You are on page 1of 10

Drawing Master List

Project : MENAIKTARAF JAMBATAN SULTAN HAJI AHMAD SHAH (DARIPADA 2 LORONG KEPADA 4 LORONG) Date of Received
Contract No. : JKR/IP/CKUB/146/2020 Date 9 30
Month 9 9
Year 2020 2020

No. Drawing No. Drawing Title Construction / Shop Drawings

GENERAL
1 KPKR/J/R/03/19/6/AM 1 LIST OF DRAWINGS (SHEET 1 OF 6) REV 0
2 KPKR/J/R/03/19/6/AM 2 LIST OF DRAWINGS (SHEET 2 OF 6) REV 0
3 KPKR/J/R/03/19/6/AM 3 LIST OF DRAWINGS (SHEET 3 OF 6) REV 0
4 KPKR/J/R/03/19/6/AM 4 LIST OF DRAWINGS (SHEET 4 OF 6) REV 0
5 KPKR/J/R/03/19/6/AM 5 LIST OF DRAWINGS (SHEET 5 OF 6) REV 0
6 KPKR/J/R/03/19/6/AM 6 LIST OF DRAWINGS (SHEET 6 OF 6) REV 0

STANDARD DRAWINGS
7 JKR/CA/P-PTB1M/30/PEL16/003/01B PLAN & TAMPAK HADAPAN REV 0
8 JKR/CA/P-PTB1M/30/PEL16/003/02B KERATAN & BUTIRAN REV 0
9 JKR/CA/P-PTB1M/30/PEL16/003/03B SKEMA WARNA PAPAN TANDA REV 0
10 JKR/CA/P-PTB1M/30/PEL16/003/07A PLAN & TAMPAK HADAPAN REV 0
11 JKR/CA/P-PTB1M/30/PEL16/003/08A KERATAN & BUTIRAN REV 0
12 JKR/CA/P-PTB1M/30/PEL16/003/09A SKEMA WARNA PAPAN TANDA REV 0
13 KPKR/J/R/03/19/6/AM6 SITE OFFICE - CATEGORY 2 & 3 REV 0
14 KPKR/J/R/STD/AM 113 STANDARD ABBREVIATIONS & LEGENDS REV 0
15 KPKR/J/R/STD/AM 114 ELEMENTS OF CURVES REV 0
16 KPKR/J/R/STD/AM 115 SUPERELEVATION DETAILS REV 0
17 KPKR/J/R/STD/AM 117 REGULATION AND TREATMENT OF EXISTING PAVEMENT REV 0
18 KPKR/J/R/STD/AM 201 TRAFFIC SIGN - GENERAL ARRANGEMENT REV 0
19 KPKR/J/R/STD/AM 202 TRAFFIC SIGN - STRUCTURAL DETAILS REV 0
20 KPKR/J/R/STD/AM 203 STANDARD TRAFFIC SIGN REV 0
21 KPKR/J/R/03/19/6/AM 204 STANDARD TEMPORARY SIGN REV 0
22 KPKR/J/R/STD/AM 206 APPLICATION OF STANDARD TEMPORARY SIGN 1 REV 0
23 KPKR/J/R/STD/AM 206A (1) APPLICATION OF STANDARD TEMPORARY SIGN 1 REV 0
24 KPKR/J/R/STD/AM 206A (2) APPLICATION OF STANDARD TEMPORARY SIGN 1 REV 0
25 KPKR/J/R/STD/AM 207A (1) APPLICATION OF STANDARD TEMPORARY SIGN 2 REV 0
26 KPKR/J/R/STD/AM 207A (2) APPLICATION OF STANDARD TEMPORARY SIGN 2 REV 0
27 KPKR/J/R/STD/AM 208A (1) APPLICATION OF STANDARD TEMPORARY SIGN 3 REV 0
28 KPKR/J/R/STD/AM 208A (2) APPLICATION OF STANDARD TEMPORARY SIGN 3 REV 0
29 KPKR/J/R/STD/AM 209A (1) APPLICATION OF STANDARD TEMPORARY SIGN 4 REV 0
30 KPKR/J/R/STD/AM 209A (2) APPLICATION OF STANDARD TEMPORARY SIGN 4 REV 0
31 KPKR/J/R/03/19/6/AM 210A (1) DIRECTIONAL SIGNBOARD DETAILS (SHEET 1 OF 2) REV 0
32 KPKR/J/R/03/19/6/AM 210A (2) DIRECTIONAL SIGNBOARD DETAILS (SHEET 2 OF 2) REV 0
33 JKR/CKAS/04/P-PTB1M/30/PD/1 PELAN PENAPAK KONKRIT REV 0
34 JKR/CKAS/04/P-PTB1M/30/DK/1 PANDANGAN HADAPAN KERANGKA UTAMA REV 0
35 JKR/CKAS/04/P-PTB1M/30/PEL/1 PELAN BASE PLATE REV 0
Drawing Master List
Project : MENAIKTARAF JAMBATAN SULTAN HAJI AHMAD SHAH (DARIPADA 2 LORONG KEPADA 4 LORONG) Date of Received
Contract No. : JKR/IP/CKUB/146/2020 Date 9 30
Month 9 9
Year 2020 2020

