You are on page 1of 1

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

KEY PLAN

150 150 SLAB BOTTOM

N
150 FALSE CEILING

150
300

150
LVL -150MM
150 150
150 600 FALSE CEILING
LVL -300MM
COPYRIGHT
THIS DRAWING SUBJECT TO THE CONDITIONS IN CONTRACT. ALL
INVENTIONS, IDEAS, DESIGNS AND METHODS HEREIN ARE RESERVED TO
PALMET SLAB BOTTOM asppire ARCHITECTS AND PLANNERS AND MAY NOT BE USED WITHOUT
ITS WRITTEN CONSENT.

COVE LIGHT ALL RECIPIENTS OF CONTRACT DOCUMENTS, INCLUDING BIDDERS AND

150
D1 THOSE WHO DO NOT BID AND THEIR PROSPECTIVE SUBCONTRACTORS
AND SUPPLIERS WHO MAY RECEIVE ALL OR A PART OF THE CONTRACT
302 FALSE CEILING DOCUMENTS OR COPIES THEREOF, SHALL MAKE EVERY EFFORT TO
12.5 MM GYPSUM ENSURE THE SECURE AND APPROPRIATE DISPOSAL OF THE CONTRACT
DOCUMENTS TO PREVENT FURTHER DISCLOSURE OF THE INFORMATION
FALSE CEILING LVL -150MM CONTAINED IN THE DOCUMENTS. SECURE AND APPROPRIATE DISPOSAL
INCLUDES METHODS OF DOCUMENT DESTRUCTION SUCH AS SHREDDING

150
OR ARRANGEMENTS WITH REFUSE HANDLERS THAT ENSURE THAT THIRD
3475

PERSONS WILL NOT HAVE ACCESS TO THE DOCUMENTS' CONTENTS


3325

EITHER BEFORE, DURING, OR AFTER DISPOSAL. DOCUMENTS MAY ALSO BE


RETURNED FOR DISPOSAL PURPOSES TO asppire ARCHITECTS AND
FALSE CEILING
3175

PLANNERS, # B-12, BANSHREE CO-OP SOCIETY, 1099, MODEL COLONY,


PUNE - 411016, INDIA
150 600 LVL -300MM
NOTES

PALMET

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


COVE LIGHT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

12.5 MM GYPSUM
FALSE CEILING

F.F.L

SECTION A DETAIL AT A

150 5620
5770
5100

BEDROOM 2
5700

REV DATE COMMENTS


3D VIEW
ARCHITECT

LVL. asppire

SECTION

SECTION

SECTION
D
A

C
-300MM 830 RAILING 830
ARCHITECTS AND PLANNERS
# 701, 8TH FLOOR, AMAN HOUSING SOCIETY,
11878

600

600
W19

1050
RAILING

C01 C02 SURVEY NO. 134/1, 10 BHOSALE NAGAR,


W4
PUNE - 411016

RAILING
E PH: 020 - 25561054 | WWW.VSGS.IN | INFO@VSGS.IN

2540
SECTION
MASTER BEDROOM 3 TERRACE
PALMET

1880

4360
LVL LVL
4550 MM 4550 MM
600

D2
W4 CLIENT
D2
W15

370
2620 RAILING C08

600
D3 C09

3460
MR. ANIL JAVLEKAR

300
C06 C07
LEDGE WALL
W5A
DETAIL AS PER TOILET 4
TOILET DETAIL

750
C10
C11
PROJECT TITLE

4270
5620 GYPSUM FALSE CEILING 530 2300
W21
LVL
W16
LVL

600 MM 900 MM
PROPOSED BUNGALOW AT

2240
LVL -150MM W6

2090
B
SECTION
C17
BHUGAON

300
C12 C13

LVL. 1800
1100

300
D3
525
D3
675 1580
C14
5780

830
150 450

C16

600
C15 W18
D2

1275

1280
-150MM
D2
LVL
DRAWING TITLE
370

4550 MM
D3
UP 950

W14

440

440
GYPSUM FALSE CEILING MASTER BEDROOM 2
GYMNASIUM
TOILET 5 MASTER BEDROOM 4
BEDROOM 2 FALSE CEILING

2990
F
D09
LVL SECTION
LVL
LVL

4280
LVL -300MM 4550 MM LIFT 4550 MM 4550 MM

DRAWING PURPOSE

3600
1800
C22

830
C20 C21

600

600
1200
460 W11 W20 W4 W4

FOR CONSTRUCTION

1280

1200
NO. OF
RISERS-24 700
4060 R - 152 MM
250
600
C19 T - 300.0 MM

830
C18

600
700
DRAWN BY YJ CHECKED BY SP
LEDGE WALL
SECTION

W4 W4
HEIGHT TILL
WINDOW SILL PROJECT NO I041
A

DRAWING NO I041_WD_302

SCALE NTS
REVISION NO 00
DATE 04.AUG.2022
FALSE CEILING PLAN FOR BEDROOM 2 LEGEND KEY PLAN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

You might also like