DESIGN STATUS TABLE

FINAL DESIGN - GENERAL ARRANGEMENT DRAWING LIST 1. SUBMITTAL STATUS 2. SUBMITTAL 3. SUBMITTAL APPROVED BY ENGINEER

GENERAL ARRANGEMENT DRAWINGS DATE DATE COMMENT REV NO1 DATE REV NO2 DATE DATE COMMENT
LAYOUT MRZ-WWTP-00-GD-01 2/29/2016 1 3/7/2016 2 4/21/2016 5 6/20/2016

MOBILIZATION PLAN SHOWN IN GENERAL LAYOUT MRZ-WWTP-00-GD-02 2/11/2016 4/11/2016 APPROVED

MOBILIZATION LAYOUT MRZ-WWTP-00-GD-03 2/11/2016 2/18/2016 RETURNED 1 2/19/2016 4/11/2016 APPROVED

PERMANENT FENCE PLAN MRZ-WWTP-00-GD-04 2/11/2016 1 2/22/2016 2/29/2016 APPROVED

TYPICAL FENCE DETAIL PLAN and SECTION MRZ-WWTP-00-GD-05 2/11/2016 1 2/19/2016 2/29/2016 APPROVED

Engineer’s e-
TEST BORINGS LAYOUT MRZ-WWTP-00-GD-06 2/11/2016 16.02.2016 1 2/18/2016 2/18/2016 APPROVED
mail dated

GENERAL PIPING LAYOUT MRZ-WWTP-00-GD-07 2/29/2016 4/18/2016 RETURNED 1 4/21/2016

GENERAL LAYOUT PIPING SECTIONS MRZ-WWTP-00-GD-08 2/29/2016 4/18/2016 RETURNED 1 4/21/2016

RAIN WATER PLAN MRZ-WWTP-00-GD-09 2/29/2016

TREATED WATER PLAN MRZ-WWTP-00-GD-10 2/29/2016

FIREFIGHTIN NETWORK WATER PLAN MRZ-WWTP-00-GD-11 2/29/2016

SERVICE WATER PLAN MRZ-WWTP-00-GD-12 2/29/2016

WASTEWATER PLAN MRZ-WWTP-00-GD-13 2/29/2016

ELECTRICAL MANHOLE PLAN MRZ-WWTP-00-GD-14 2/29/2016

CLASSIFICATION OF EX-ZONE AREA MRZ-WWTP-00-GD-15 2/29/2016

TOPOGRAPHIC PLAN MRZ-WWTP-00-GD-16 5/5/2016

GENERAL LAYOUT WITH COORDINATES MRZ-WWTP-00-GD-017 5/27/2016

TOPOGRAPHIC PLAN GENERAL LAYOUT SECTION MRZ-WWTP-00-GD-018 6/3/2016 1


6/24/2016
PASA CREEK REHABILIT MRZ-WWTP-00-GD-019 RETURNED
6/12/2016 6/16/2016

BPIPING AND INSTRUMENTATION DIAGRAM-1 MRZ-WWTP-01-GD-01 2/29/2016 3/30/2016 RETURNED 1 4/1/2016 2 6/20/2016

PIPING AND INSTRUMENTATION DIAGRAM MRZ-WWTP-01-GD-02 2/29/2016 3/30/2016 RETURNED 1 4/1/2016 4 6/20/2016

LEGEND MRZ-WWTP-01-GD-03 2/29/2016 3/30/2016 RETURNED 1 4/1/2016 4/11/2016 APPROVED

12/24/2023
FLOW DIAGRAM & MASS - BALANCE DIAGRAM MRZ-WWTP-01-GD-04 2/29/2016 4/11/2016 APPROVED

HHYDRAULIC PROFILE (2040) MRZ-WWTP-02-GD-01 2/11/2016 3/29/2016 RETURNED 1 3/30/2016 4/7/2016 APPROVED

HYDRAULIC PROFILE (2025) MRZ-WWTP-02-GD-02 2/11/2016 3/29/2016 RETURNED 1 3/7/2016 2 4/1/2016 4/7/2016 APPROVED

12/24/2023
DESIGN STATUS TABLE
1.
FINAL DESIGN - STRUCTURAL DRAWINGS SUBMITTAL 1.STATUS 2. SUBMITTAL 2.STATUS 3. SUBMITTAL FINAL STATUS
UNIT NAME
UNIT NO DRAWING NO DRAWING NAME DATE DATE COMMENT REV NO DATE DATE COMMENT REV NO DATE DATE COMMENT