No. Drawing No. Drawing Title Construction / Shop Drawings

DRAINAGE WORKS
36 KPKR/J/R/STD/AM 301-1A TYPICAL ROAD DRAINS (RURAL) REV 0
37 KPKR/J/R/STD/AM 301-1B TYPICAL ROAD DRAINS (RURAL) REV 0
38 KPKR/J/R/STD/AM 301-1C TYPICAL ROAD DRAINS (RURAL) REV 0
39 KPKR/J/R/STD/AM 301-1D TYPICAL ROAD DRAINS (RURAL) REV 0
40 KPKR/J/R/STD/AM 301-1E TYPICAL ROAD DRAINS (RURAL) REV 0
41 KPKR/J/R/STD/AM 301-1F TYPICAL ROAD DRAINS (RURAL) REV 0
42 KPKR/J/R/STD/AM 301-1G TYPICAL CONCRETE BLOCK DRAIN REV 0
43 KPKR/J/R/STD/AM 302-1 TYPICAL ROAD DRAINS (PRECAST CONCRETE U-DRAIN) REV 0
44 KPKR/J/R/STD/AM 303-1 SUMP FOR ROADSIDE DRAIN AND JUNCTION BOX REV 0
45 KPKR/J/R/STD/AM 304-1 TYPICAL MEDIAN SUMP (RURAL) REV 0
46 KPKR/J/R/STD/AM 305-1A TYPICAL OUTFALL DRAINS REV 0
47 KPKR/J/R/STD/AM 305-1B TYPICAL OUTFALL DRAINS REV 0
48 KPKR/J/R/STD/AM 306-1 TYPICAL CONCEALED ROADSIDE DRAIN IN MAJOR HIGHWAY REV 0
49 KPKR/J/R/STD/AM 307-1A TYPICAL SUMPS WITH CASCADING DRAIN IN CUT SECTION REV 0
50 KPKR/J/R/STD/AM 307-1B TYPICAL SUMPS WITH CASCADING DRAIN IN CUT SECTION REV 0
51 KPKR/J/R/STD/AM 307-1C TYPICAL SUMPS WITH CASCADING DRAIN IN CUT SECTION REV 0
52 KPKR/J/R/STD/AM 308-1 TYPICAL SUMPS WITH PC BLOCK CASCADING DRAIN IN FILL SECTION REV 0
53 KPKR/J/R/STD/AM 302-1 ROADSIDE DRAINAGE FOR URBAN AREA REV 0
54 KPKR/J/R/STD/AM 309-1B ROADSIDE DRAINAGE FOR URBAN AREA REV 0
55 KPKR/J/R/STD/AM 310-1A MEDIAN DRAINAGE FOR URBAN AREA REV 0
56 KPKR/J/R/STD/AM 310-1B MEDIAN DRAINAGE FOR URBAN AREA REV 0
57 KPKR/J/R/STD/AM 310-1C MEDIAN DRAINAGE FOR URBAN AREA REV 0
58 KPKR/J/R/STD/AM 311-1A TYPICAL SUMPS IN URBAN AREA REV 0
59 KPKR/J/R/STD/AM 311-1B TYPICAL SUMPS IN URBAN AREA REV 0
60 KPKR/J/R/STD/AM 311-1C TYPICAL SUMPS IN URBAN AREA REV 0
61 KPKR/J/R/STD/AM 312-1 GALVANISED MS.GRATING & CAST IRON (G.I) GULLY GRATE REV 0
62 KPKR/J/R/STD/AM 313-1 CULVERT SCHEDULE REV 0
63 KPKR/J/R/STD/AM 314-1 BEDDING TYPES FOR R.C PIPE CULVERT REV 0
64 KPKR/J/R/STD/AM 315-1A R.C. PIPE CULVERT (BUTT OR REBATED JOINT) REV 0
65 KPKR/J/R/STD/AM 315-1B R.C. PIPE CULVERT (BUTT OR REBATED JOINT) REV 0
66 KPKR/J/R/STD/AM 316-1A R.C. PIPE CULVERT (SPIGOT JOINT & SOCKET JOINT) REV 0
67 KPKR/J/R/STD/AM 316-1B R.C. PIPE CULVERT (SPIGOT JOINT & SOCKET JOINT) 2 REV 0
68 KPKR/J/R/STD/AM 317-1 TYPICAL EXTENSION DETAILS FOR R.C. PIPE CULVERT REV 0
69 KPKR/J/R/STD/AM 318-1A STANDARD SINGLE BOX CULVERT - CULVERT DETAILS REV 0
70 KPKR/J/R/STD/AM 318-1B STANDARD SINGLE BOX CULVERT - CULVERT DETAILS REV 0
71 KPKR/J/R/STD/AM 319-1A STANDARD SINGLE BOX CULVERT - WINGWALL DETAILS REV 0
Drawing Master List
Project : MENAIKTARAF JAMBATAN SULTAN HAJI AHMAD SHAH (DARIPADA 2 LORONG KEPADA 4 LORONG) Date of Received
Contract No. : JKR/IP/CKUB/146/2020 Date 9 30
Month 9 9
Year 2020 2020

No. Drawing No. Drawing Title Construction / Shop Drawings


72 KPKR/J/R/STD/AM 319-1B STANDARD SINGLE BOX CULVERT - WINGWALL DETAILS REV 0
73 KPKR/J/R/STD/AM 320-1A STANDARD TWIN BOX CULVERT - CULVERT DETAILS REV 0
74 KPKR/J/R/STD/AM 320-1B Rev.01 STANDARD TWIN BOX CULVERT - CULVERT DETAILS REV 0
75 KPKR/J/R/STD/AM 321-1A STANDARD TWIN BOX CULVERT - WINGWALL DETAILS REV 0
76 KPKR/J/R/STD/AM 321-1B Rev.01 STANDARD TWIN BOX CULVERT - WINGWALL DETAILS REV 0
77 KPKR/J/R/STD/AM 322-1A STANDARD TRIPLE BOX CULVERT - CULVERT DETAILS REV 0
78 KPKR/J/R/STD/AM 322-1B STANDARD TRIPLE BOX CULVERT - CULVERT DETAILS REV 0
79 KPKR/J/R/STD/AM 323-1A STANDARD TRIPLE BOX CULVERT - WINGWALL DETAILS REV 0
80 KPKR/J/R/STD/AM 323-1B STANDARD TRIPLE BOX CULVERT - WINGWALL DETAILS REV 0
81 KPKR/J/LB/06/16/276/AM 15 DETAILS OF CULVERT OUTLET TYPE 1 AND 2 REV 0
82 KPKR/J/LB/06/16/276/AM 16 DETAILS OF CULVERT INTLET TYPE 1 AND 2 REV 0

