You are on page 1of 1

FLANGE TIGHTENING REPORT

Form No. : TNB-QC-MFR-110 Rev 0

OWNER : EASTMAN INTERLAYERS (M) SDN. BHD. DOC NO. :

LOCATION : KRP-EFFLUENT BUILDING DATE :

PROJECT : EPCC OF KRP EFFLUENT RECOVERY PROJECT

Test Pack: Pipe Spec:

Line No.:

Flange Size : Rating : LBS Type :

Bolt Size : Qty. : Type :

Condition of Flange Faces : Accepted

Condition of Bolts and Nuts : Accepted


Equipment Name : Torque Wrench
Equipment Model : Equipment Serial No. :

Equipment Calibration Date : Equipment Certificate No. :

TORQUE TENSION

Lubricant : Loctile Nickel Anti-Seize

1st Pass 30% lbf.ft / Nm Pressure A : NA PSI / BarG


2nd Pass 60% lbf.ft / Nm Pressure B : NA PSI / BarG
3rd Pass 100% lbf.ft / Nm Breakloose Pressure : NA PSI / BarG

Remarks

COMPLETED BY TNB OWNER

SIGNATURE

NAME

DATE

Page 1 of 1

You might also like