MRZ-WWTP-06-ST-001 FORMWORK PLANS 5/18/2016 25.08.2015

MRZ-WWTP-06-ST-002 FORMWORK PLANS & SECTIONS 5/18/2016

6 BLOWER BUILDING MRZ-WWTP-06-ST-003 REINFORCEMENT DETAILS-1 5/18/2016

MRZ-WWTP-06-ST-004 REINFORCEMENT DETAILS-2 5/18/2016 6/21/2016 RETURNED 1 6/23/2016

MRZ-WWTP-06-ST-005 REINFORCEMENT DETAILS-3 5/18/2016

FORMWORK PLAN & SECTIONS & REINFORCEMENT


11 FLOATING SLUDGE PUMPING STATION MRZ-WWTP-11-ST-001 DETAILS 4/14/2016 4/30/2016 RETURNED 1 5/13/2016 5/26/2016 APPROVED

MRZ-WWTP-12-ST-001 FORMWORK PLANS & SECTIONS 4/14/2016 4/30/2016 RETURNED 1 5/20/2016 5/26/2016 APPROVED

12 RETURN&EXCESS SLUDGE PUMPING STATION MRZ-WWTP-12-ST-002 REINFORCEMENT DETAILS-1 4/14/2016 4/30/2016 RETURNED 2 5/20/2016 Rev1?? 5/26/2016 APPROVED

MRZ-WWTP-12-ST-003 REINFORCEMENT DETAILS-2 4/14/2016 4/30/2016 RETURNED 1 5/20/2016 RETURNED 5/20/2016 2 5/25/2016 5/26/2016 APPROVED

MRZ-WWTP-13_17-ST-001 FORMWORK PLANS 4/14/2016 1 5/13/2016 APPROVED

MRZ-WWTP-13_17-ST-002 SECTIONS 4/14/2016 1 5/13/2016 APPROVED

13_17 GRAVITY SLUDGE THICKENER& REJECT WATER PUMP MRZ-WWTP-13_17-ST-003 REINFORCEMENT DETAILS-1 4/14/2016 5/13/2016 APPROVED
STATION

