You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11

GYPSUM VERTICAL BULKHEAD


FINISHED IN AP-2 TILL SLAB BOTTOM

PAINT FINISHES

400
COVE LIGHT
A-P1 AGATE GREY (RAL 7038)- DULUXE LUSTRE
GYPSUM CEILING FINISHED IN

150
150

AP-2 @3350MM FROM FFL GYPSUM VERTICAL


BULKHEAD A-P2 SIGNAL WHITE DULUX- RAL 9003- LUSTRE
FINISHED IN AP-2

1600
GYPSUM CEILING FINISHED IN
AP-1 @3600MM FROM FFL A-P3 BLUEWEED -9232 LUSTRE
150 150
A

AP-1 GYPSUM FALSE CEILING


150

150
COVE LIGHT
GYPSUM BULKHEAD
GYPSUM CEILING COVE LIGHT
GYPSUM VERTICAL GYPSUM VERTICAL

1340
FINISHED IN AP-2 L2 L2 L2 L2 L2 L2
BULKHEAD BULKHEAD
@3350MM FROM FFL
FINISHED IN AP-2 FINISHED IN AP-2
32W LED LIGHT FIXTURE
150

150
L2

COVE LIGHT
400 11275 400 FAN
150 GYPSUM CEILING FINISHED IN 150
AP-1 @3600MM FROM FFL
B

1600
GYPSUM VERTICAL
GYPSUM VERTICAL
GYPSUM CEILING FINISHED IN BULKHEAD
BULKHEAD
AP-2 @3350MM FROM FFL FINISHED IN AP-2
FINISHED IN AP-2
COVE LIGHT

400
150

150
FALSE CEILING LAYOUT
01 1:40
C

75

COVE LIGHT
2620 3020 3020 2620
75 75

EQ
COVE LIGHT

COVE LIGHT
EQ
75

COVE LIGHT
1725 1725 1725 1725 1725 1725 1725

eq
D

L2 L2 L2 L2 L2 L2

eq
75

COVE LIGHT

75 75
EQ
COVE LIGHT

COVE LIGHT
EQ
75
E

COVE LIGHT

LIGHTING LAYOUT
01 1:40

STAGE PURPOSE

DESIGN SYNC COLLABORATIVE


DESIGN SYNC CONSULTING & ADVISORY PVT LTD
BRIGADE METROPOLIS WHITEFIELD ROAD
WAITING HALL SBC STATION
TITLE
F EASIBILITY
D ESIGN
C ONSTRUCTION
T ENDER REVIEW

C O-ORDINATION
E XECUTION
09
080:25350922 KARNATAKA LADIES WAITING HALL
studio@designsync.in
www.designsync.in
F E C N E D I S E R

FALSE CEILING LAYOUT


DRAWING NUMBER SCALE ISSUED VERSION

A-204 1:60 23 FEB 2023 R0

You might also like