Clean gas Stack - Upgradation of ESP to Baghouse

Fitting , Welding , Painting: 579.3 1204.7 1868.7 1606.2


Total Weld Painting
S.NO Type Thickness Diameter-1 Diameter-2 Joint Length Joint Weld (Kg/Mtr) Total Fit-up Mtr Weld Deposit
Volume (Kg) Surface area
1 Taper 25 6300 4000 L.S 25000 Double -V 2.4 50 120.0 156.0

2 Straight 25 4000 4000 L.S 10000 Double -V 2.4 20 48.0 62.4

3 Straight 20 4000 4000 L.S 32000 Double -V 1.7 64 108.8 141.4


1855.7
4 Taper 25 6300 4000 C.S 194052 Double -V 2.4 194.1 465.7 605.4

5 Straight 25 4000 4000 C.S 50240 Double -V 2.4 50.2 120.6 156.7

6 Straight 20 4000 4000 C.S 200960 Double -V 1.7 201.0 341.6 444.1

Job Scope: Job distribution: 40days


Type Thickness Mean Dia Circumfernece No.of joints Total Length S.NO Item Description Contractor Length Fitter Days

Taper 25 5150 16171 12 194052 1 TP-1 to TP-11 K.C.NATH 22mtr 4 15

Staright 25 4000 12560 4 50240 2 TP-12 to SD-5(25THK) N.E.E 12mtr 4 10

SD-1(20THK) to SD-
Straight 20 4000 12560 16 200960 3 N.E.E 10mtr 1 5
5(20THK)
SD-6(20THK) to SD-
1.Considering plate length-12mtr , width-2mtr 4 Shivam 23mtr 4 10
17(20THK)
1.Spiral Staircase is not clear in the drawing i.e. what needs to be fabricated to finalise the
2.No.of taper shells to be joined-12 , thickness-25mm , length-25000
scope
3.No.of straight ducts to be joined - 5 , thickness - 25mm , length-10000 2.Total Job for fabrication is 40days and 5 days for painting - 45days of fabrication time

4.No.of straight ducts to be joined - 17 , thickness - 20mm , length-32000