a. Road Grader
b, Payloader
c. Dumptruck (min. of 2 units)
a. Jackhammer
b, Payloader
c. Dumptruck
a. Bulldozer D7
b. Payloader
c. Dumptruck (min. of 2 units)
For Embankment 300-400 m3/day (emb. from road cut) add dozer
For Bituminous Conc. Surface course 2,249 m2/d (0.05 thk.) verify maintenance
1,500 m2/day (0.075 thk.) verify maintenance
a. Asphalt Paver
b. Steel Roller
c. Pneumatic Roller
16. Average output of Crane Clamshell 150 m3/day (with back-up equip’t. Below)
1 Foreman
1 Laboratory Technician
4 Laborers
1 Foreman
1 Laboratory Technician
2 Laborers
1 Foreman
1 Laboratory Technician
4 Laborers
(NOTE: NO. OF DAYS IN HAULING AGG. NOT INCLUDED)
1 Foreman
1 Laboratory Technician
8 Laborers
1 Foreman
2 Mason/Carpenter
15 Laborers
(NOTE: INCLUDES INSTALLATION OF FORMS)
1 Foreman
1 Laboratory Technician
6 Skilled Workers
10 Laborers
(NOTE: INCLUDES WORKFORCE BOTH AT BATCHING PLANT & SITE,
INSTALLATION OF FORMS)
1 Foreman
2 Mason/Carpenter
15 Laborers
(NOTE: INCLUDES INSTALLATION OF FORMS)
1 Foreman
1 Laboratory Technician
6 Skilled Workers
10 Laborers
(NOTE: INCLUDES WORKFORCE BOTH AT BATCHING PLANT & SITE,
INSTALLATION OF FORMS)
ASSOCIATION OF CARRIERS & EQUIPMENT LESSORS INCORPORATED
Note: The above outputs are up to maximum disposal site distance of 10 meters.
Daily Output
Reinf. Conc. Conc. Pvmnt. Asp. Pvmnt.
A. Labor/MD 0.50 cu. m. 2.520 sq. m. 8.00 sq. m.
B. Equipment
B.1 Air Comp. w/
Jackleg 2.00 cu. m. 50.00 sq. m.
Open - 2,400 sq. m.
B.2 Road Grader
Limited - 1,200 sq. m.
C. Removal of Slides
Using Payloader:
A. Labor
Daily Output in cubic meter
Common Excavation Unclassified Exc. Stone removal
3.00 1.50 0.50
D4 --------------- 210
D6 ---------------250
D8 --------------- 410
C. Solid Rock
C.1 Particulars:
- 1 - License Blaster
- 2 - Skilled Laborers
- 2 - Laborers
Note: 1. Consider reduction of manpower and equipment output for heights of more
than 1.50 meters.
2. All equipments except Dump Trucks, Road Roller and Air Compressor to
be assisted by a helper or laborer.
3. Provide provision for scaffolds and incidental expenses for heights of
more than 1.50 meters.
2. Above labor outputs are based on a maximum depth of 2.00 meters. For
depths exceeding 2.00 meters, add provisions for hoisting for
double/multiple handling.
ITEM 104 : EMBANKMENT
B. Placing
B.1. Labor:
Daily output in cu. m./man-day for common earth and
unclassified material = 4.0 cu. m./man-day
B.2. Equipment:
Output of 1 unit Road Grader - 600 cu. m./day (400 cu. m./day)
C. Compaction:
C.1. Labor (Tamping): 2 cu. m./man-day (applicable to backfills for cross drain or
Retaining walls).
C.2. Equipment:
Portable plate compactor : 50 cu. m./day
1 Tonner Road Roller : 100 cu. m./day
9 -11 Tonner Road Roller : 300 cu. m./day (400 cu. m./day)
Note:
1. Duration for the Water Truck is equal of the duration of the Road Roller.
2. Ratio of one (1) Road Grader to two (2) Road Rollers.
3. Number of Dump Trucks per day depends on capacity of Road Grader
per day.
ITEM 105 : SUBGRADE PREPARATION
A.2 Compaction
# Required duration for road Roller is the same that of the Road Grader and
the duration of Water Truck is half the duration for the Roller.
