5A.1 EXPORT ACES PERMIT AND/OR ACES UPDATES


Please see below, if the “Response Type: Delivery of Ordered Charts” (after an order is approved) or “Response Type: Delivery of Chart Updates” (your weekly update) –
this means you have new permits and chart updates (known as Chart Data File) to install on ECDIS.
(8) This is what the exported permit and
(1) Look at the updates look like on your PC in the folder
“Response Type” you selected in Steps 2 and 4.
(3) Chart Data is exported
(ECDIS chart updates).
Click OK
(2) Click Export

(5) Chart Permit is exported


(4) Click Export
(ECDIS permit file).

(6) Click Save As IMPORTANT: Please read the README.TXT carefully it


contains very important Navigational information regarding
(7) AVCS README.TXT and ENC ENCs, also the Cancellation List can be printed and included
Cancellation List files are exported. in eQuip or NP133C.

5A.2 PREPARE CHARTWORLD USB FOR eGLOBE G2 IMPORTANT NEXT STEPS


(9) Insert the small ChartWord USB to your PC and It is important to only do the required steps to ensure your charts are installed and
delete all files and folders. updated correctly. Please follow the table based on your required action.
NOTE: This is not the ACES USB Card.

SCENARIO ACTION QRG SECTION YOU NEED

Install Weekly Install ChartWorld 5A.3 WEEKLY UPDATE: INSTALL ON


Chart Updates USB onto ECDIS eGLOBE G2
(10) Copy all folders from Step 8
to the ChartWorld USB
Install New Install Chart Permit 5A.4 NEW CHART INSTALLATION: ON
Charts just then ACES USB eGLOBE G2
ordered

Page 1 of 2
Version 2.1

5A.3 WEEKLY UPDATE: INSTALL ON eGLOBE G2


IMPORTANT: Please ensure you have followed steps in 5A.1 and 5A.2 in this QRG to prepare the permit and updates first.

3) Click Scan Drives

1) Insert ChartWorld USB (from


Step 10) into 1 ECDIS only. Please
always select 1 ECDIS for chart 2) In eGlobe G2 Click 5) Progress will show in this 6) Click Apply Changes to
installation the Chart Loader window, check for Errors and if install on the ECDIS (if
nd
button on the Task Bar any warnings or errors click the there is a 2 ECDIS then
Last Report button the charts will synchronise
to both ECDIS)

4) Click OK

5A.4 NEW CHART INSTALLATION: ON eGLOBE G2 (SW version 1.0.1.38 and below)
IMPORTANT: Please ensure you have followed steps in 5A.1 and 5A.2 in this QRG to prepare the permit and updates first.

STAGE 1: NOTE: You may receive errors during the PROCESS stage but please
Install Permit and Updates Exported From continue with all 2 STAGES to fully install and update the charts.
ChartBrowser:
Insert ChartWorld USB (from Step 10 in Stage 5A.2)
into 1 ECDIS only. Do all steps shown to the right.

STAGE 2:
Install Base Chart Data for New Charts from ACES
USB card:
Insert ACES USB into same ECDIS repeat steps shown
to the right.

Page 2 of 2