ehmood)
Accounts Offi er (Proc & CM)
CC:-
OVii14.0 \l't \ 0 \
7 eit 0 401SIC
C‘CG° ‘1".;•6°
S.C61‘ egt ON 1)\
OS\ tl3kB Gel'a i"
et \ t
OM AO ‘S
03-
OFFICE OF THE CONTROLLER GENERAL OF ACCOUNTS
Irrrimn
TECHNICAL EVALUATION REPORT (As per Rule 35 of PP Rules, 2004)
(Zaf. mood)
Acco ts Of cer (Proc & CM)
Copy to:
ot At\ t„Nertiv•ttp;ss)
t mcou 1/4tios onts
lkstsit:te Gja,:
eltaal vt,t Mce
%le° pet inab"
coati Oa
• AvAvve_4( —R
(41
,
( 11(1 r
(Marks/
Weightage
(%age) or
Mandatory)
Signed Bid Acceptance By accepting bid form is Tick mark any
Forms at the top of each mandatory to comply one:
bid. Integrity,secrecy of Stibinfssion of
b 'ding process, bid data, Responsive- Tech lic ... Bid
(Technical + financial) secrecy of the bidding Yes submission form to
for complying all personnel identification, 134-) placed at tor) of
bidding terms and •
system policies, tet Hical bid
conditions as well as procedures, security of Non
cqmpliance of Non data, disclosure of Responsive/
D§closure agreem7nt. hardware with its type, Rejected Bid-Nc SubmisEion cf
teornmissionig of financlal Bid
-bar! ware, forging \Ix- )...ptan, e form tc
/faisifying ;counterfeiting lot paced at iop of
, in submission of technical finR-Icial bid.
and financial bids, money Mandatory
laundering, ban on bidder,
monopoly, caterlization,
hidden ills/agreements,
blacklisting, negative
htigetion affecting the
iational and international
.egal status of bidder/firm
in performance of bidding
or contract and affecting
I the image of country at
i national or international
I level, imposition of
I sanctions/fine/punishment
I by any national or
I internationally
MS R ALI KHAN
cAs3Istan 4ounts Officer
Lee
e ar (MIS 'CABS)
Conlroller 0 naval of Accounts
Islamabad
rt.'s\ LS, 11 .7 2-4.cbg
recognized/certified L1/4
forum, any sum of
currency, goods, works, b741-Z-ti
fc
services as bribe,
commissions, gifts, bonus,
donation, charity,
ratifications, inducement
of any type,whatso ever
named/called shall not be •
occurred/disclosed/ given -
prior to bidding, during
1 bids evaluation ane, in post
contract award period with
a compliance to above
shall be strictly adhered by
the bidder firms and its
serving and relieving
personnels. Non
compliance shall be
strictly dealth under the
rules and regulations of the
Islamic Republic of
Pakistan.
Cei,ificate/proof
(acth•ii ATL status)
of active filing of
income tax and sales
tax with income tax
• and sales tax reports
• for 03 years from FY
2017-18 to FY 2020-
21. ki.T/S.T report
for FY 2020-21 is
manory).
dat
05 Marks
Maximum 10 Marks
K.\\
tat OA"
tikSIR ou.si
As G ne 8
a 4:Callibut
D t 8C5tIOSItallEt a7tc:"S
Mc.%t01 \551
nev al at
Conttollet Ge
Isla
3 Contract value in 1) Total contracts value in PKR during Attach copies of
similar nature of last 10 years 2011 to 2020: contracts/
Hardware purchase
Implementations/test PKR 500 Millions or above orders/work
Mg till go live in 10 Marks orders to
Pakistan during last OR authenticate
10 years with iii) ) PKR 300 Millions-499 Millions proof of contract
minimum contract 7 Marks execution/
value of US$ 0.3-0.5 of required
or higher Million or monetary
Rs.30-40 Million or OR value/worth.
