You are on page 1of 1

TOTAL QAULITY MANAGENMENT

MANAGER

QUALITY CONTROL

FID + CUTTING SEWING WASHING


ASSISTANT MANAGER(OPT) ASSISTANT MANAGER INCHARGE(OPT)

INCHARGE INCHARGE QC FOR SHADE APPROV.

QC FABRIC INSP QC SMALL PART SEC. QC FOR MMT 1ST BATCH

SHRINKAGE + SHADING QC BACK SEC. FINISHNING


PATTERN QC FOR BULK QC FRONT SEC. ASSISTANT MANAGER

QC ASSEMBLY I INCHARGE

QC FINAL/ASSEMBLY II QC FOR TRIMS (APPROVEL & CHECKING)

QC FOR TRIMING AND STAIN

QC FOR B2

BATCH AUDIT/ FA

QC FOR FOCUS POINT

QC FOR PACKING

QUALITY ASSURANCE

QAULITY MACHANISM IN PROCESS INTERNAL QAULITY MACHANISM

QA FOR SEW/FIN FOR INLINESS QA FOR PRE-FINAL / FINAL AUDIT

STRENGTH OF TOTAL QUALITY MANGEMENT FOR 50K/70K PER MONTH.

• EVERY SECTION HAVE ONE QC.

• ASSEMBLY1 AND ASSEMBLY II (2+2) QC.

• FINISHING FOCUS POINT HAVE 2 QC.

• FID + CUTTING 1 AM (OPTIONAL)+ 1 INCHARGE.

• SEWING 1 AM + I INCHARGE.

• WASHING ONLY 1 INCHARGE (OPTIONAL).

• FINISHING 1 AM + 1 INCHARGE

FID + CUTTING TOTAL QC = 4

SEWING SECTION TOTAL QC = 7

WASHING TOTAL QC = 2

FINISHING TOTAL QC = 7

TOTAL QA’S = 2 TOTAL STRENGTH=33+01MANAGER

STAFF WILL BE ADDED WHEN PRODUCTION WILL INCREASE.

You might also like