MRZ-WWTP-13_17-ST-004 REINFORCEMENT DETAILS-2 4/14/2016 4/30/2016 RETURNED 1 5/9/2016 5/13/2016 APPROVED

MRZ-WWTP-13_17-ST-005 REINFORCEMENT DETAILS-3 4/14/2016 5/13/2016 APPROVED

MRZ-WWTP-24-ST-001 FORMWORK PLANS 6/14/2016 1 6/23/2016


BUILDINGS
MRZ-WWTP-24-ST-002 SECTIONS 6/14/2016 6/20/2016 RETURNED 1 6/23/2016

24 WORKSHOP BUILDING MRZ-WWTP-24-ST-003 REINFORCEMENT DETAILS-1 6/14/2016 6/20/2016 RETURNED 1 6/23/2016

MRZ-WWTP-24-ST-004 REINFORCEMENT DETAILS-2 6/14/2016 6/20/2016 RETURNED 1 6/23/2016

MRZ-WWTP-24-ST-005 REINFORCEMENT DETAILS-3 6/14/2016 6/20/2016 RETURNED 1 6/23/2016

MRZ-WWTP-02-ST-001 FORMWORK PLANS 6/13/2016

MRZ-WWTP-02-ST-002 SECTIONS 6/13/2016

2 AERATED GRIT AND GREASE REMOVAL UNIT MRZ-WWTP-02-ST-003 REINFORCEMENT DETAILS-1 6/13/2016

MRZ-WWTP-02-ST-004 REINFORCEMENT DETAILS-2 6/13/2016

MRZ-WWTP-02-ST-005 REINFORCEMENT DETAILS-3 6/13/2016

MRZ-WWTP-23-ST-001 FORMWORK PLANS 6/20/2016

MRZ-WWTP-23-ST-002 SECTIONS 6/20/2016

23 ADMINISTRATION BUILDING MRZ-WWTP-23-ST-003 REINFORCEMENT DETAILS-1 6/20/2016

MRZ-WWTP-23-ST-004 REINFORCEMENT DETAILS-2 6/20/2016

MRZ-WWTP-23-ST-005 REINFORCEMENT DETAILS-3 6/20/2016

0 GENERAL SITE EXCAVATION PLAN AND SECTIONS MRZ-WWTP-00-ST-001 GENERAL SITE EXCAVATION PLAN AND SECTIONS 5/25/2016 1 6/2/2016 2 6/17/2016

MRZ-WWTP-01-ST-001 FORMWORK PLANS 5/25/2016 5/31/2016 RETURNED 1 6/2/2016 6/17/2016 APPROVED

MRZ-WWTP-01-ST-002 UNIT SECTIONS 5/25/2016 6/17/2016 APPROVED

MRZ-WWTP-01-ST-003 REINFORCEMENT DETAILS-1 5/25/2016 6/17/2016 APPROVED

MRZ-WWTP-01-ST-004 REINFORCEMENT DETAILS-2 5/25/2016 6/17/2016 APPROVED

1 PRE-TREATMENT UNIT MRZ-WWTP-01-ST-005 REINFORCEMENT DETAILS-3 5/25/2016 6/17/2016 APPROVED

MRZ-WWTP-01-ST-006 REINFORCEMENT DETAILS-4 5/25/2016 6/17/2016 APPROVED

MRZ-WWTP-01-ST-007 REINFORCEMENT DETAILS-5 5/25/2016 5/31/2016 RETURNED 1 6/2/2016 6/17/2016 APPROVED

MRZ-WWTP-01-ST-008 REINFORCEMENT DETAILS-6 5/25/2016 6/17/2016 APPROVED

MRZ-WWTP-01-ST-009 REINFORCEMENT DETAILS-7 5/25/2016 6/17/2016 APPROVED

FORMWORK PLAN & SECTIONS & REINFORCEMENT


3 INLET FLOWMETER CHAMBER MRZ-WWTP-03-ST-001 DETAILS 5/13/2016 5/26/2016 RETURNED 1 5/16/2016 6/21/2016 APPROVED

MRZ-WWTP-04-ST-001 FORMWORK PLAN & SECTIONS 4/14/2016 5/13/2016 APPROVED


4 DISTRIBUTION CHAMBER
MRZ-WWTP-04-ST-002 REINFORCEMENT DETAILS 4/14/2016 4/30/2016 RETURNED 1 5/9/2016 5/13/2016 APPROVED

MRZ-WWTP-05-ST-01 FOUNDATION FORMWORK PLAN 3/19/2016 4/1/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

MRZ-WWTP-05-ST-02 FORMWORK PLAN & SECTIONS 3/19/2016 4/1/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

HYDRAULIC MRZ-WWTP-05-ST-03 REINFORCEMENT DETAILS-1 3/19/2016 4/1/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED
UNITS ACTIVATED SLUDGE TANK
5 &
DISTRIBUTION CHAMBER-2 MRZ-WWTP-05-ST-04 REINFORCEMENT DETAILS-2 3/19/2016 4/1/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

MRZ-WWTP-05-ST-05 REINFORCEMENT DETAILS-3 3/19/2016 4/1/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

MRZ-WWTP-05-ST-06 REINFORCEMENT DETAILS-4 3/19/2016 4/1/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

MRZ-WWTP-08.1-ST-01 FORMWORK PLAN & SECTIONS 3/19/2016 3/31/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

MRZ-WWTP-08.1-ST-02 FORMWORK PLAN & SECTIONS 3/19/2016 3/31/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

8.1 SECONDARY CLARIFIER BASIN-1 MRZ-WWTP-08.1-ST-03 REINFORCEMENT DETAILS-1 3/19/2016 3/31/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

MRZ-WWTP-08.1-ST-04 REINFORCEMENT DETAILS-2 3/19/2016 3/31/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