ROAD FURNITURE
83 KPKR/J/R/STD/AM 601 - 1A STANDARD ROAD MARKINGS 1 REV 0
84 KPKR/J/R/STD/AM 601 - 1B STANDARD ROAD MARKINGS 1 REV 0
85 KPKR/J/R/STD/AM 601 - 1C STANDARD ROAD MARKINGS 1 REV 0
86 KPKR/J/R/STD/AM 601 - 1D STANDARD ROAD MARKINGS 1 REV 0
87 KPKR/J/R/STD/AM 601 - 1E STANDARD ROAD MARKINGS REV 0
88 KPKR/J/R/STD/AM 601 - 2 APPLICATIONS OF PAVEMENT MARKINGS REV 0
89 KPKR/J/R/STD/AM 602 - 1 TYPICAL PARKING SPACE REV 0
90 KPKR/J/R/STD/AM 603 - 1 STANDARD ROAD HUMPS REV 0
91 KPKR/J/R/STD/AM 604 - 1 ANTI-GLARE SCREEN REV 0
92 KPKR/J/R/STD/AM 604 - 2 PEDESTRIAN FENCING AND HANDRAIL DETAILS REV 0
93 KPKR/J/R/STD/AM 604 - 3 SLIDING GATE AND CHAIN LINK FENCING REV 0
94 KPKR/J/R/STD/AM 606 - 5 THRIE BEAM GUARDRAIL DETAILS REV 0
95 KPKR/J/R/STD/AM 605 - 1 NEW JERSY BARRIER - HEIGHT 810mm REV 0
96 KPKR/J/R/STD/AM 605 - 2 NEW JERSY BARRIER - HEIGHT 1070mm REV 0
97 KPKR/J/R/STD/AM 606 - 1A STANDARD GUARDRAIL - GENERAL ARRANGEMENT REV 0
98 KPKR/J/R/STD/AM 606 - 1B STANDARD GUARDRAIL - GENERAL ARRANGEMENT REV 0
99 KPKR/J/R/STD/AM 606 - 2A DEFLECTIONS FOR LONGITUDINAL BARRIERS REV 0
100 KPKR/J/R/STD/AM 606 - 2B TYPICAL GUARDRAIL DETIALS FOR TERMINAL UNIT TYPE 2 REV 0
101 KPKR/J/R/STD/AM 606 - 3 TYPICAL GUARDRAIL DETIALS FOR TERMINAL UNIT TYPE 3 & TYP 4 REV 0
102 KPKR/J/R/STD/AM 604 - 4 TREATMENT OF GUARDRAIL TRANSITION AND OTHER DETAILS REV 0
103 KPKR/J/R/STD/AM 607 - 1 KILOMETER POST TYPE A REV 0
104 KPKR/J/R/STD/AM 607 - 2 KILOMETER POST TYPE B REV 0
105 KPKR/J/R/STD/AM 608 - 1 SUBSTANDARD CURVE LAYOUT FOR SIGNS & LANE MARKING REV 0
106 KPKR/J/R/STD/AM 609 - 1 SUBSTANDARD CURVE RETRO-REFLECTIVE PAVEMENT MARKING (RRPM) REV 0
107 KPKR/J/R/STD/AM 610 - 1 DELINEATORS - CHEVRON DELINEATORS REV 0
Drawing Master List
Project : MENAIKTARAF JAMBATAN SULTAN HAJI AHMAD SHAH (DARIPADA 2 LORONG KEPADA 4 LORONG) Date of Received
Contract No. : JKR/IP/CKUB/146/2020 Date 9 30
Month 9 9
Year 2020 2020

No. Drawing No. Drawing Title Construction / Shop Drawings


108 KPKR/J/R/STD/AM 610 - 2 DELINEATORS ON POST/GUARDRAIL & POST DELINEATORS REV 0
109 KPKR/J/R/STD/AM 611 - 1 DANGEROUS CURVE - STANDARD TRAFFIC SIGN & ROAD MARKING REV 0
110 KPKR/J/R/STD/AM 612 - 1A ROAD KERB DETAILS REV 0
111 KPKR/J/R/STD/AM 612 - 1B ROAD KERB DETAILS REV 0
112 KPKR/J/R/03/19/6/AM 613 TRANSITION FROM GUARDRAIL TO BRIGE PARAPET/RAILING DETAILS REV 0
113 KPKR/J/R/03/19/6/AM 614 R.O.W MARKER DETAILS REV 0
114 KPKR/J/R/03/19/6/AM 615 TYPICAL BUS LAY-BY LAYOUT & PAVEMENT DETAILS REV 0
115 KPKR/J/R/03/19/6/AM 616 BUS STOP DETAILS REV 0

ENVIRONMENTAL PROTECTION WORKS


116 CAST/IC/1 INSTRUCTION TO CONTRACTORS ON DISPOSAL OF SURPLUS CUT MATERIAL REV 0
117 CAST/CB/1 CONTAINMENT BUND FOR SKID TANK REV 0
118 CAST/ST/1 SILT TRAPS REV 0
119 CAST/WT/1 WASH TROUGH FOR CONSTRUCTION SITE AT (RURAL AREA) REV 0
120 CAST/WT/2 WASH TROUGH FOR CONSTRUCTION SITE AT (URBAN AREA) REV 0
121 CAST/SF/1 SILT FENCE REV 0
122 CAST/CD/1 CHECK DAM REV 0
123 CAST/SS/1 SCHEDULE WASTE STORAGE SHED REV 0
124 CAST/DC/1 DISPOSAL OF SUITABLE CUT MATERIALS REV 0
125 CAST/SC/1 SILT CURTAIN REV 0
126 CAST/DE/1 UNSUITABLE MATERIAL DISPOSAL EMBANKMENT REV 0