higher (supported by
purchase PKR 100 Millions-299 Millions
orders/contract copy: 5 Marks
Maximum 10 Marks
Maximum 20 Marks
LI OAS
Accounts oiti..e:s
s)
sststtM ttms
enrol1o t Ac cow'
ottentoiate_06"8"
ContcolletUlsiamand
Number of Certified i) Credit of Certified Human Copies of
6
Human Resources in Resources: certification
following fields: from
internationally
i)Switching/Firewall i) 05 marks for each certification recognized
s/SSL VPN by company's/bidder's Human body/organizatio
(Max 15 marks) Resources n in the name of
certified human
Backup support 3.5 marks each certified human resource be
(Max 7 marks) resource. submitted with
authorization by
certified
Switching/Firewalls/ 04 Marks each certified human resource that
SSL VPN resource. he/she is
Installation/ permanent
Configuration Total marks of all (i to iii categories) resource of
/Administration shall be taken but not exceeding total vendor/contracto
(Max 08 marks) 30 marks. r/bidder firm
(Office
Maximum 30 Marks card/certified
payroll from
bank be
submitted to
authenticate
proof.)
Maximum Marks 100 marks
t 1010
ts oti%Cei
tipsHt
I tant Accnc, NO/ th"‘
pssiS le Geneva, ccounts
wiectOla Geneva‘ al 4.
contionel isomabad
B-Technical Bid Evaluation Criteria
Technical Bid Evaluation Criteria (Weightage/Marks as given with procurement methods):
/
value of US$ 2-3 OR of required
Million or Rs.300-400 monetary
Million (supported by PKR 700 Millions-1 billion value/worth.
purchase
orders/contract copy: 5 Marks
Maximum 10 Marks
10 Marks specific
authorization for
OR participation
Category II in
IFB-30
Tier 2 (Medium Level) Certified partner Backup local
of Original Equipment Manufacturer support from
/Principal (OEM) in Pakistan alternate local
(03 to 05 Internationally Certified
Personnel) partner of same
capacity/
category/resource
07 Marks s without
OR additional cost
and in existing
Category III
contract price.
Tier 3 (Low Level) Certified partner of
Original Equipment Manufacturer
/Principal (OEM) in Pakistan
....... rt
ffk
I I Oh"
SIR__ c
oun15 °MCC
FA9S1
tant elai kmiS L.nts
ctorate u oval ofn A"
on toil"Islamabad
Ge
(01 to 03 Internationally Certified
Personnel)
05 Marks
Maximum 10 Marks
2 Advertised Hardware i) 01-10 Marks for Compliance of Yes Technical Compliance Compliance
Specifications Hardware Specifications or higher
Compliance or higher compliance in
specifications. 10 Marks 10 Marks
Maximum 10 Marks Authentication
from OEM may be
checked, if
3 Contract value in required.
1) Total contracts value in NCR during Yes Attach copies of
similar nature of last 10 years 2011 to 2020: Contract Value Contract Value
Hardware contracts/ PKR 100 PKR 500 Million
Implementations/testin purchase Millions-299 or above
PKR 500 Million or above orders/work
g till go live in 10 Marks
Pakistan during last 10 orders to 5 Marks 10 Marks
OR authenticate proof
years with minimum ) PKR 300 Millions-499 Millions
contract value of US$ of contract
7 Marks execution/
0.3-0.5 or higher
of required
Million or Rs.30-40
Million or higher monetary
OR value/worth.
(supported by
purchase PKR 100 Millions-299 Millions
orders/contract copy: 5 Marks
Maximum 10 Marks
cm-
KHAN.
\-----1 NASIR All eet
os aa
tt t :t A counts
i
elici
ti General (MI5/ FABS)
Controller General of Accounts
4 Inventory/Spares UOEM Depot for spare parts in Pakistan Yes Attach copy of Service center
store/service 10 Marks Service center
centre/warehouse/ brochure/registrati (Karachi, (Karachi,
Depot in any major on with tax Islamabad, Lahore Islamabad, Lahore
ii) Service centers:
cities of Pakistan authorities/ and Peshawar) Peshawar and
(Lahore/ Islamabad/ ownership/ Quetta)
Islamabad (02 Marks) lease agreement
Rawalpindi/Karachi/13 Lahore (02 Marks) (04 Centers)
eshawer) details to (05 Centers)
Karachi (02 Marks)
authenticate 08 Marks
Peshawar (02 Marks) existence
Quetta of 10 Marks
(02 Marks) depot, service
centers.
