PROJECT TITLE:

UPGRADATION OF FOUR LANING SECTION


OF NH 31 FROM KM 551.360 TO KM 563.260
(GHOSHPUKUR TO BIHAR MORE) IN
DARJEELING DISTRICT, WEST BENGAL ON
EPC MODE.

VIRAT CONSTRUCTION COMPANY.


A/815, SIDDHI VINAYAK TOWERS, NEAR KATARIYA ARCADE, MAKARBA,
AHMEDABAD – 380 051.

EMAIL: darshanmupadhyay@gmail.com
REINFORCEMENT STEEL DESIGN
FOR PANEL – RSW WALL

(1600mm X 1600mm X 180mm SIZE)


CALCULATION FOR PANEL STEEL REQUIRED FOR EARTH PRESSURE:
Please find below the earth pressure calculation for various height of wall. We have considered two cases to cover all the options of reinforcement positioning.

Considering the connector position for various heights, span has been considered as per design.

Height upto Horizontal Average UDL per


Unitweight Weight of Span considered
Design Total Pressure Pressure Factored
Sr. Height
bottom & top
of Back fill fill
Dead Load Live Load
Load
Ka(∅ −3
for Bottom for Bottom
meter width for Simply Moment
Moment
of the panel supported (in at end M
No. (in meter)
of bottom
(kN/cum) (kN/sq. m)
(kN/sq.m) (kN/sq.m) (kN/sq.m)
2)
Panel Panel at end
panel (kN/sq.m) (kN/sq.m) (kN/m) meter)

12.00 20.00 240.000 15.400 24.000 279.400 0.307 85.776


1 12.00 80.864 80.864 0.600 14.555 21.833
10.40 20.00 208.000 15.400 24.000 247.400 0.307 75.952
8.00 20.00 160.000 15.400 24.000 199.400 0.307 61.216
2 8.00 56.304 56.304 0.600 10.135 15.202
6.40 20.00 128.000 15.400 24.000 167.400 0.307 51.392

Considering the connector position for various heights, span has been considered as per design.
Design Factored width of Reinforcement
Sr. Depth of Effective
No.
Height (in Moment at
Panel Depth
the panel provided
meter) end considered (sq.mm/m)
457 (8 dia. 110
1 12.000 21.833 180 120 67.233 500 35 1000 441.46 c/c)

335 (8 dia. 150


2 8.000 15.202 180 120 56.102 500 35 1000 302.09 c/c)

From above table, it has been clearly derived that for the height above 8 meter, panel reinforcement required is 8 mm dia @110 mm c/cin main direction and 8
mm dia @ 150 c/c in other direction and for height upto 8m, panel reinforcement required is 8 mm dia @ 150 mm in both direction.
600 mm
800 mm
mm
200 BM Diagram

Note:For panels with three connector, there is an additional reinforcement, in between this
two connectors and the required strength of geogrid is lesser than the maximum (250 Kn/m)
considered here for calculations. Hence the case of 600mm cantilever span and cantilever
moment is the worst case in all the types of panels.

Sample calculation:
Maximum Bending Moment is 21.833 KN-m/m

Calculation for Width of panel = 1000mm

Effective depth of panel = 120mm

Depth of panel required,

BM = 0.138 x σck x b x d2

21.833 1 10
. =
1000 0.138 35

= 67.233mm < 120mm (For Moment at End)

Hence Ok.
Panel Steel required,

Bending Moment (Annex-G-1.1, IS 456)

21.833x 106== 0.87 500 (120 − )

At = 441.46 mm2 (Requirement for Maximum factored bending moment)

Provided 8 T @ 110 mm c/c = 457 mm2/m, which is greater than required

Hence OK.

Considering higher factor of safety for the stresses, finally, reinforcements for panels are provided as 8mm
diameter @ 120mm c/c in main direction and 8mm diameter @ 150mm c/c in other direction. Please find
below the reinforcement layout for panel:

NOTES:PANEL DESIGN & REINFORCEMENT DETAILS FOR HEIGHT ABOVE8.00 M.


NOTES:PANEL DESIGN & REINFORCEMENT DETAILS FOR HEIGHT UPTO8 M.
Calculation for connection: (16mm (MS Bar) connector rod)

A) Tensile stress in each leg of Loop:

Ultimate Tensile strength of Geogrid = 300kN/m with strip width of 300mm

(LTDS of 300mm width of strip, i.e. {(300/3.333*1.57*1.15*1.15)} = 43.350 kN)

Maximum tension in each grid 300mm wide = 43.350/ 1.5 = 28.90kN (For 250 kN/m Tensile strength Geogrid
of 300mm width); where in 1.5 is to consider actual load on connector.

For double strip total tension = 2 * 28.90 = 57.80

Considering total No of legs are 2.

Tension in each leg = 57.80 /2 = 28.90kN.

Sacrificial cross-sectional area of 16 mm dia rod = 16 – (2 x 0.75) = 14.5 mm

Net cross-sectional area = 14.5 = 165.13 mm2

Allowable tensile strength = 0.6 x = 0.6 x 500 = 300 N/ mm2

Allowable tension on each Leg = (165.13 x 300) / 1000

= 49.54 kN> 24.08 kN

Hence, OK.

B) Shear Force in Loop leg:

Shear force = Tension in each leg = 28.90kN

Net Cross-sectional area = 165.13 mm2

Allowable shear force in each leg = 165.13 x 0.45 x 500 / (1000)

= 37.15 kN> 24.08 kN

Hence, OK.
C) Development Length for connector:


=

As per IS: 456, Clause 26.2, Development Length is given as

Where,

 = Nominal diameter of the bar = 16mm

s= Stress in bar at the section considered in the design load

bd= Design bond stress = 1.7(M35) (as per Table 26.2.1.1 of IS: 456)


Therefore, bd= 1.7 N/mm2

Tension in Leg = 57.80 /2 = 28.90kN = 28900 N

Therefore = = 143.736N/mm2
.

Development Length required,

.
= = 388.202 mm
.

Provided full length of zig zag connection, hence the total resistance length is much more than above.

Note:If we considered for single leg, then the length of each leg is to be increased by 100mm. In that case total
length of connector rod is increased to 200mm, for maximum strength of grid, otherwise above dimension is
OK.
CHECK FOR PANEL REINFORCEMENT AT THE TIME OF LIFTING

Considering the lifting hook position, span has been considered as below:

Panel dimension: (lifting hook position)

0.18m thick panels

0.4m 0.8m 0.4m


Calculation:

Unit Weight of panel: 25 kN/cum

UDL for the width of the panel = 25 x 0.18 = 4.5 kN/m

For Limit state approach UDL = 4.5 *1.5 =6.75 kN-m/m

Span considered for Cantilever moment = 0.4 meter

Maximum Cantilever Bending Moment = WL2 / 2 = 0.54 kN-m/m

Effective depth of panel = (180-60) mm = 120mm

Strength of concrete required to lift the panel,

BM = 0.138 x σck x b x d2

0.54 x 106 = 0.138 x σckx 1000 x 1202

σck = 0.27 N/mm2 ; Considered minimum of 1 N/mm2

Hence Ok.

Panel Steel required,


y  At
Bending Moment  0.87  y  At (d  ) (Annex-G-1.1, IS 456)
ck  b

500  At
0.54 x 106  0.87  500  At (120  )
11000
At < 10 mm2

Provided 8 T @ 150 mm c/c – both ways = 350mm2/m, which is greater than required.

Hence OK.

=======