Item Activity Location

1 Schedule Site office 1


TBZ ORGANIZATIONAL CHART MANPOWER LOAD
SITE OFFICE TEAM REGULAR PROJECTS FAST TRACK TEAM MAINTENANCE TEAM REPAIR TEAM STAFF Type of Work QTTY
Site Manager -1 Main TBZ Beira Compound Site 20 - Maintenance works Repair Team - All Sites Mohammad El Tome (ME) MEPF / Maitenance All site
Sr Civil Engineer- 1 Site Engineer - Ali Sharif (CE) Site Engineer - (New) Site Engineer - Mohammad El Tome (ME) Site Engineer - Mohammad El Tome (ME) Moner Alagory (EE) EP/Maintenance All site
Site Architect- 1 Main Kitchen Additional (renovation) Renovation of Two Storey 14 Rooms with CR Site Engineer - Moner Alagory (EE) Site Engineer - Moner Alagory (EE) Mohammad Jalole (EE) EP/Maintenance All site
Draftsman- 1 Road Renovation of Hangar for Recreation Site Engineer - Mohammad Jalole (EE) Site Engineer - Mohammad Jalole (EE) Ali Embeg (GE) Regular / Finishing 2
Document Control -1 Backfill Undergroud Tanks (2 nos.) Renovation of 2nd Floor Building for Recreation Site Engineer - Ali Embeg (GE) Fast Tract
Safety Officer - 1 Landscape Site 22 - Maintenance works Site Engineer - Ali Sharif(CE) Ali Sharif(CE)
Site 20 - Additional Works Site Engineer - Mohammad El Tome (ME) Site Engineer - Ali Suwid (CE) Ali Suwid (CE)
Tank Batallion Site Engineer - Mohammad El Tome (ME) Site Engineer - Moner Alagory (EE) Site Engineer - Nouredin El Farsi (CE) Nouredin El Farsi (CE)
Site Engineer - Ali Suwid / Nouredin El Farsi (CE) Site Engineer - Moner Alagory (EE) Site Engineer - Mohammad Jalole (EE) Site Engineer - Zakaria (CE) Zakaria (CE)
Tank Hanger Ramp Site Engineer - Mohammad Jalole (EE) Site Engineer - Osama (CE) Osama (CE)
Tank Hangar Water Oil Separator Site Engineer - Ali Embeg (GE) Site 26 - Maintenance works Site Engineer - Obied (CE) Obied (CE)
New hangar Site Engineer - Mohammad El Tome (ME) Site Engineer - Ayob (AR) Ayob (AR)
Site Engineer - Ali Embeg (GE) Site 22 - Additional Works Site Engineer - Moner Alagory (EE) Site Engineer - (New) Site Engineer - (New)
Main Administration Building Site Engineer - Mohammad El Tome (ME) Site Engineer - Mohammad Jalole (EE)
Landscape - Main Admin Building Site Engineer - Moner Alagory (EE)
Site Engineer - Mohammad Jalole (EE) Site 47 - Maintenance works
Special Force Battalion ` Site Engineer - Mohammad El Tome (ME)
Site Engineer - Ali Sharif (CE) Site 26 - Additional Works Site Engineer - Moner Alagory (EE)
Athletic Field Site Engineer - Mohammad El Tome (ME) Site Engineer - Mohammad Jalole (EE)
Olympic Swimming Pool Site Engineer - Moner Alagory (EE)
Stadium Site Engineer - Mohammad Jalole (EE) Atlantis Hotel and Restaurant - Maintenance works
Site Engineer - Ayob (AR) Site Engineer - Mohammad El Tome (ME)
Bunker Administration Building Site 47 - Additional Works Site Engineer - Moner Alagory (EE)
Bunker Main Door Site Engineer - Mohammad El Tome (ME) Site Engineer - Mohammad Jalole (EE)
Bunker Landscape Site Engineer - Moner Alagory (EE)
Site Engineer - Mohammad Jalole (EE)
Farm
Site Engineer - Zakaria/Osama (CE) Maintenance - Fastract
Hangar 02 Site Engineer - Mohammad El Tome (ME)
Hangar 03 Site Engineer - Moner Alagory (EE)
Hangar 04 Site Engineer - Mohammad Jalole (EE)
Control Building
Underground Room Firing Range - Fastract
Road Site Engineer - Mohammad El Tome (ME)

