ALL-PILE Version 6 CivilTech Software www.civiltech.

com Licensed to

PILE DEFLECTION & FORCE vs DEPTH


Pile below Ground (NTS) Single Pile, Khead=5, Kbc=2
Water above Pile
Depth (Zp) DEFLECTION, yt -cm MOMENT -kN-m SHEAR -kN  -kN/m3  C-kN/m2 k-MN/m3e50 % Depth (Zp)
from from
Pile Top-m -0.05 0 +0.05 -10 0 +10 -10 0 +10 9.2 27.9 20 32.6 1.24 Pile Top-m
0 Silt (Phi + C) 0

2 2
yt=0 at 3.2-m
9.8 13.5 23.4 49.8 1.07
4 St=0 at 4.1-m Silt (Phi + C) 4

8.9 17.93 15.0 25.9 1.33


6 Silt (Phi + C) 6

8.9 17.93 15.0 25.9 1.33


8 Silt (Phi + C) 8

9.9 17.93 22.4 54.5 1.04


10 Silt (Phi + C) 10

10.9 20 48 164.2 0.66


12 Silt (Phi + C) 12

10.9 20 42 136.9 0.71


14 Silt (Phi + C) 14

11.1 20 52.5 229.7 0.56


16 Silt (Phi + C) 16

11.2 33.8 60 272.5 0.52


18 Silt (Phi + C) 18

Tip yt=-1.91E-17 Top yt=4.81E-2 Top Moment=-9.6 Top Shear=10.0


20 Max. yt=4.81E-2 Max. Moment=9.6 Max. Shear=10.0 E -MP=20683 20
Top St=-1.41E-19 I'-cm4=125664

22 22

24 24

26 26

28 28

30 30

CivilTech GIS Bekasi 500kV


Software Borepile d40 cm GIL L PILE 19M Figure 2