You are on page 1of 2

Chin Business Bldg.

3rd Floor
Unit A. 711 P. Paterno St.
Quiapo Manila

DATE: November 15, 2023


QUOTATION 275-11140023-35
TO: Procurement Office
PSA Laguna Provincial Statistical Office

SUBJECT: COST PROPOSAL FOR THE "REHABILITATION OF COMFORT ROOMS AND KITCHEN SINKS OF PSA LAGUNA PROVINCIAL
STATISTICAL OFFICE"
PSA Laguna Provincial Statistical Office
San Pablo City, Laguna

Doc. Ref. No.: LAG-23-10-103

Dear Procuring Entity of PSA Laguna,

We have the pleasure to present you the following article(s) on the terms and conditions set forth hereunder.

ITEM/ DESCRIPTION OF WORK QTY UNIT UNIT PRICE AMOUNT

A. Ground Floor 80,881.00


1. Supply and Replacement of Plumbing Fixtures
1.1. Sink Faucet, Pozzi DH-150 Stainless Steel 304, Satin Finish 3 pcs. 2,024.00 6,072.00
1.2. Water Closet, Pozzi Davian 1Pc Toilet With Supply Pipe ,Torpedo Flush, 2 pc. 19,928.00 39,856.00
Soft Closing & Ot-330
1.2. Bidet, SUGI Sbs1 Bidet Set Stainless Steel 304 2 pcs. 2,949.00 5,898.00
2. Supply and Installation of Tiles - P.Tech Quartz Stone Countertop, Arctic Series 1 set 21,000.00 21,000.00
Lf003-D2, Polished, 600mm x 2200mm
3. Supply and Installation of Aluminum Cabinet (2 Doors) with Aluminum Floor 1 set 8,055.00 8,055.00

B. Second Floor Admin Area 32,956.00


1. Supply and Replacement of Plumbing Fixtures
1.1. Sink Faucet, Pozzi DH-150 Stainless Steel 304, Satin Finish 1 pc. 2,024.00 2,024.00
1.2. Water Closet, Pozzi Davian 1Pc Toilet With Supply Pipe ,Torpedo Flush, 1 pc. 19,928.00 19,928.00
Soft Closing & Ot-330
1.3. Bidet, SUGI Sbs1 Bidet Set Stainless Steel 304 1 pc. 2,949.00 2,949.00
2. Supply and Installation of Aluminum Cabinet (2 Doors) with Aluminum Floor 1 set 8,055.00 8,055.00

C. Second Floor Statistical Area 55,833.00


1. Supply and Replacement of Plumbing Fixtures
1.1. Sink Faucet, Pozzi DH-150 Stainless Steel 304, Satin Finish 1 pc. 2,024.00 2,024.00
1.2. Water Closet, Pozzi Davian 1Pc Toilet With Supply Pipe ,Torpedo Flush, 2 pcs. 19,928.00 39,856.00
Soft Closing & Ot-330
1.3. Bidet, SUGI Sbs1 Bidet Set Stainless Steel 304 2 pcs. 2,949.00 5,898.00
2. Supply and Installation of Aluminum Cabinet (2 Doors) with Aluminum Floor 1 set 8,055.00 8,055.00

SUB-TOTAL 169,670.00

TOTAL AMOUNT 169,670.00


12% VAT 20,360.40
TOTAL (VAT INC.) 190,030.40
DATE: November 15, 2023
QUOTATION 275-11140023-35
TO: Procurement Office
PSA Laguna Provincial Statistical Office

SUBJECT: COST PROPOSAL FOR THE "REHABILITATION OF COMFORT ROOMS AND KITCHEN SINKS OF PSA LAGUNA PROVINCIAL
STATISTICAL OFFICE"
PSA Laguna Provincial Statistical Office
San Pablo City, Laguna

Doc. Ref. No.:


LAG-23-10-103

TERMS AND CONDITIONS:

1. Delivery Terms: 30 calendar days after PO confirmation.


2. Payment is dated Company Check payable to DATANET ELECTRONIC ENTERPRISE
30% Downpayment
60% Progress Billing 1
100% Final Billing/ Completion
3. Warranty – A (1) one-month period after the completion of the project, after turnover and acceptance by the Procuring Entity.

Thank you for considering our services. We are confident that our team can deliver exceptional results that will exceed your expectations. We are
passionate about our work and take pride in providing top-notch service to our clients. Partnering with us will ensure that your needs are met with
the utmost professionalism and dedication.

We look forward to the opportunity to demonstrate our expertise and earn your trust.

Respectfully Yours,

Ervin Huyo-a
General Manager
Datanet Electronic Enterprise

You might also like