MRZ-WWTP-08.1-ST-05 REINFORCEMENT DETAILS-3 3/19/2016 3/31/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

MRZ-WWTP-08.2-ST-01 FORMWORK PLAN & SECTIONS-1 3/26/2016 3/31/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

MRZ-WWTP-08.2-ST-02 FORMWORK PLAN & SECTIONS-2 3/26/2016 3/31/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

8.2 SECONDARY CLARIFIER BASIN-1 MRZ-WWTP-08.2-ST-03 REINFORCEMENT DETAILS-1 3/26/2016 3/31/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

MRZ-WWTP-08.2-ST-04 REINFORCEMENT DETAILS-2 3/26/2016 3/31/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

MRZ-WWTP-08.2-ST-05 REINFORCEMENT DETAILS-3 3/26/2016 3/31/2016 RETURNED 1 4/5/2016 4/7/2016 APPROVED

5_8 SECONDARY CLARIFIERS&ACTIVATED SLUDGE TANK MRZ-WWTP-5-8-ST-001 EXCAVITATION PLAN & SECTIONS 3/25/2016 5/26/2016 APPROVED

FORMWORK PLAN & SECTIONS & REINFORCEMENT


9 OUTLET FLOWMETER CHAMBER MRZ-WWTP-09-ST-001 DETAILS 5/13/2016 5/26/2016 RETURNED 1 5/16/2016 6/21/2016 APPROVED

12/24/2023
REPORTS

GENERAL DOCUMENTS

QUALITY ASSURANCE PLAN

LIST OF STANDARDS

ENVIRONMENTAL MANAGEMENT PLAN

MATERIALS TO BE USED FOR EACH BUILDING

SOFTWARE TO BE USED IN STRUCTURAL DESIGN

DESIGN APPROACH FOR USING THE SOFTWARE

CONCRETE AND STEEL CLASSES TO BE USED FOR EACH SPECIFIC TYPE OF STRUCTURE

OVERALL CONTROL BLOCK DIAGRAM

MODE OF OPERATION WITH BRIEF DESCRIPTION

SOIL INVESTIGATION AND GEOTECHNICAL REPORT

PROCESS RELATED DOCUMENTS

MAIN DESIGN CONDITIONS FOR MERZIFON WWTP

PRELIMINARY CONTROL PHILOSOPHY

HEADLOSS CALCULATIONS

SCHEDULES

CONSUMER LIST WITH ALL RELEVANT INFORMATION


CALCULATIONS (TRANSFORMER, DIESEL GENERATOR, VOLTAGE DROP, LIGHTING,
EARTHING ETC. C

PROCESS REPORT

1. MONTHLY REPORT

2.MONTHLY REPORT

DESIGN REPORT FOR ODOR TREATMENT UNIT

01-PRETREATMENT UNITS STRUCTURAL CALCULATION REPORT

AERATED GRIT AND GREASE REMOVAL UNIT STRUCTURAL CALCULATION REPORT

INLET FLOWMETER CHAMBER STRUCTURAL CALCULATION REPORT

DISTRIBUTION CHAMBER-1 STRUCTURAL CALCULATION REPORT


05 - ACTIVATED SLUDGE TANK & 07 - DISTRIBUTION CHAMBER 2 STRUCTURAL
CALCULATION REPORT
06 BLOWER BUILDING STRUCTURAL CALCULATION REPORT