Maximum 20 Marks
5 Hardware Assembly i) No. of Hardware Yes Attach copies of 09
configuration, testing supply/Assembly/configuration/testing/I More than 10
experience of contracts/ Implementations Implementations
mplementations purchase
Individual/firm/team
etc (Number of orders/work 18 Marks 20 Marks
20 Marks orders
Implementations in to
Pakistan) in last 10 authenticate proof
02 Marks for each Hardware of
years (local /foreign) each
Implementation implementation
alongwith letter
Maximum 20 Marks from clients for
successful
implementation.
6 Number of Certified i) Credit of Certified Human
Human Resources in Copies of (i+ii+iii=30) (i+ii+iii=30)
Resources:
following fields: certification from 15+7+08=30 15+7+08=30
Yes internationally 30 Marks 30 Marks
0Switching/Firewalls/ recognized
0 05 marks for each certification by
SSL VPN body/organization
company's/bidder's Human in the name of
(Max 15 marks) Resources certified human
resource be
tt
S;atista--
d (BASIS) 22/01.1-°
Team Lead (Networks)
Technical Committee
Member Technical Committee
yva
IR ALI KHAN
D re cs tsil srtaat nLvAecnceot au sm 10
.74113S )
Contralle. Genn! of Accounts
Isia.4.4nad
AL KHAN
tiPSIR ts °nice'
istant Acceitin mts/FABS)
Ass Gen etal ,, unts
Directow a te _ ova l of Ace°
CoAtiollevlszanlabati
u
12-424-A 14514
H- Bidder's Onalitcation (Am a (- rdimenary Bid Evaluation with Weightagts or
Mandatory compliance without marks/weightage El ,age or Writs out of 100):
(Marks/
Weightage
(%age) or,
Mandatory)
Signed Bid Acceptance By accepting bid form is Tick mark aty
Forms at the top of each mandatory to comply one:
bid. Integrity,secrecy of I) Submir;sion of
bidding pm:es& bid data, Responsive- Teclunc‘d Bid
(Technical + financial) secrecy of the bidding Yes submission form to
for complying all personnel identification, be placed at top of
bidding terms and system polic„es, technical bid.
conditions as well as procedures, security of Non
co,mpliance of Non data, disclosure of Responsive/
fAclosure agreement. hardware with its type, Rejected Bid-No ii) Submission of
commissionig of financial Bid
hardware, forg'ng Acceptance form to
/falsifying /counterfeiting be placed at top of
in submission of teithnical financial bid.
and fmancial bids, money Mandatory
laundering, ban on bidder,
monopoly, caterlization,
hidden JVs/agreements,
blacklisting, negative
litigation affecting the
national and international
legal status of bidder/firm
in perfonnance of bidding
or contract and 4ffecting
the image or country at
national or international
level, imposition of
sanctions/fine/punishment
by any national or
internationally
.ecognized/certif Jcl
forum, any sum of
currency, goods, works,
3ervices -ts bribe,
commissions, gifts, bonus,
donation, charity,
It.c3nIRA ctlun Sm
. Fet:B
00).
p‘sstst%t senet:11771510nt:
Otte:Coat ihinabladt
Contolle iGsk
I gratifiCations, induaent&
I of any type,whatso ever 1 Plkia
. l)
frit4mea/cal1ed shall not be e
th occurred/disclosed/ given
prior to bidding, during
bids evaluation and in post
contract award period with
a compliance to above
shall be strictly adhered by
the bidder firms and its
&Tying and relieving c
personnels. Non
compliance shall be
strictly dealth under the
rules and regulations of the
Islamic Republic of
Pakistan.
Certificate/proof
(active ATL status)
of active filing of
income tax and sales
tax with income tax
and sales tax reports
for 03 years from FY
2017-18 to FY 2020-
! 21 (I.T/S.T report
for FY 2020-21 is
mandatory).
without delay.•
However, unCGA
shall Provide
mandatory bidding
information under
NAB Ordinance
1999 for e
above Rs. cnontraeta
million
or above
"mat of
prescribed format on
• NAB.
%ASIR(Accounts
AO KOH0 Ws,
NoistantGenet al ttAIS FOBS t
Olvectovatts
Contiottet Genet al at Accounts
I.