A. Quarrying:
General Formula:
Q = q x ( 60/CM ) x ElOMoA
Where:
RcPS|
1. In a cross loading
Cm = D/F+D/R+Z
Cm = D/F+2+D/R+2+Z
Cm = D/F x 2
FIXED TIME:
V - Shaped Cross Load and
Loading Loading Carry
Direct Drive 0.23 0.35
Hydraulic Drive 0.20 0.30
Torque Flow Drive 0.20 0.30 0.35
Travel Speed: F1 = (0 - 7.3 km/hr)
R1 = (0 - 7.8 km/hr)
Computation for screening and stockpiling for wheel loaders
(articulated) Use job efficiency ( E ) of 0.83 (83%)
Cm = 1.00 min. (cycle time for screening 1 bucket of unprocessed material)
However, for screening fine and course aggregates, introduce (f) quarry factors to
the general formula, therefore.
Moreover, in the screening process of fine and coarse aggregates, there is extra
time required for stockpiling and screened waste. Materials which needs to be
determined as a factor of cycle time to be multiplied to the above formula to
arrive at the output capacity, Q.
C. Loading and Unloading
2. Boulders - 6 minutes
Speed in KPH
Below 7% Grade 7 -12% Above 12%
Dirt Road Paved Dirt Road Paved Paved
Loaded Trip 15 25 10 15 5
W/o Load 20 30 15 20 10
E. Stockpiling of Boulders:
D Labor/Supervision
1- Civil Engineer 1- Lab. Tech.
1- Foreman 1 - Helper/Laborer for every equipment except for
2- Flagmen (Optional) Dumptrucks and Rollers
ITEM 311 : PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
A. Materials:
A.2. Aggregates:
Loose Volume
Qty. per cu. m. of concrete
Fine Aggregates: 0.50 cu. m. (0.45 - 0.50 cu. m.)
Coarse Aggregates: 0.80 cu. m. (0.80 - 0.90 cu. m.)
Include other miscellaneous accessories e.g. dowel bars, joint fillers, etc.
4- Laborers
1- Materials Lab. Tech.
4. Equipment Requirement:
2 - Transit Mixer
1 - Payloader
2 - Portable Concrete Vibrator
1 - Water Tank
1 - Concrete Batching Plant (include labor for assembly of batching plant
and lease of batching area)
1 - Bar Cutter
1 - Portable Concrete Cutter
lOMoARc PSD|5254382
C. Cutting Provisions:
D. OTHERS:
Conditions:
1. Hammer - TDH - 22
2. Piles are spotted
A. Materials:
B.1. The duration for 1 - bagger or 2 - bagger mixer depends on equipment utilization
schedule as reflected in the PERT/CPM.
B.2. Crew for 1 - bagger mixer and transit mixer is the same as Item 311 except for
steelman which is included in Item 404 and carpenters which is revised per
section D of this item.
B.3. Supporting equipment for batching plant same as Item 311.
B.4. Duration of transit mixer is dependent on the speed setting forms and type and size
of structures. (See B.1.)
C. Curing:
C.1. Either ponding or use of curing compound or combination or both as specified in the
Std. DPWH Specs.
D. Formworks:
D.1. Formworks:
Capacity:
Materials:
300 mm 24 pcs.
450 mm 12 pcs.
610 mm 8 pcs.
Crew Composition:
A. Scope of Works:
Labor capacity - See Item 103: Structure Excavation For capacity of laborers.
Crew Composition:
1 - Civil Engineer
1 - Foeman
10 - Laborers
C. Materials:
D. Water provisions:
A. Scope of Work:
C. Materials:
Note: For Stone Masonry, the cement factor of 5 bags per cu. m. of stone masonry was
based on minimum mortar bedding and joint thickness of 35 mm.
lOMoARc PSD|5254382
9258 + 4663
UNIT COST = -----------------------------
500
% of TEPC
PROJECT
Flat Terrain Rolling Terrain Mountainous
COST
New Rehab New Rehab New Rehab
0~1M 1.000 0.500 1.500 0.750 2.500 1.250
1M~2 M 0.750 0.375 1.250 0.625 2.250 1.125
2M~5 M 0.500 0.250 1.000 0.500 2.000 1.000
5M~ 0.375 0.188 0.750 0.375 1.750 0.875
TEPC: Total Estimated Project Cost
(2) Tool