8.1 SECONDARY CLASSIFIER BASIN STRUCTURAL CALCULATION REPORT

8.2 SECONDARY CLASSIFIER BASIN STRUCTURAL CALCULATION REPORT

OUTLET FLOWMETER CHAMBER STRUCTURAL CALCULATION REPORT

FLOATING SLUDGE STRUCTURAL CALCULATION REPORT

RETURN AND EXCESS SLUDGE STRUCTURAL CALCULATION REPORT

GRAVITY THICKENER STRUCTURAL CALCULATION REPORT

REJECT WATER PUMP STATION STRUCTURAL CALCULATION REPORT

ADMINISTRATION BUILDING STRUCTURAL CALCULATION REPORT

WORKSHOP BUILDING STRUCTURAL CALCULATION REPORT


METHOD STATEMENT

METHOD STATEMENT FOR GEOTECHNICAL INVESTIGATION WORKS

METHOD STATEMENT FOR CIVIL WORKS

METHOD STATEMENT FOR MECHANICAL WORKS

METHOD STATEMENT FOR ELECTRICAL WORKS

METHOD STATEMENT FOR EARTH WORKS

METHOD STATEMENT FOR PIPE PASSAGE THROUGH STRUCTURE WALLS

METHOD STATEMENT FOR PNEUMATIC TEST FOR PIPES

METHOD STATEMENT FOR PIPING WORKS

METHOD STATEMENT FOR EPOXY APPLICATION AT ACTIVATED SLUDGE TANK


DESIGN STATUS TABLE
1. SUBMITTAL 1.STATUS 2. SUBMITTAL

REPORT NUMBER DATE DATE COMMENT REV NO1

MRZ-WWTP -00-RP-001 2/11/2016 3/3/2016 RETURNED 1

MRZ-WWTP -00-RP-002 2/29/2016

MRZ-WWTP -00-RP-003 2/29/2016

MRZ-WWTP-00-RP-004 2/29/2016

MRZ-WWTP-00-RP-005 2/29/2016

MRZ-WWTP-00-RP-006 2/29/2016

MRZ-WWTP-00-RP-007 2/29/2016

MRZ-WWTP-00-RP-008 2/29/2016 3/31/2016 RETURNED 1

MRZ-WWTP-00-RP-009 2/29/2016 3/31/2016 RETURNED 1

MRZ-WWTP-00-RP-010 2/29/2016 RETURNED 1

REPORT NUMBER DATE DATE COMMENT REV NO1


MRZ-WWTP-00-RP-101 2/29/2016

MRZ-WWTP-00-RP-102 2/29/2016

MRZ-WWTP-00-RP-103 2/29/2016 3/29/2016 RETURNED 1

MRZ-WWTP-00-RP-104 2/29/2016

MRZ-WWTP-00-RP-105 2/29/2016 3/31/2016 RETURNED 1

MRZ-WWTP-00-RP-106 2/29/2016 3/31/2016 RETURNED 1

MRZ-WWTP-00-RP-107 2/29/2016 RETURNED 1

MRZ-WWTP-00-RP-108 2/29/2016

MRZ-WWTP-00-RP-109 4/7/2016

MRZ-WWTP-00-RP-110 4/7/2016

MRZ-WWTP-01-RP-101 5/25/2016 5/31/2016 RETURNED 1

MRZ-WWTP-02-RP-101 6/13/2016 6/21/2016 RETURNED

MRZ-WWTP-03-RP-101 5/13/2016

MRZ-WWTP-04-RP-101 4/14/2016 4/30/2016 RETURNED 1


MRZ-WWTP-05-RP-101 3/19/2016

MRZ-WWTP-06-RP-101 5/18/2016 6/21/2016 RETURNED 1

MRZ-WWTP-08.1-RP-101 3/19/2016

MRZ-WWTP-08.2-RP-101 3/19/2016

MRZ-WWTP-09-RP-101 5/13/2016

MRZ-WWTP-11-RP-101 4/14/2016 4/30/2016 RETURNED 1

MRZ-WWTP-12-RP-101 4/14/2016

MRZ-WWTP-13-RP-101 4/14/2016

MRZ-WWTP-17-RP-101 4/14/2016

MRZ-WWTP-23-RP-101 6/20/2016

MRZ-WWTP-24-RP-101 6/14/2016 1

REPORT NUMBER DATE DATE COMMENT REV NO1

MRZ-00-MS-101 (MRZ-WWTP-00-MS-201) 2/8/2016 2/1/2016 RETURNED 1

MRZ-WWTP-00-MS-202 2/29/2016

MRZ-WWTP-00-MS-203 2/29/2016

MRZ-WWTP-00-MS-204 2/29/2016 3/31/2016 RETURNED 1

MRZ-WWTP-00-MS-205 3/29/2016 4/6/2016 RETURNED 1

MRZ-WWTP-00-MS-206 5/13/2016 1

MRZ-WWTP-00-MS-207 5/16/2016 COMBINE


e-mail from Mr.
MRZ-WWTP-00-MS-208 5/17/2016 5/17/2016 1
Baynes
MRZ-WWTP-00-MS-209 6/14/2016
2. SUBMITTAL 2.STATUS 3. SUBMITTAL APPROVED BY ENGINEER