Vslantabad
t51
. ?3z55
Annex-D
OR
Category III
(up to 05 or more Internationally
Certified Personnel)
05 Marks
Maximum 10 Marks
2 Processor Generation 10 Marks for higher Technical compliance in specifications. 10 Marks 0 Marks
(rd or higher with generation than rd generation Authentication from OEM may be
HANA compliant
checked,if required
and Certified by OR
listing it on SAP 08 Marks for second generation
Hardware directory
at its website) Maximum 10 Marks
3 Storage solution: 10 Marks for NVNIe Technology Do 10 Marks
preferably NVMe 0 Marks
Technology OR
Maximum 10 Marks 1
S r
-----— r.
. ' . . \..: 1
:
1.1ASI0 AU orticet
Assistant Accountsmisif S1
Gene's ' (
oitec towate Gener al oi men
Co ntrollet Islama bad
4 Contract value in 1) Total contracts value in
-ler Cr
similar nature of SAP
Attached photocopies of The company 0 Marks
PICA during last 10 contracts/purchase order/work order to
Implementations/testi submitted
years 2011 to 2020: authenticate proof of contract execution/
og till go live in Purchse order
Pakistan during last of required monetary value/worth, of multiple
i) ?KR 1.6 Billion or above
10 years with 10 Marks projects but
minimum contract their amount
value of US$ 2-3 is not
iii) PICA 1-1.5 Billions
Million or Rs.300- declared.
7 Marks
400 Million Only declare
(supported by the
iv) PICA 700 Millions-1 billion
purchase CGA/PLFRA
5 Marks
orders/contract copy: contracts of
36 Million
Note: Forex contracts be converted
only.
in US$ currency with Avg. 1 US$=
PKR 100 for calculation of projects
value while contracts in actual
Marks 0
ruppes value will be considered at
actual value for evaluation.
Maximum 10 Marks
5 Inventory/Spares i) Depot for snare parts Attach copy of brochure/registration with 10 Marks 0 Marks
store/service
tax authorities/ownership/lease agreement
centre/warehouse/De 10 Marks details to authenticate existence of
mt_ in major cities of Depot/service centre.
Pakistan (Lahore/ ii) Service centres (08 marks):
Islamabad/Rawalpin Islamabad/Rawalpindi (mandatory
di/ Lahore (Mandatory)
ICarachi/Peshawer)
Maximum 10 Marks
Team Lead (B SIS)/Member Technical Committee Team Lead (Networks)/Member Technical Committee
NASIR AU KHAN
Ass ylitnt Accounts Office'
te General (MIS / FABS)
Dirac o
troller General of Accounts
Islamabad
Aot.2---4 a
342—
MOST IMMEDIATE
AStsigk
OFFICE OF silicz
. CONTROLLER GENERAL OF ACCOUNTS
IRE TORA; E GENERAL MIS/EAS , IslamWad.
CGA Complex, FBC Building Sector, G-5/2, ISLAMABAD
Ph: 051-9203219 Fax: 92-051-9208896
Sublc,:t; Publishing of BER .10ainst TS No. 4709931 dated 26.01.2022 wader IFB-30
'Procurement of Centralized Servers and Network Firewall Solutions for
FARS", as Pin- PPRA Rule 35 on PPRA Webske.
End: (09)
(Maqbool Ali)
Deputy Director (Admn)
Copy Pi:-
Director (FABS), AGPR, Islamabad with a request to direct the concerned for uploading
on FABS website.
Accounts Officer (Admin), CGA, Islamabad with a request to direct the concerned for
uploatting ci CGA website.
PS to Dy. CGA (FABS/MIS), Islamabad.
AO (Budget),MIS Directorar, Islamabad.