Villa 01 Handover Team


Site Engineer - Obied (CE) Site Engineer - Mohammad El Tome (ME)
Building 01 Site Engineer - Moner Alagory (EE)
Building 02 Site Engineer - Mohammad Jalole (EE)
Building 03 Site Engineer - Ali Embeg (GE)
Building 04 Site Engineer - Ali Sharif(CE)
Building 05 Site Engineer - Ali Suwid (CE)
Building 06 Site Engineer - Nouredin El Farsi (CE)
Site Engineer - Zakaria (CE)
Villa 02 Site Engineer - Osama (CE)
Site Engineer - Obied (CE) Site Engineer - OBIED (CE)
Building 01 Site Engineer - Ayob (AR)
Building 02 Site Engineer - (New)
Building 03
Building 04
1.5
82.25 81.46 0.79 0.71 -0.71
81.45 0.8 0.7 -0.7
81.06 1.19 0.31 -0.31
81.26 0.99 0.51 -0.51
80.95 1.3 0.2 -0.2
80.97 1.28 0.22 -0.22
80.74 1.51 -0.01 0.01
80.95 1.3 0.2 -0.2
80.90 1.35 0.15 -0.15
80.77 1.48 0.02 -0.02
80.99 1.26 0.24 -0.24
80.96 1.29 0.21 -0.21
81.11 1.14 0.36 -0.36
80.96 1.29 0.21 -0.21
81.05 1.2 0.3 -0.3
80.93 1.32 0.18 -0.18
81.23 1.02 0.48 -0.48
80.66 1.59 -0.09 0.09
80.86 1.39 0.11 -0.11
81.00 1.25 0.25 -0.25
81.11 1.14 0.36 -0.36
80.91 1.34 0.16 -0.16
81.14 1.11 0.39 -0.39
81.01 1.24 0.26 -0.26
81.13 1.12 0.38 -0.38
81.00 1.25 0.25 -0.25
81.44 0.81 0.69 -0.69
81.08 1.17 0.33 -0.33
81.13 1.12 0.38 -0.38
81.47 0.78 0.72 -0.72
81.21 1.04 0.46 -0.46
81.28 0.97 0.53 -0.53
81.25 1 0.5 -0.5
81.36 0.89 0.61 -0.61
TBZ ORGANIZATIONAL CHART

AREA MANAGER
MOHAMMAD MEZOUGHI
COORDINATION OF ALL WORKS FROM CLIENT TO SITE MANAGERS and SITE ENGINEERS
CHECK ALL WORKS OF SITE MANAGERS and SITE ENGINEERS
ASSIGN ALL WORKS TO SITE MANAGERS and SITE ENGINEERS

REGULAR PROJECTS FAST TRAC


SITE MANAGER ASSIGN AND MONITOR ALL WORKS TO SITE ENGINEERS MOHAMMAD MEZOUGHI
RODERICK WAKAT CHECK ALL DOCUMENTS BEFORE SEND TO SITE ENGINEERS
CHECK ALL REQUEST FROM SITE BEFORE SEND TO PMO AUDIT
SITE ENGEERS
MOHHAMAD EL TOME
SR SITE ENGR / COORDINATOR MONER
ROBERT MOHHAMAD JALOLE
AYUB

SITE ENGINEERS
ALI ENBIG
ALI SUWID
ALI AL SHARIF
AYUB
OBIED
ZAKARIA
NEW CIVIL ENGR1
NEW CIVIL ENGR2
MEPF
MOHHAMAD EL TOME Mechanical, plumbing and pump
MONER Elcectrical and pump
MOHHAMAD JALOLE Elcectrical and pump
FAST TRACT PROJECTS
Assign and monitor all work to site engineers
Planning, supervision and review work with site engineers

Mechanical, plumbing and pump


Elcectrical, pump and lighting works
Elcectrical, pump and lighting works
ARCHIECTURAL, ELECTRICAL AND PLUMBING WORKS
Architectural, plumbing and lighting works