Daily Progress Report:

Date : 30.10.2023

Sl.No. Building Area Detail of Works done Remarks.


01. Existing RPF Block Aluminium makeshift Electrical connection to
room completed. be done.
02. Railway Guest House Layout of this building
done.
03. Temporary Building Dressing & soling in
foundation completed.
04. Labour Hutment Dressing & Soling in
foundation completed.
05. Upcoming Power House Stacking of good bricks
Building. collected from dismantled
area and segregation of
steel and other usable
materials to get the area
clean for further works.
06. Labour Strength engaged Skilled =
on works. Helper/Unskilled=