ITR-MST (Field Fab. Tank)
ITR-MST (Field Fab. Tank)
:
FOR TANK (GENERAL) PAGE : OF
Note :
Name
Signature
Date
Form No. : ITR-MST-001
INSPECTION AND TEST REPORT REPORT NO. :
Note :
Check
Point
Point
DWG Actual Diff DWG Actual Diff DWG Actual Diff DWG Actual Diff
1 21
2 22
3 23
4 24
5 25
6 26
7 27
8 28
9 29
10 30
11 31
12 32
13 33
14 34
15 35
16 36
17 37
18 38
19 39
20 40
0'
Note :
Inspection
Drawing No.
Area or Part
Joint Preparation
Location or Result
Weld Checking
No Orientation of Misalign Root Cleaning of Fit-up Remark
Joint No. Date
Weld Joint (HIHO) Gap Weld Joint Accept Reject
Note :1. See the Weld Joint Map or the applicable drawing attached.
Signature
Date
Form No. : ITR-MST-004
INSPECTION AND TEST REPORT REPORT NO. :
Inspection
Drawing No.
Area or Part
Welding Completed Weld(1)
Weld Result
No Applied. Welder Back Chipping Visual NDE(2) Remark
Joint No.
WPS No. No. Check(1) Check RT MT PT Accept Reject
Note :
(1) To fill completion date of each inspection and testing in the blank.
(2) The NDE result of the weld joint is shown in the NDE report separately.
(3) The welder No. and RT location may be recorded in other sheet with the
illustration of weld joint location such as-built RT Map, Weld Map, etc.
Inspection Result : □ Accept □ Conditionally Accept □ Reject
Inspection by Subcontractor Contractor Client
Name
Signature
Date
Form No. : ITR-MST-005
INSPECTION AND TEST REPORT REPORT NO. :
1 9
2 10
3 11
4 12
5 13
6 14
7 15
8 16
Average =
L
1/4L Scale
1/4L
Shell Plate
Note :
Signature
Date
Form No. : ITR-MST-006
INSPECTION AND TEST REPORT REPORT NO. :
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
1/4L 1/4L
Top(A)
Height
Shell Plate
Bottom(B)
Note :
Signature
Date
Form No. : ITR-MST-007
INSPECTION AND TEST REPORT REPORT NO. :
Shell Shell
Check Check
Plate Actual Radius(mm) Diff(mm) Plate Actual Radius(mm) Diff(mm)
point point
No. No.
1 1
S1-1 S1-5
2 2
3 3
S1-2 S1-6
4 4
5 5
S1-3 S1-7
6 6
7 7
S1-4 S1-8
8 8
Bottom Plate
Note :
Signature
Date
Form No. : ITR-MST-008
INSPECTION AND TEST REPORT REPORT NO. :
(NPS)
Attached
Tolerance.: ± 9.5 ± 14.3 / ± 25.4 -0, +5 / -0, +10 +1/2˚ / +1˚ Max 1.5mm
on
DWG Diff. DWG Diff. DWG Diff. Diff. Diff.
F
C 0˚
S
B
C
270˚ 90˚
D
B
A
F
180˚
* Note : All flange bolt holes shall be straddled the principal center line of the tank, unless
otherwise specified unless otherwise specified
Signature
Date
Form No. : ITR-MST-009
INSPECTION AND TEST REPORT REPORT NO. :
FOR GAP OF RIM SPACE FOR INTERNAL
PAGE : OF
FLOATING ROOF(1/2)
Average
Differential
Note :
Signature
Date
Form No.: ITR-MST-010
INSPECTION AND TEST REPORT REPORT NO. :
FOR GAP OF RIM SPACE FOR INTERNAL
PAGE : OF
FLOATING ROOF(2/2)
Primary rim plate Bolting joint & Bolting joint & 40mm
2
Visual Overlap Overlap
Floating tube ass'y Floating tube saddle Damage visual Vertical & Horizon.
Support
Tolerance :
Note :
Tolerance :
Note :
Top
Y Location of
String Plumb bob
X
Gauge Pole X' X
Check Point
Plumb bob
Y'
* Note : The verticality of each gauge pole shall not exceed the recommended tolerance
of instrument maker. (Tolerance : ±75 mm)
Note :
Signature
Date
Form No.: ITR-MST-013
INSPECTION AND TEST REPORT REPORT NO. :
Test Method
Assembly or Area
Surface Condition
(DWG No)
Note or Sketch :
Signature
Date
Form No.: ITR-MST-014
INSPECTION AND TEST REPORT REPORT NO. :
Test Method
Assembly or Area
Assembly or Area ID
(DWG No)
Note or Sketch :
Tolerance :
Signature
Date
Nozzle Nozzle
Nozzle
Nozzle
Attached Checking Checking Checking Checking
No.
No.