ALIGNMENT CONTROL PLAN


127 KPKR/J/R/03/9/6/KB1 ALIGNMENT CONTROL PLAN FROM CH. 0.00m - CH. 1400.00m REV 0
128 KPKR/J/R/03/9/6/KB2 ALIGNMENT CONTROL PLAN FROM CH.1400.00m - CH. 2000.00m REV 0
129 KPKR/J/R/03/9/6/KB3 ALIGNMENT CONTROL PLAN FROM CH. 625.00m - CH. 1688.00m REV 0

PLAN & LONGITUDINAL PROFILE


130 KPKR/J/R/03/9/6/KB4 PLAN AND LONGITUDINAL PROFILE FROM CH. 0.00m - CH. 700.00m REV 0 REV 1
131 KPKR/J/R/03/9/6/KB5 PLAN AND LONGITUDINAL PROFILE FROM CH. 700.00m - CH. 1400.00m REV 0 REV 1
PLAN AND LONGITUDINAL PROFILE ALIGNMENT JAMBATAN BARU FROM CH.
KPKR/J/R/03/9/6/KB6 REV 0 REV 1
132 700.00m - CH. 1400.00m
133 KPKR/J/R/03/9/6/KB7 PLAN AND LONGITUDINAL PROFILE FROM CH. 1400.00m - CH. 2000.00m REV 0 REV 1
PLAN AND LONGITUDINAL PROFILE ALIGNMENT JAMBATAN LAMA FROM CH.
KPKR/J/R/03/9/6/KB8 REV 0 REV 1
134 625.00m - CH. 1325.00m
PLAN AND LONGITUDINAL PROFILE ALIGNMENT JAMBATAN LAMA FROM CH.
KPKR/J/R/03/9/6/KB9 REV 0 REV 1
135 625.00m - CH. 1325.00m
PLAN AND LONGITUDINAL PROFILE ALIGNMENT JAMBATAN LAMA FROM CH.
KPKR/J/R/03/9/6/KB10 REV 0 REV 1
136 1325.00m - CH. 1688.00m
Drawing Master List
Project : MENAIKTARAF JAMBATAN SULTAN HAJI AHMAD SHAH (DARIPADA 2 LORONG KEPADA 4 LORONG) Date of Received
Contract No. : JKR/IP/CKUB/146/2020 Date 9 30
Month 9 9
Year 2020 2020

No. Drawing No. Drawing Title Construction / Shop Drawings


PLAN AND LONGITUDINAL PROFILE ALIGNMENT JAMBATAN LAMA FROM CH.
KPKR/J/R/03/9/6/KB11 REV 0 REV 1
137 1325.00m - CH. 1688.00m

TYPICAL CROSS SECTION


138 KPKR/J/R/03/19/6/KL 1A TYPICAL CROSS SECTION REV 0
139 KPKR/J/R/03/19/6/KL 1B CROSS SECTION FROM (CH. 0.00 - CH. 175.00) REV 0
140 KPKR/J/R/03/19/6/KL 2 CROSS SECTION FROM (CH. 200.00 - CH. 375.00) REV 0
141 KPKR/J/R/03/19/6/KL 3 CROSS SECTION FROM (CH. 400.00 - CH. 575.00) REV 0
142 KPKR/J/R/03/19/6/KL 4 CROSS SECTION FROM (CH. 600.00 - CH. 775.00) REV 0
143 KPKR/J/R/03/19/6/KL 5 CROSS SECTION FROM (CH. 800.00 - CH. 975.00) REV 0
144 KPKR/J/R/03/19/6/KL 6 CROSS SECTION FROM (CH. 1000.00 - CH. 1175.00) REV 0
145 KPKR/J/R/03/19/6/KL 7 CROSS SECTION FROM (CH. 1100.00 - CH. 1175.00) REV 0
146 KPKR/J/R/03/19/6/KL 8 CROSS SECTION FROM (CH. 1200.00 - CH. 1275.00) REV 0
147 KPKR/J/R/03/19/6/KL 9 CROSS SECTION FROM (CH. 1300.00 - CH. 1425.00) REV 0
148 KPKR/J/R/03/19/6/KL 10 CROSS SECTION FROM (CH. 1450.00 - CH. 1575.00) REV 0
149 KPKR/J/R/03/19/6/KL 11 CROSS SECTION FROM (CH. 1600.00 - CH. 1775.00) REV 0
150 KPKR/J/R/03/19/6/KL 12 CROSS SECTION FROM (CH. 1800.00 - CH. 1925.00) REV 0
151 KPKR/J/R/03/19/6/KL 13 CROSS SECTION FROM (CH. 1950.00 - CH. 2000.00) REV 0

JUNCTION
152 KPKR/J/R/03/19/6/LP 1A JUNCTION 1 & 2 - GENERAL LAYOUT REV 0
153 KPKR/J/R/03/19/6/LP 1B JUNCTION 1 & 2 - SETTING OUT REV 0
154 KPKR/J/R/03/19/6/LP 1C JUNCTION 1 & 2 - PAVEMENT SUPERELEVATION REV 0
155 KPKR/J/R/03/19/6/LP 1D JUNCTION 1 & 2 - ROAD MARKING, TRAFFIC SIGNS & TRAFFIC SIGNAL REV 0
156 KPKR/J/R/03/19/6/LP 2A JUNCTION 3 - GENERAL LAYOUT REV 0
157 KPKR/J/R/03/19/6/LP 2B JUNCTION 3 - SETTING OUT REV 0
158 KPKR/J/R/03/19/6/LP 2C JUNCTION 3 - PAVEMENT SUPERELEVATION REV 0
159 KPKR/J/R/03/19/6/LP 2D JUNCTION 3 - ROAD MARKING, TRAFFIC SIGNS & TRAFFIC SIGNAL REV 0
160 KPKR/J/R/03/19/6/LP 3A JUNCTION 4 - GENERAL LAYOUT REV 0
161 KPKR/J/R/03/19/6/LP 3B JUNCTION 4 - SETTING OUT REV 0
162 KPKR/J/R/03/19/6/LP 3C JUNCTION 4 - PAVEMENT SUPERELEVATION REV 0
163 KPKR/J/R/03/19/6/LP 3D JUNCTION 4 - ROAD MARKING, TRAFFIC SIGNS & TRAFFIC SIGNAL REV 0