DATE DATE COMMENT REV NO2 DATE DATE

3/19/2016

4/21/2016 5/3/2016

4/21/2016 5/3/2016

3/19/2016 3/31/2016

DATE DATE COMMENT REV NO2 DATE DATE

4/1/2016 4/7/2016

4/21/2016 5/3/2016

4/21/2016 5/3/2016

3/8/2016

6/2/2016

6/21/2016

5/9/2016 5/13/2016
4/7/2016

6/23/2016

4/7/2016

4/7/2016

6/21/2016

5/25/2016 5/26/2016

5/26/2016

5/13/2016

5/13/2016

6/23/2016

DATE DATE COMMENT REV NO2 DATE DATE


Engineer’s e-
2/11/2016 2/16/2016 2 2/18/2016 3/31/2016
mail

4/21/2016 5/3/2016

4/15/2016

5/27/2016

COMBINED WITH MS FOR PIPING WORKS

5/17/2016
APPROVED BY ENGINEER

COMMENT

APPROVED

APPROVED

APPROVED

COMMENT

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED
APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

COMMENT

APPROVED

APPROVED

APPROVED
DESIGN STATUS TABLE
FINAL DESIGN -FUNCTIONAL DRAWINGS 1. SUBMITTAL 1.STATUS 2. SUBMITTAL 2.STATUS 3. SUBMITTAL FINAL STATUS

UNIT NO UNIT NAME DRAWING NO DRAWING NAME DATE DATE COMMENT REV NO DATE DATE COMMENT REV NO DATE DATE COMMENT
MRZ-WWTP-01-FN-01 PLANS 2/29/2016 4/18/2016 RETURNED 1 4/22/2016 6/17/2016 APPROVED

1 PRE TREATMENT UNITS MRZ-WWTP-01-FN-02 SECTIONS-1 2/29/2016 4/18/2016 RETURNED 1 4/22/2016 2 5/11/2016 6/17/2016 APPROVED

MRZ-WWTP-01-FN-03 SECTIONS-2 2/29/2016 4/18/2016 RETURNED 1 4/22/2016 2 5/11/2016 6/17/2016 APPROVED

MRZ-WWTP-02-FN-01 PLANS 2/29/2016 6/17/2016 APPROVED

2 AERATED GRIT AND GREASE REMOVAL UNIT MRZ-WWTP-02-FN-01 SECTIONS-1 2/29/2016 6/17/2016 APPROVED

MRZ-WWTP-02-FN-03 SECTIONS-2 2/29/2016 6/17/2016 APPROVED

3 INLET FLOWMETER CHAMBER MRZ-WWTP-03-FN-01 PLAN & SECTIONS 2/29/2016 4/30/2016 RETURNED 1 5/11/2016 6/21/2016 APPROVED

4 DISTRIBUTION CHAMBER-1 MRZ-WWTP-04-FN-01 PLAN & SECTIONS 2/29/2016 4/30/2016 RETURNED 1 5/11/2016 6/21/2016 APPROVED

MRZ-WWTP-05_07-FN-01 PLANS AT ELEVATION +614,50 2/29/2016 3/30/2016 RETURNED 1 3/31/2016 4/7/2016 APPROVED
HYDRAULIC
UNITS MRZ-WWTP-05_07-FN-02 PLANS AT ELEVATION +616,70 2/29/2016 4/7/2016 APPROVED
5_7 ACTIVATED SLUDGE TANK & 07- DISTRIBUTION CHAMBER-2
MRZ-WWTP-05_07-FN-03 SECTIONS-1 2/29/2016 3/30/2016 RETURNED 1 3/31/2016 4/7/2016 APPROVED