ALI MO°
Ass un s
t 4""11""ilie;l3S1
Dime ate General1MIG
ntroller General at Acne t
Islamaba d
OIRECtORATE GENERAL MISNABS
OFFICE OF THE CONTROLLER GENERAL OF ACCOUNTS
Date & Time of Bid Closing (Technical and Financial):February it, 2022, 11:00 A.M
Date & Time of Bid Opening (Financial): March 16ffi, 2022, 12:30 P.M
Sr. No. 1, BASIS Servers and Allied Equipment (Turnkey Solution) for Centralized Data Centre:
1)17 HPE Superdome Flex 280 -SAP HANA Compliant Servers (15 Platinum + 2 Silver), Software-
VMWare-SUSE Linux, Microsoft with 05 years subscription, iii) Backup Software-Veem,iv) 02 Tape
Libraries-Store Ever v) 01 Flash Storage Solution, vi) 02 disk based backup software-HPE Store Once
3660,vii) 04 SAN Switches-HPE SN6600B, viii) 02 KVM Switches, ix) 04 Server Racks (42U), x)
Trainings for 06 Human Resources in administration of Serve s, Storage, disk base Backup
appliance/software, Veeam and VMWare Trainings (not virtual trainings) for 06 personnels in
certified institute by certified trainer . ,f the HP xi) SLA for 5 Years (24 hours*7 days)
The financial bid of
M/s Multilynx was accepted by the
Financial Bid Evaluation
Committee (FBEC) after
M/s Multi lynx 85/100 91.45/100 )Rs671,512,199/- comparative analysis/marka
quotes with Fingle bid price with
cost breakup and due diligence
prior to issuance of contract
award/Purchase order to
M/s Multilynx at a total price of
}7 Contralto; of
Islamabad
Acco
n t,
'rectorate General (MIS i1 .
General
,
. Rs671,512,199/-. The contrace
award recommended by the
committee on the basis of
compliance of technical bid
evaluation criteria evaluated by the
Technical Bid Evaluation
Committee as per required
Technical specifications, fulfilling
bidders qualification and financial
bid evaluation by the FBEC in a
compliance to PPRA Rule 38B
related to single responsive bid for
goods
(Magbool Ali)
Deputy Director (Admn)
Copy to:
I. The Asstt. Director (PPRA) for uploading on PPRA Website prior to issuance of contract
award /work order.
PS to the Dy. Controller General Accounts (FABS)
M/s Multilynx
M's Wateen Solutions Pvt Limited.
M/s Premier Systems Pvt Limited.
C- Financial Bid Evaluation Criteria
Financial Bid Evaluation Criteria (Weightage/Marks shall he assigned as given with
respective procurement method at the end of evaluation sheets):
6. Price Sheet
Basis Items Description Unit Price Total Price
Sr. (Turnkey Solution with Complete Assembly, Total (DDP) with (DDP) with
M ake /Model
No Configuration, Testing, commissioning till go live Qty all taxes & all taxes &
with 24 Ins 7days SLA) duties etc duties etc
1 SAP NANA Database Servers (Primary Site) 2 HPE Superdome Flex 280 60,616,242 121,232,484
NANA DB Servers (HPE Superdome Flex 280) 6 HPE Superdome Flex Server 1,895,400 11,372,400
Training Administration
2 SAP NANA Database Servers (DR Site) 1 HPE Superdome Flex 280 60,616,242 60,616,242
3 Application Servers for SAP Dialog, PO, BW4Hana 8 HPE DL380 Gen10 Plus Server 10,106,025 80,848,201
and other Instances (Primary Site)
4 Application Servers for SAP Dialog, PO, BW4Hana 4 HPE 01380 Gen10 Plus Server 10,106,025 40,424,101
and other Instances (DR Site)
5 Backup Servers 2 HPE DL380 Gen10 Plus Server 3,443,045 6,886,089