ROAD MARKING & SIGNAGES


ROAD FURNITURE AND MARKING LAYOUT PLAN FROM (CH. 00.00 - CH.
164 KPKR/J/R/03/19/6/KT/RM 1 REV 0
1400.00)
ROAD FURNITURE AND MARKING LAYOUT PLAN FROM (CH. 1400.00 - CH.
165 KPKR/J/R/03/19/6/KT/RM 2 REV 0
2000.00)
Drawing Master List
Project : MENAIKTARAF JAMBATAN SULTAN HAJI AHMAD SHAH (DARIPADA 2 LORONG KEPADA 4 LORONG) Date of Received
Contract No. : JKR/IP/CKUB/146/2020 Date 9 30
Month 9 9
Year 2020 2020

No. Drawing No. Drawing Title Construction / Shop Drawings


TRAFFIC MANAGEMENT PLAN
166 KPKR/J/R/03/19/6/TC 1 GENERAL NOTES
SIGN ARRANGEMENT - LANE CLOSURE ON SLOW LANE OF DUAL
167 KPKR/J/R/03/19/6/TC 2 REV 0
CARRIAGEWAY
SIGN ARRANGEMENT - LANE CLOSURE ON FAST LANE OF DUAL
168 KPKR/J/R/03/19/6/TC 3 REV 0
CARRIAGEWAY
169 KPKR/J/R/03/19/6/TC 4 TRAFFIC MANAGEMENT PLAN STAGE 1 & 2 (CH. 0.00 - CH. 700.00) REV 0
170 KPKR/J/R/03/19/6/TC 5 TRAFFIC MANAGEMENT PLAN STAGE 3 (CH. 0.00 - CH. 700.00) REV 0
171 KPKR/J/R/03/19/6/TC 6 TRAFFIC MANAGEMENT PLAN STAGE 1 & 2 (CH. 700.00 - CH. 1400.00) REV 0
172 KPKR/J/R/03/19/6/TC 7 TRAFFIC MANAGEMENT PLAN STAGE 3 (CH. 700.00 - CH. 1400.00) REV 0
173 KPKR/J/R/03/19/6/TC 8 TRAFFIC MANAGEMENT PLAN STAGE 1 & 2 (CH. 1400.00 - CH. 2000.00) REV 0
174 KPKR/J/R/03/19/6/TC 9 TRAFFIC MANAGEMENT PLAN STAGE 3 (CH. 1400.00 - CH. 2000.00) REV 0

DRAINAGE & CULVERT


175 KPKR/J/R/03/19/6/PP 1 DRAINAGE PLAN & PROFILE (CH. 0.00 - CH. 700.00) REV 0
176 KPKR/J/R/03/19/6/PP 2 DRAINAGE PLAN & PROFILE (CH. 700.00 - CH. 1400.00) REV 0
177 KPKR/J/R/03/19/6/PP 3 DRAINAGE PLAN & PROFILE (CH. 700.00m - CH. 1400.00m) REV 0
178 KPKR/J/R/03/19/6/PP 4 DRAINAGE PLAN & PROFILE (CH. 1400.00 - CH. 2000.00) REV 0
179 KPKR/J/R/03/19/6/PP 5 CULVERT SCHEDULE REV 0

ENVIRONMENT PROTECTION WORK


180 KPKR/J/R/03/19/6/AS 1 ENVIRONMENTAL PROTECTION PLAN STAGE 1 & 2 (CH. 0.00 - CH. 700.00) REV 0
181 KPKR/J/R/03/19/6/AS 2 ENVIRONMENTAL PROTECTION PLAN STAGE 3 (CH. 0.00 - CH. 700.00) REV 0
182 KPKR/J/R/03/19/6/AS 3 REV 0
ENVIRONMENTAL PROTECTION PLAN STAGE 1 & 2 (CH. 700.00 - CH. 1400.00)
183 KPKR/J/R/03/19/6/AS 4 ENVIRONMENTAL PROTECTION PLAN STAGE 3 (CH. 700.00 - CH. 1400.00) REV 0
ENVIRONMENTAL PROTECTION PLAN STAGE 1 & 2 (CH. 1400.00 - CH.
184 KPKR/J/R/03/19/6/AS 5 REV 0
2000.00)
185 KPKR/J/R/03/19/6/AS 6 ENVIRONMENTAL PROTECTION PLAN STAGE 3 (CH. 1400.00 - CH. 2000.00) REV 0