Size Size Attached on
on Result Date Result Date
(NPS) (NPS)
Pressure Gauge
Detector Solution
Note :
Signature
Date
Form No.: ITR-MST-016
INSPECTION AND TEST REPORT REPORT NO. :
FOR WATER FILLING AND FOUNDATION
PAGE : OF
SETTLEMENT CHECK-2 STAGE
Average Differential
Survey Point 1 (0˚) 2 (45˚) 3 (90˚) 4 (135˚) 5 (180˚) 6 (225˚) 7 (270˚) 8 (315˚)
(mm) (mm)
1 Initial
2 1/2 Filling
3 Full Filling
4 1/2 Draining
5 Full Draining
Average/Settlement
Differential(mm)
Tolerance :
Note :
Name
Signature
Date
Average Differential
Survey Point 1 (0˚) 2 (45˚) 3 (90˚) 4 (135˚) 5 (180˚) 6 (225˚) 7 (270˚) 8 (315˚)
(mm) (mm)
1 Initial
2 1/2 Filling
3 Full Filling
4 1/2 Draining
5 Full Draining
6 3/4 Draining
7 2/4 Draining
8 3/4 Draining
9 Full Draining
Average/Settlement
Differential(mm)
Tolerance :
Note :
1st Step: settlement check for hydrostatic test. 6th Step: 1/4 the draining of water.
2nd Step: 1/4th filling of water. 7th Step: half draining of water.
3rd Step: half filling of water. 8th Step: 3/4th draining of water.
4th Step: 3/4 filling of water. 9th Step: settlement check after full draining of tank.
5th Step: full filling of water.
Name
Signature
Date
Form No.: ITR-MST-018
INSPECTION AND TEST REPORT REPORT NO. :
Finish
By Weight
By Volume
Tolerance :
Note :
Name
Signature
Date
Form No.: ITR-MST-019
INSPECTION AND TEST REPORT REPORT NO. :
Tolerance(thickness) :
Note :
Name
Signature
Date
Form No.: ITR-MST-020
INSPECTION AND TEST REPORT REPORT NO. :
This storage tank described above is certified as having been satisfactorily and completely
inspected in accordance with the contract painting specification and accepted in the presence
Tolerance(thickness) :
Note :
Name
Signature
Date
Form No.: ITR-MST-021
INSPECTION AND TEST REPORT REPORT NO. :
Insulation Specification
1) Surface Condition :
2) Insulation Material :
3) insulation Thickness :
4) Number of Layers :
5) Vapor- Barrier :
6) Metal Jacketing :
Inspection Result
1) Surface Condition :
2) Insulation Material :
3) insulation Thickness :
4) Number of layers :
5) Vapor- Barrier :
6) Metal Jacketing :
Name
Signature
Date
Drawing No :
Tank Type :
Diameter :
Height :
Inspection Result :
This storage tank described above is certified as having been satisfactorily and completely
inspected for Spray Pattern of Water Spray System in accordance with contract
Note :
Name
Signature
Date
Form No.: ITR-MST-023
INSPECTION AND TEST REPORT REPORT NO. :
Drawing No.
Note :
Name
Signature
Date
Form No.: ITR-MST-024
INSPECTION AND TEST REPORT REPORT NO. :
Inside cleanness
Mixer
Other internals
Floor tested by
Roof tested by
Deck checked by
Bottom tested by
Note :
Name
Signature
Date
Form No.: ITR-MST-025
INSPECTION AND TEST REPORT REPORT NO. :
FOR VISUAL INSPECTION OF TANK
PAGE : OF
EXTERNAL
Note :
Name
Signature
Date
Form No.: ITR-MST-026
INSPECTION AND TEST REPORT REPORT NO. :
Client : (Name)
(Address)
Project Title :
Contract No. :
Tank No. :
Tank Type : Cone Roof Tank Dome - Internal Floating Roof Tank
(Location)
and described above has been satisfactorily and completely constructed
In accordance with the applicable requirements of contract Specification.
(Manufacturer's name)
(Representative) Date
The tank described above has been inspected in accordance with the
applicable requirements of Contract Specification and has been accepted
in the presence of the witness(es) signed below.
( ) (Representative) Date
Note :
Name
Signature
Date
Form No.: ITR-MST-027
WELDING PROCEDURE PAGE: 1 OF 2
SPECIFICATION (WPS) (1/2)
JOINTS (QW-402)
Groove Design
Backing (Yes)
Backing Material (Type)
(Refer to both backing and retainers.)
Metal Non Fusion Metal
Nonmetalic Other
CMN-WPS-001
PAGE: 1 OF 2
CMN-WPS-001
WELDING PROCEDURE PAGE: 2 OF 2
SPECIFICATION (WPS) (2/2)
TECHNIQUE (QW-410)
String or Weave bead
Orifice of Gas Cup Size
Initial and interpass Cleaning (Brushing, Grinding etc.)
Name
Signature
Date
CMN-WPS-002
PAGE: 2 OF 2
Percentage Composition
Flow Rate
See Below
Other
(kJ/cm)
(Heat Input)
Client (Approved)
CMN-WPS-002
WELDER QUALIFICATION Doc.No.:
RECORD (WQR) Page of
Picture
Radiographic Test Results for Alternative Qualification of Groove Welds by Radiography
We certify that statements in this record are correct and that the test coupons were prepared, welded, and tested
in acordance with the requirements of Section IX of the ASME standard.
Name
Signature
Date
CMN-WQR-001
Doc.No.:
Page of
Range of Qualified
correct and that the test coupons were prepared, welded, and tested
on IX of the ASME standard.
Client (Approved)
CMN-WQR-001