(one for Primary and one for DR Site)
All Flash Enterprise Storage 1 HPE Alletra 9000 NVMe Storage 60,161,775 60,161,775
(for Primary Site)
All Flash Enterprise Storage 1 HPE Alletra 9000 NVMe Storage 39,085,957 39,085,957
(for DR Site)
Storage (HPE Alletra) Training 6 Data Services Cloud Console and 1,895,400 11,372,400
HPE Alletra Management
7 SAN Switches 4 HPE SN66008 Switch 2,930,582 11,722,327
(Two for Primary and Two for DR Site)
8 Tape libraries 2 HPE StoreEver MSL3040 3,810,179 7,620,359
(One for Primary and One for DR Site)
9 Disk based backup appliance 2 HPE StoreOnce 3660 11,010,652 22,021,304
(One for Primary and One for DR Site)
Disk Base Backup Appliance (HPE StoreOnce) 6 Managing HPE StoreOnce Backup 1,895,400 11,372,400
Training Solutions
10 KVM Switches 2 HPE KVM 952,911 1,905,823
(One for Primary and One for DR Site)
11 Server Racks (421)) 4 HPE 42U Enterprise Pallet Rack 652,886 2,611,544
(Two for Primary and Two for DR Site)
12 Backup Software (Qty in details specifications) (My in Veeam 27,824,655 27,824,655
specs)
13 Software (QW in details specifications) -do- VMware, SUSE Linux, Microsoft 131,689,340 131,689,340
Backup Software (Veeam) Training 6 Veeam Availability Suite - 1,895,400 11,372,400
Configuration and Management
VMware Training 6 VMware vSphere - Install, 1,895,400 11,372,400
Configure, Manage
14 Service Level Agreement (24 hrs *7 days) Pr' - -
Five (05) Years
(with taxes & duties etc) —\
A) Total Bid Security Required of total of Sr. 1 to 14)
[Total Hardware price +So are price + 05 Years SLA Pr . 1 to 14 671,512,201
2% Bid Security of total d price (Sr. 1 to 14) yjcip rs SLA qiuqted by bidder (Accepted/Rejected)
'V°
Confidential neral Of Accou 11
116 Restricted Page 16 of 19
O Copynght 2022 M,,IOtyn Nopart of this &Korner), may bo o., nosier -11,
wrinn perpnission from Multilynx
tot\
1,
c-Financial Bid Evaluation Criteria-
Network Items (Lot- 1 to 5)
Financial Bid Evaluation Criteria-Networks Hardware (Weightage/Marks shall be
assigned as given with respective procurement method at the end of evaluation sheets):
ii-No
(tick mark
any one)
wateen
13-Price Schedule for Networks Items under Lot-I (I113-30)
Option 141
-0,1A
til3„
LI ICHAS
A ts OttIcet
Istant Ann°, INIIS/C 05)
Gen".
s ate Goleta% counts
olteet°T dt
Coatiat 'e. Islamabad
36,4 "ni`1C/Q-
D, Ki4 AN
tIAS‘R —11 ts 0111(.0
\---_---17 Ass % st asi t Mat::laci% AccouAnt?:
Mn
i etaablaodt
Ge
c:: 'lett IGsetanin
C 0 att.°t
FPR6K.PWR-AC- Firepower 4000 Series 1100W AC 4
1100 Power Supply
-aline
Mak
i
n
/°
14-1
7 3/2a7
1_ 0 N t4
@WA%
t3/4AS1R N -1 ts
ccnn MIStoot% CPASI
ss‘st ant Noval
t ot A
0%00°0%5 _ oa
atiollet ontabad
Co
fof
wateen
13-Price Schedule for Networks Items under Lot-2 (11413-30)
Unit Price (1)1)1') 'Foial Price (I)1)P)
Items Description Total Make /34otlel/ with all taws & Ivith all taws &
Lot No i (Details as in spcci licat ions) Qty Origin , duties etc
duties etc
(:isco/ N9K-
94 C93180YC. PKR 6,425,541.25 , PKK 25,702,165
2 j Core Switches
FX3/USA
' t/
GRAND TOTAL mo
PKR 25,702765 ---
19410E-
, ith tuxes & duties etc)
PKR 809,937
Final Rid Security
Bid Sectlrity
(Accepted/Rejected)
14111 2n.