GEOTECHNICAL WORKS
186 KPKR/J/R/03/19/6-GEO 01 LOCATION OF PROPOSED GEOTECHNICAL TREATMENT (SHEET 1 OF 5) REV 0
187 KPKR/J/R/03/19/6-GEO 02 LOCATION OF PROPOSED GEOTECHNICAL TREATMENT (SHEET 2 OF 5) REV 0
188 KPKR/J/R/03/19/6-GEO 03 LOCATION OF PROPOSED GEOTECHNICAL TREATMENT (SHEET 3 OF 5) REV 0
189 KPKR/J/R/03/19/6-GEO 04 LOCATION OF PROPOSED GEOTECHNICAL TREATMENT (SHEET 4 OF 5) REV 0
190 KPKR/J/R/03/19/6-GEO 05 LOCATION OF PROPOSED GEOTECHNICAL TREATMENT (SHEET 5 OF 5) REV 0
GENERAL NOTES FOR NON-WOVEN GEOTEXTILE, WOVEN GEOTEXTILE &
191 KPKR/J/R/03/19/6-GEO 06 REV 0
GEOGRID
Drawing Master List
Project : MENAIKTARAF JAMBATAN SULTAN HAJI AHMAD SHAH (DARIPADA 2 LORONG KEPADA 4 LORONG) Date of Received
Contract No. : JKR/IP/CKUB/146/2020 Date 9 30
Month 9 9
Year 2020 2020

No. Drawing No. Drawing Title Construction / Shop Drawings


192 KPKR/J/R/03/19/6-GEO 07 TYPICAL DETAIL OF GROUND TREATMENT (SHEET 1 OF 2) REV 0
193 KPKR/J/R/03/19/6-GEO 08 TYPICAL DETAIL OF GROUND TREATMENT (SHEET 2 OF 2) REV 0
194 KPKR/J/R/03/19/6-GEO 09 TYPICAL DETAIL OF KEYSTONE WALL REV 0
195 KPKR/J/R/03/19/6-GEO 10 TYPICAL DETAIL OF GABION WALL REV 0
196 KPKR/J/R/03/19/6-GEO 11 TYPICAL DETAIL OF RUBBER WALL REV 0
197 KPKR/J/R/03/19/6-GEO 12 TYPICAL DETAIL OF HORIZONTAL DRAIN REV 0
198 KPKR/J/R/03/19/6-GEO 13 TYPICAL DETAIL OF INSTRUMENTATION REV 0

BRIDGE STRUCTURE
STANDARD DRAWING
199 KPKR/J/R/03/19/6/STD 01 GENERAL NOTES 1 REV 0
200 KPKR/J/R/03/19/6/STD 02 GENERAL NOTES 2 REV 0
201 KPKR/J/R/03/19/6/STD 03 GENERAL NOTES 3 REV 0
202 KPKR/J/R/03/19/6/STD 04 STANDARD ROAD PAVEMENT & GABION MATTRESS REV 0
203 KPKR/J/R/03/19/6/STD 05 STANDARD PRECAST PARAPET REV 0
204 KPKR/J/R/03/19/6/STD 06 BRASS PLAQUE REV 0

STRUCTURE DRAWING
205 KPKR/J/R/03/19/6/ST 01 BRIDGE ALIGNMENT SETTING OUT REV 0
206 KPKR/J/R/03/19/6/ST 02 GENERAL ARRANGEMENT 1 REV 0
207 KPKR/J/R/03/19/6/ST 03 GENERAL ARRANGEMENT 2 REV 0
208 KPKR/J/R/03/19/6/ST 04 PILING LAYOUT PLAN 1 REV 0
209 KPKR/J/R/03/19/6/ST 05 PILING LAYOUT PLAN 2 REV 0
210 KPKR/J/R/03/19/6/ST 06 1200mm DIAMETER BOREPILES REV 0
211 KPKR/J/R/03/19/6/ST 07 1500mm DIAMETER BOREPILES REV 0
212 KPKR/J/R/03/19/6/ST 08 PILE CAP CONCRETE DETAILS OF PIER 2, 5 REV 0
213 KPKR/J/R/03/19/6/ST 09 PILE CAP CONCRETE DETAILS OF PIER 1, 6-11 REV 0
214 KPKR/J/R/03/19/6/ST 10 PILE CAP CONCRETE DETAILS OF PIER 3, 4 REV 0
215 KPKR/J/R/03/19/6/ST 11 PILE CAP REINFORCEMENT DETAILS OF PIER 2, 5 REV 0
216 KPKR/J/R/03/19/6/ST 12 PILE CAP REINFORCEMENT DETAILS OF PIER 1, 6-11 REV 0
217 KPKR/J/R/03/19/6/ST 13 PILE CAP REINFORCEMENT DETAILS OF PIER 3,4 REV 0
218 KPKR/J/R/03/19/6/ST 14 ABUTMENT A - CONCRETE DETAILS REV 0
219 KPKR/J/R/03/19/6/ST 15 ABUTMENT A - REINFORCEMENT DETAILS REV 0
220 KPKR/J/R/03/19/6/ST 16 ABUTMENT B - CONCRETE DETAILS REV 0
221 KPKR/J/R/03/19/6/ST 17 ABUTMENT B - REINFORCEMENT DETAILS REV 0
222 KPKR/J/R/03/19/6/ST 18 PIER 1,6,7,8,9, 10 & 11 - CONCRETE DETAILS REV 0
223 KPKR/J/R/03/19/6/ST 19 PIER 1,6,7,8,9, 10 & 11 - REINFORCEMENT DETAILS REV 0
224 KPKR/J/R/03/19/6/ST 20 PIER 2 & 5 - CONCRETE DETAILS REV 0
Drawing Master List
Project : MENAIKTARAF JAMBATAN SULTAN HAJI AHMAD SHAH (DARIPADA 2 LORONG KEPADA 4 LORONG) Date of Received
Contract No. : JKR/IP/CKUB/146/2020 Date 9 30
Month 9 9
Year 2020 2020

No. Drawing No. Drawing Title Construction / Shop Drawings


225 KPKR/J/R/03/19/6/ST 21 PIER 2 & 5 - REINFORCEMENT DETAILS REV 0
226 KPKR/J/R/03/19/6/ST 22 PIER 3 & 4 - CONCRETE DETAILS REV 0
227 KPKR/J/R/03/19/6/ST 23 PIER 3 & 4 - REINFORCEMENT DETAILS REV 0
228 KPKR/J/R/03/19/6/ST 24 BEARING & EXPANSION JOINT LAYOUT REV 0
229 KPKR/J/R/03/19/6/ST 25 MECHANICAL POT BEARING DETAIL REV 0
230 KPKR/J/R/03/19/6/ST 26 EXPANSION JOINT DETAIL REV 0
231 KPKR/J/R/03/19/6/ST 27 TEMPORARY WORK LAYOUT 1 REV 0
232 KPKR/J/R/03/19/6/ST 28 TEMPORARY WORK LAYOUT 2 REV 0
233 KPKR/J/R/03/19/6/ST 29 TEMPORARY WORK LAYOUT 3 REV 0
234 KPKR/J/R/03/19/6/ST 30 SOIL INVESTIGATION DETAILS (BH1 - BH2) REV 0
235 KPKR/J/R/03/19/6/ST 31 SOIL INVESTIGATION DETAILS (BH3 - BH4) REV 0
236 KPKR/J/R/03/19/6/ST 32 SOIL INVESTIGATION DETAILS (BH5 - BH6) REV 0
237 KPKR/J/R/03/19/6/ST 33 SOIL INVESTIGATION DETAILS (BH7 - BH8) REV 0
238 KPKR/J/R/03/19/6/ST 34 SOIL INVESTIGATION DETAILS (BH9 - BH10) REV 0
239 KPKR/J/R/03/19/6/ST 35 SOIL INVESTIGATION DETAILS (BH11 - BH12) REV 0
240 KPKR/J/R/03/19/6/ST 36 BOREHOLE LOCATION REV 0
241 KPKR/J/R/03/19/6/ST 37 SHEET PILE REV 0

BOX GIRDER
242 KPKR/J/R/03/19/6/ST 38 BOX GIRDER LAYOUT & DIMENSION DETAILS 1 REV 0
243 KPKR/J/R/03/19/6/ST 39 BOX GIRDER LAYOUT & DIMENSION DETAILS 2 REV 0
244 KPKR/J/R/03/19/6/ST 40 BOX GIRDER PRESTRESSING CABLE 1 REV 0
245 KPKR/J/R/03/19/6/ST 41 BOX GIRDER PRESTRESSING CABLE 2 REV 0
246 KPKR/J/R/03/19/6/ST 42 SEGMENT CONCRETE DETAILS 1/16 REV 0
247 KPKR/J/R/03/19/6/ST 43 SEGMENT CONCRETE DETAILS 2/16 REV 0
248 KPKR/J/R/03/19/6/ST 44 SEGMENT CONCRETE DETAILS 3/16 REV 0
249 KPKR/J/R/03/19/6/ST 45 SEGMENT CONCRETE DETAILS 4/16 REV 0
250 KPKR/J/R/03/19/6/ST 46 SEGMENT CONCRETE DETAILS 5/16 REV 0
251 KPKR/J/R/03/19/6/ST 47 SEGMENT CONCRETE DETAILS 6/16 REV 0
252 KPKR/J/R/03/19/6/ST 48 SEGMENT CONCRETE DETAILS 7/16 REV 0
253 KPKR/J/R/03/19/6/ST 49 SEGMENT CONCRETE DETAILS 8/16 REV 0
254 KPKR/J/R/03/19/6/ST 50 SEGMENT CONCRETE DETAILS 9/16 REV 0
255 KPKR/J/R/03/19/6/ST 51 SEGMENT CONCRETE DETAILS 10/16 REV 0
256 KPKR/J/R/03/19/6/ST 52 SEGMENT CONCRETE DETAILS 11/16 REV 0
257 KPKR/J/R/03/19/6/ST 53 SEGMENT CONCRETE DETAILS 12/16 REV 0
258 KPKR/J/R/03/19/6/ST 54 SEGMENT CONCRETE DETAILS 13/16 REV 0
259 KPKR/J/R/03/19/6/ST 55 SEGMENT CONCRETE DETAILS 14/16 REV 0
260 KPKR/J/R/03/19/6/ST 56 SEGMENT CONCRETE DETAILS 15/16 REV 0
Drawing Master List
Project : MENAIKTARAF JAMBATAN SULTAN HAJI AHMAD SHAH (DARIPADA 2 LORONG KEPADA 4 LORONG) Date of Received
Contract No. : JKR/IP/CKUB/146/2020 Date 9 30
Month 9 9
Year 2020 2020

No. Drawing No. Drawing Title Construction / Shop Drawings


261 KPKR/J/R/03/19/6/ST 57 SEGMENT CONCRETE DETAILS 16/16 REV 0
262 KPKR/J/R/03/19/6/ST 58 SEGMENT REINFORCEMENT DETAILS 1 OF 7 REV 0
263 KPKR/J/R/03/19/6/ST 59 SEGMENT REINFORCEMENT DETAILS 2 OF 7 REV 0
264 KPKR/J/R/03/19/6/ST 60 SEGMENT REINFORCEMENT DETAILS 3 OF 7 REV 0
265 KPKR/J/R/03/19/6/ST 61 SEGMENT REINFORCEMENT DETAILS 4 OF 7 REV 0
266 KPKR/J/R/03/19/6/ST 62 SEGMENT REINFORCEMENT DETAILS 5 OF 7 REV 0
267 KPKR/J/R/03/19/6/ST 63 SEGMENT REINFORCEMENT DETAILS 6 OF 7 REV 0
268 KPKR/J/R/03/19/6/ST 64 SEGMENT REINFORCEMENT DETAILS 7 OF 7 REV 0
269 KPKR/J/R/03/19/6/ST 65 ANCHORAGE DETAILS 1 OF 11 REV 0
270 KPKR/J/R/03/19/6/ST 66 ANCHORAGE DETAILS 2 OF 11 REV 0
271 KPKR/J/R/03/19/6/ST 67 ANCHORAGE DETAILS 3 OF 11 REV 0
272 KPKR/J/R/03/19/6/ST 68 ANCHORAGE DETAILS 4 OF 11 REV 0
273 KPKR/J/R/03/19/6/ST 69 ANCHORAGE DETAILS 5 OF 11 REV 0
274 KPKR/J/R/03/19/6/ST 70 ANCHORAGE DETAILS 6 OF 11 REV 0
275 KPKR/J/R/03/19/6/ST 71 ANCHORAGE DETAILS 7 OF 11 REV 0
276 KPKR/J/R/03/19/6/ST 72 ANCHORAGE DETAILS 8 OF 11 REV 0
277 KPKR/J/R/03/19/6/ST 73 ANCHORAGE DETAILS 9 OF 11 REV 0
278 KPKR/J/R/03/19/6/ST 74 ANCHORAGE DETAILS 10 OF 11 REV 0
279 KPKR/J/R/03/19/6/ST 75 ANCHORAGE DETAILS 11 OF 11 REV 0
280 KPKR/J/R/03/19/6/ST 76 PLAN OF TOP FLANGE FOR DIAPHRAGM AT PIER 3&4 SEGMENT REV 0
281 KPKR/J/R/03/19/6/ST 77 DIAPHRAGM DETAILS 1-1 REV 0
282 KPKR/J/R/03/19/6/ST 78 DIAPHRAGM DETAILS 2-2 REV 0
283 KPKR/J/R/03/19/6/ST 79 DIAPHRAGM DETAILS 3-3 REV 0
284 KPKR/J/R/03/19/6/ST 80 END DIAPHRAGM ABUTMENT A&B REV 0
285 KPKR/J/R/03/19/6/ST 81 G.I LADDER AT PIER 3 & 4 REV 0
286 KPKR/J/R/03/19/6/ST 82 DRAINAGE DETAILS REV 0
287 KPKR/J/R/03/19/6/ST 83 DRAINAGE LAYOUT REV 0
288 KPKR/J/R/03/19/6/ST 84 CONSTRUCTION SEQUENCE OF BOX GIRDER 1 REV 0
289 KPKR/J/R/03/19/6/ST 85 CONSTRUCTION SEQUENCE OF BOX GIRDER 2 REV 0
290 KPKR/J/R/03/19/6/ST 86 BOX GIRDER CAMBER PROFILE REV 0

RIB BEAM
291 KPKR/J/R/03/19/6/ST 87 BEAM ARRANGEMENT FOR PIER 1-2 & ABUTMENT A REV 0
292 KPKR/J/R/03/19/6/ST 88 BEAM ARRANGEMENT FOR PIER 5-11 & ABUTMENT B REV 0
293 KPKR/J/R/03/19/6/ST 89 25m POST-TENSIONED RIB-BEAM - CONCRETE DETAILS 1 OF 5 REV 0
294 KPKR/J/R/03/19/6/ST 90 25m POST-TENSIONED RIB-BEAM - CONCRETE DETAILS 2 OF 5 REV 0
295 KPKR/J/R/03/19/6/ST 91 25m POST-TENSIONED RIB-BEAM - CONCRETE DETAILS 3 OF 5 REV 0
296 KPKR/J/R/03/19/6/ST 92 25m POST-TENSIONED RIB-BEAM - CONCRETE DETAILS 4 OF 5 REV 0
Drawing Master List
Project : MENAIKTARAF JAMBATAN SULTAN HAJI AHMAD SHAH (DARIPADA 2 LORONG KEPADA 4 LORONG) Date of Received
Contract No. : JKR/IP/CKUB/146/2020 Date 9 30
Month 9 9
Year 2020 2020

No. Drawing No. Drawing Title Construction / Shop Drawings


297 KPKR/J/R/03/19/6/ST 93 25m POST-TENSIONED RIB-BEAM - CONCRETE DETAILS 5 OF 5 REV 0
298 KPKR/J/R/03/19/6/ST 94 REINFORCEMENT DETAILS FOR RIB BEAM 1 OF 2 REV 0
299 KPKR/J/R/03/19/6/ST 95 REINFORCEMENT DETAILS FOR RIB BEAM 2 OF 2 REV 0
300 KPKR/J/R/03/19/6/ST 96 25m DECK SLAB AND REINFORCEMENT DETAILS 1 OF 2 REV 0
301 KPKR/J/R/03/19/6/ST 97 25m DECK SLAB AND REINFORCEMENT DETAILS 2 OF 2 REV 0
302 KPKR/J/R/03/19/6/ST 98 END DIAPHGRAM AT ABUTMENT A, B AND PIER 2,5 REV 0

EXISTING BRIDGE
303 KPKR/J/R/03/19/6/ST 99 GENERAL ARRANGEMENT FOR EXISTING BRIDGE REV 0
304 KPKR/J/R/03/19/6/ST 100 CROSS SECTION FOR EXISTING BRIDGE REV 0

EXTENSION OF TWIN BOX CULVERT (CH 1700)


305 KPKR/J/R/03/19/6/BC 01 GENERAL ARRANGEMENT TWIN BOX CULVERT REV 0
306 KPKR/J/R/03/19/6/BC 02 STANDARD TWIN BOX CULVERT - CULVERT DETAILS REV 0
307 KPKR/J/R/03/19/6/BC 03 STANDARD TWIN BOX CULVERT - WINGWALL DETAILS REV 0
308 KPKR/J/R/03/19/6/BC 04 IN-SITU BOX CULVERT EXTENSION JOINT REV 0

ELECTRICAL WORKS
309 KPKR/J/R/03/19/6/RL 01 GENERAL ARRANGEMENT FOR ROAD LIGHTING AT BRIDGE REV 0

You might also like