MRZ-WWTP-05_07-FN-04 SECTIONS-2 2/29/2016 3/30/2016 RETURNED 1 3/31/2016 4/7/2016 APPROVED

MRZ-WWTP-08.1-FN-01 PLANS 2/29/2016 3/29/2016 RETURNED 1 4/1/2016 4/7/2016 APPROVED


8.1 SECONDARY CLARIFIER BASIN-1
MRZ-WWTP-08.1-FN-02 SECTIONS 2/29/2016 3/29/2016 RETURNED 1 4/1/2016 4/7/2016 APPROVED

MRZ-WWTP-08.2-FN-01 PLANS 2/29/2016 3/29/2016 RETURNED 1 4/1/2016 4/7/2016 APPROVED


8.2 SECONDARY CLARIFIER BASIN-2
MRZ-WWTP-08.2-FN-02 SECTIONS 2/29/2016 3/29/2016 RETURNED 1 4/1/2016 4/7/2016 APPROVED

9 OUTLET FLOWMETER CHAMBER MRZ-WWTP-09-FN-01 PLAN & SECTIONS 2/29/2016 4/30/2016 RETURNED 1 5/11/2016 6/21/2016 APPROVED

10 UV DISINFECTION STRUCTURE and COLLECTION CHAMBER MRZ-WWTP-10-FN-01 PLAN & SECTIONS 2/29/2016 3/29/2016 RETURNED 1 3/8/2016 4/30/2016 RETURNED 2 5/11/2016

6 BLOWER BUILDING MRZ-WWTP-06-FN-01 PLAN & SECTIONS 2/29/2016 6/17/2016 APPROVED

11 FLOATING SLUDGE PUMPING STATION MRZ-WWTP-11-FN-01 PLAN & SECTIONS 2/29/2016 4/30/2016 RETURNED 1 5/11/2016 6/21/2016 APPROVED

12 RETURN AND EXCESS SLUDGE PUMPING MRZ-WWTP-12-FN-01 PLAN & SECTIONS 2/29/2016 4/30/2016 RETURNED 1 5/11/2016 6/21/2016 APPROVED

MRZ-WWTP-13_17-FN-01 PLANS 2/29/2016 6/21/2016 APPROVED


13_17 GRAVITY SLUDGE THICKENER & 17- SUPERNATANT
MRZ-WWTP-13_17-FN-02 SECTIONS 2/29/2016 6/21/2016 APPROVED

14 AEROBIC SLUDGE DIGESTERS MRZ-WWTP-14-FN-01 PLAN & SECTIONS 2/29/2016

MRZ-WWTP-16_18-FN-01 PLANS 2/29/2016


16_18 SLUDGE DEWATERING BUILDING & SLUDGE STORAGE AREA
MRZ-WWTP-16_18-FN-02 SECTIONS 2/29/2016
BUILDINGS
19 ODOR TREATMENT UNIT MRZ-WWTP-19-FN-01 PLAN & SECTIONS 2/29/2016 1 4/7/2016

21 SERVICE WATER TANK MRZ-WWTP-21-FN-01 PLAN & SECTIONS 2/29/2016

CHANGED IN DESIGN METTING


22 TRANSFORMER BUILDING PLAN and SECTION MRZ-WWTP-22-FN-01 PLAN & SECTIONS 2/29/2016 NO1 1 5/18/2016 6/21/2016 APPROVED

CHANGED IN DESIGN METTING


23 ADMINISTRATION BUILDING MRZ-WWTP-23-FN-01 PLAN & SECTIONS 2/29/2016 NO1 1 5/27/2016 6/20/2016 APPROVED

CHANGED IN DESIGN METTING


24 WORKSHOP BUILDING MRZ-WWTP-24-FN-01 PLAN & SECTIONS 2/29/2016 NO1 1 5/27/2016 6/20/2016 APPROVED

25 GUARD HOUSE MRZ-WWTP-25-FN-01 PLAN & SECTIONS 2/29/2016

28 CREEK REHABILITION TYPE MRZ-WWTP-28-FN-01 TYPE SECTIONS 2/29/2016

12/24/2023
DESIGN STATUS TABLE
FINAL DESIGN ELECTRICAL DRAWINGS 1. SUBMITTAL 1.STATUS 2. SUBMITTAL 2.STATUS 3. SUBMITTAL FINAL STATUS

UNIT NO UNIT NAME DRAWING NO DRAWING NAME DATE DATE COMMENT REV NO DATE DATE COMMENT REV NO DATE DATE COMMENT
SECONDARY CLARIFIER BASIN 1/2 , FLOATING SLUDGE
8-11-12 PUMPING STATION , RETURN AND EXCESS SLUDGE MRZ-WWTP-08_11_12-EE-01 EARTHING PLAN 5/17/2016 1 6/24/2016
PUMPING
CHANGED IN
5 ACTIVATED SLUDGE TANK MRZ-WWTP-05-EE-01 EARTHING PLAN 5/2/2016 05.05.2016 1 5/6/2016 2 6/24/2016
MEETING
1 01-PRETREATMENT UNIT EARTING PLAN MRZ-WWTP-01-EE-01 EARTHING PLAN 6/17/2016 1 6/24/2016
HYDRAULIC 13 13-GRAVITY SLUDGE THICKENER MRZ-WWTP-13_17-EE-01 EARTHING PLAN 6/24/2016
UNITS

ADP TEK HAT ŞEMASI / MDP MRZ-WWTP-00-EE-01 SINGLE LINE DIAGRAM 2/29/2016 31.03.2016 RETURNED 1 4/21/2016 5/3/2016 APPROVED

MCC1, MCC2, MCC3 TEK HAT ŞEMASI / MCC1,MCC2.MCC3 MRZ-WWTP-00-EE-02 SINGLE LINE DIAGRAM 2/29/2016 31.03.2016 RETURNED 1 4/21/2016 5/3/2016 APPROVED

BUILDINGS

12/24/2023
DESIGN STATUS TABLE
APPROVED BY
FINAL DESIGN - ARCHITECTURAL DRAWINGS 1. SUBMITTAL 1. STATUS 2. SUBMITTAL 2.STATUS 3. SUBMITTAL ENGINEER
UNIT NO UNIT NAME DRAWING NO DRAWING NAME DATE DATE COMMENT REV NO DATE DATE COMMENT REV NO DATE DATE

BUILDINGS

HYDRAULIC UNITS
DESIGN STATUS TABLE

1. SUBMITTAL 1.STATUS 2. SUBMITTAL 2.STATUS 3. FINAL STATUS


FINAL DESIGN - SANITARY DRAWINGS
SUBMITTAL
UNIT NO UNIT NAME DRAWING NO DRAWING NAME DATE DATE COMMENT REV NO DATE DATE COMMENT REV NO DATE REV NO DATE

HYDRAULIC
UNITS

12/24/2023
DESIGN STATUS TABLE
FINAL DESIGN - HEATING DRAWINGS 1. SUBMITTAL 1.STATUS 2. SUBMITTAL 2.STATUS 3. SUBMITTAL FINAL STATUS

UNIT NO UNIT NAME DRAWING NO DRAWING NAME DATE DATE COMMENT REV NO DATE DATE COMMENT REV NO DATE DATE COMMENT

BUILDINGS

HYDRAULIC
UNITS

12/24/2023
DESIGN STATUS TABLE
FINAL DESIGN - COOLING DRAWINGS 1. SUBMITTAL 1.STATUS 2. SUBMITTAL 2.STATUS 3. SUBMITTAL FINAL STATUS

UNIT
UNIT NAME DRAWING NO DRAWING NAME DATE DATE COMMENT REV NO DATE DATE COMMENT REV NO DATE DATE COMMENT
NO

11.09.201

BUILDINGS

HYDRAULIC
UNITS

12/24/2023
DESIGN STATUS TABLE
APPROVED BY
FINAL DESIGN - MECHANICAL DRAWINGS 1. SUBMITTAL 1. STATUS 2. SUBMITTAL 2.STATUS 3. SUBMITTAL
ENGINEER

UNIT NO UNIT NAME DRAWING NO DRAWING NAME DATE DATE COMMENT REV NO DATE DATE COMMENT REV NO DATE DATE

BUILDINGS

HYDRAULIC
UNITS

12/24/2023