-07
Fast
42, ci / o2.333., 4117A
B-Price Schedule for Networks Items under Lot-2 (IFB-3) f -2- -
Nr-71"-
7,753,526.0
\5
N9K- 4 1,656,736.3 281,645.2 6,626,945.3
C93180TC-FX3 40/100G, MACsec,SyncE
CON-SNT- SNTC-8X5XNBD Nexus 9300 48p 4,180.1
4 83,602.6
N9KC93X3 1/10/255, 6p 40/1005. MAC
:!? NXK-AF-PI
Dummy PIO for Airflow Selection
Port-side Intake
Nexus 9500, 9300, 3000 Base NX-05
NXOS-9.3.8
Software Rel 9.3.8
NXK-ACC-KIT- Nexus 31V91< Fixed Accessory Kit,
4
1I3U 1RU front and rear removal
NXA.FAN- Nexus Fan, 35CFM. port side intake
16
35CFM-PI airflow
NXA-PAC- Nexus NEBs AC 650W PSU - Port
8
650W-PI Side Intake
NXK.MEM Additional memory of 16GB ftir 4 60,787.4 10,333.9 243.149.6
1 6GB Nexus Switches
1.4137
CAB-910 OA- Power Cord, 250VAC 10A B51363
8
UK Plug (13 A fuse), UK
10GBASE-SR SIP Module, 41,791.7 7,104.6 4,012,001.1 4.694,041.3
SIP-10G-SR-S 96
Enterprise-Class
25GBASE-SR SIP Module 96 59,403.9 10,098.7 5,702,775.8 6,672,247.6
SIP-25G-SR-5
QSFP-40G- 40GBASE-SR4 QSFP Trnsur Module, 17,152.4 807,172.2 944,391.5 V
8 100,896.5
SR4-S MPO Conn, Enterprise-Class
Cl-SUBS- OPT OUT FOR "Default" DCN 4
OPTOUT Subscription Selection
1000BASE-T SIP transceiver module 5,181.2 2,925,847.0 3,423,241.0
96 30,477.6
for Category 5 copper wire
10GBASE-T SIP- transceiver 47,409.8 8,059.7 1,327,474.8 1,553,145.5
SFP-10G-T-X= 28
module for Category 6A cables
3M fiber patch cord, multimode - 506.3 2,978.3 3,484.6
Patch Cord 1 2,978.3
0M4
SM fiber patch cord, multimode - 1 3,586.1 609.6 3,586.1 4,195.7 7
Patch Cord
0M4
10M fiber patch cord, multimode - 5,348.7 909.3 5,348.7 6,258.0
Patch Cord 1
0M4
2,005.8 341.0 2,005.8 2,346.8
Patch Cord 3M copper pa
5M co patch cord -CAT 6A 2,917.5 496.0 2,917.5 3,413.5 r-c •
Patch Cord
5,348.7 909.3 5,348.7 6,280 ./
Patch Cord copper patch cord -CAT 6
22,001,961.3 25,702,165.4 A ( 0
Grand Total 2,103• 290 9 347,527.1
_
V)/
ott .
1-V3 /2 02_2_
Signature of Bid& r
79,
wateen
B-Price Schedule for Networks Items under Lot-4 (1113-30)
lath Prier
rota! Price (1)111')
leras Description Make /Model/ (I)1)P) with all
'haat 01) a all all taxes &
ii srAxineill/011S) Origin taxes & duties
duties eft
etc
1000 users Cisco/FPR213ONG
VPN SOIL/11011 FW-10.1SE.SEC- PKR 5,179,247.5 PKR 10,358,495
. /census SUB/USA
(;It \NI) TOTAL till)
lilt I PKR10,358,495
i Iii IONOS & dirties ere)
Ill See11111)
(.‘ecrBlediltejeCle/1)
PSIJISEI/CGA/WA/L4(1799
Monday, February 14, 2022 4
Premier
8- Price Schedule for Networks Items under LOT-3 (IFB-30)
5RX4200 Services Gateway includes hardware (8x100E, two AC PSU, four FAN
9%4200-V5-J84C Trays, cables and RMK) and I unos Software ease (Firewall, NAT, IPSec, Routln& 4 4,359,367 17,437,467
MPLS)
SRX.SFP-10GE-SR Small Form Factor Fluggable 10 Gigabit Ethernet (SFR+) SR Optics 8 48,048 384,194
SFP+, LOGE Direct Attach Copper Cable, 1 meter, Standard Temperature (0 4,805 19219
I g SCP-10GE-DAC-14 4
through 70 DEGREE C), 0.57W, 30 AWG Juniper
gP+, LOGE Direct Attach Copper Cable for Security Platforms, 3 meters, Standard PRX4200/USA]
sox-SEMI/GE-3M -3M 8 6,783 54,266
Temperature (0 through 70 DEGREE C), 30 AWG
Small Form Factor Pluggable 1000Elase-T Gigabit Ethernet Module (Uses Cat 5 12,719 305,246
SR&SFP-1GE-T 24
cable)
PSS RTF Support for SF44200415-1B-DC/SRX4200-SYS-18-AC 4 972,533 3,890.131
PAR411T4RX4203113
(One Year Warranty/Support)
W90,712:92-
Total for Above On PKR1
25,806,134.12
rand Total with 1ST (in PKR)
ir
q\\fi
x ,gtS
\
\W
Page 1 of 1
As soon as a contract has been awarded the procuring agency shall make
all documents related to the evaluation of the bid and award of contract public: