TEACHERS HOUSING
B55
B54
B56
B57
Water Tank 13
USING EL800 B53
B52
360m3 14
x8 5
Path
T6 11b
8 11b
6
6 11b
5 7 11b LEGEND - SECONDARY SCHOOL
4a 1 - Guard House: 3No.
4 4 12
SECONDARY 5 - Learning Area Ablution Blocks: 4No.
6 - 1x2 Science Laboratories: 2No.
K IT
C HE
NY
AR
D
11a - Female Hostel Block: 5No.
Female Hostel Toilets: 5No.
10 1 S TA
ND
BY
K IT
CH
11b - Male Hostel Block: 5No.
Male Hostel Toilets: 5No.
5
EN
2 3 11a NOTE:
9 1. The location and orientation of the walkway across the stream is indicative on the
drawing. The final location shall depend on actual site conditions.
2.The location of Infiltration Trenches and manholes shall depend on actual site
11a conditions.
3.The slope of the pipe and the depth of the manholes can be changed according to
T5
6.The material of pipe is uPVC or HDPE.
CLIENT
B46
B47 B48
B49
B50
KAFUE GORGE LOWER HYDROPOWER PROJECT
CONTRACTOR
DWG NAME
REV. :
A For Approval 2022-12-20 DWG No. KGL-DD-CI-17-01-450(A)-A SHEET 1 OF 1 A
SEPTIC Rev. Prep. Check Appro. Modification Date
780
780 Bx6 MH-b55 SECONDARY SCHOOL
TEACHERS HOUSING Depth 1.000
Invert 778.773
25% 160mm S
770 SN 8 , 0.6 N8, 10.81
1%
1 60m m 9.47m 42.17m
3 MH-b54
.329%
m S N8, 2 MH-b56 Depth 1.000
78
0 160m 44.67m Depth 1.000 B55 Invert 774.240
MH-b57 Invert 779.020
790 B54
Depth 1.000 B56
Invert 780.060
780 780
%
N8, 7.208
B57
760
72.89m
790
750
78
160m m S
0
790
76
0
770
800
B53
Water Tank
750
790
800
B52
.297%
SN 8 , 8
EL800 360m3
760
16 0m m 9 .67m
%
3 MH-b53
MH-b52
05
Depth 1.000 16
0m
9.7
Depth 1.500 777070 Invert 769.000 m
Invert 772.280 S
8,
00 68 N 8,
SN
0
8 MH-ss7/5 .16 29
75
770
770
G m .02
m
80 Depth 1.000 5%
0m
780
0
Invert 766.500
20
750
5.4 16 11b9
0m
79 767.50 m 759.80 200
0 S mm
62 N8, MH-p3/1 SN
750
%
.14 13 57. 8, 1.
m 607
m .80 Depth 1.000 71m 000
8% Invert 750.000 %
MH-ss17/4
. 60 3 .
T6
47 N 8,
768.00 Depth 1.000 11b10
757.00
S
Invert 758.000 11b7
m
MH-p3/2
0m
756.80
Depth 1.500
0
780
20
79
6.1
2%
0
76 Invert 749.423
77 0
764.00
.88 76
760
16
30 8,9 .
0m 11b8 MH-ss8
m
m
SN
756.00 Depth 1.284
%
S
78
790
75 N8,
m 000
MH-ss7/3 Invert 751.716
0
760
11b5 .31 6.
0m
0
750
m 654
. 41 1 .
Depth 1.000
75
6.2Invert 761.000 759.00 %
16
28 N 8,
766.30
S
770
23 .000 N8,
m
0m
11b6
1 mS
11b3
. 73 %
MH-ss7
20
MH-ss7/2 762.00 756.00
0m
7 Depth 1.000 750
5.2 Depth 1.000
16
750
764.00 Invert 761.237 Invert 752.000
767.00
19 .541 N8,
%
6 mS
. 35 % 11b1
760
m 000
m
750
760.30
0m
78
4a
. 73 1 .
77
11b4
0
0
0 MH-ss6/1
16
76
761.00
53 N 8,
76
MH-ss7/1
763.50
0
S
Invert 758.800
m
Invert 762.500 16
0m
4.1 0m
MH-ss3/4 m
20
765.00 11b2 23 S
Depth 1.000 16 0 2 7 .3 6 9 N 8 , 75
Invert 762.000 0m 76 759.80 . 52 % 0
m m CLIENT
7 60
MH-ss6
S
75 N8,
79
760
Depth 1.161
.31 6.
1 6 10 N 8 ,
0
6.5 m S
%
. 88 %
%
4.6
m
m 465
0m
4.2 761.00 16
. 12 4 .
20
765.00 0m
86 N 8,
16 m S
770
0m 22% . 62 %
m
CONTRACTOR
MH-ss3/5 2 .40 N8 N8, 757.00
m S .04m Depth 1.000 0
16
3 76
Depth 1.000 .94m3% , 160
m
47 Invert 752.706
MH-ss5/1
Depth 1.000
780
KIT
767.00 0
76 CH
EN
YA
RD
Invert 754.831
%
REV. :
m 512
5.1 758.00
46 N 8,
S
m
0m
700700 700
MH-b55
Depth 1.000
SECONDARY SCHOOL 710
710
Invert 778.773
25% 160mm S
SN 8 , 0.6 N8, 10.81
1%
1 60 m m 42.17m 720
MH-b54
720
Depth 1.000
B55 Invert 774.240
B54
780
710
%
N8, 7.208
740
0
73
740
MH-p3/3
760
72.89m Depth 1.000
750
72
160m m S
Invert 740.000
740
0
Integrated sewage treatment equipment
730
76 C
70
0
7420 0m m Septic tank B
0
0 SN 8 , 4 Grid well
57.87m .151%
770
71
A
740
0
B53 740
Path to Tank MH-p3/4
Depth 0.700
Invert 737.600
0
74
750
72
0
.297%
SN 8 , 8
760
7 50
16 0m m 9 .67m
%
3 MH-b53
2
m 705
Depth 1.000 16
1.500 0m
. 55 9 .
777070 Invert 769.000 m
772.280 S
97 N 8,
73
68 N8,
750
0
.16 29
75
S
m .02 The Location of Sewage System
m
5%
0m
COORDINATE LIST
20
750
X Y
740
0
76 A 664913.521 8242664.760
11b9 76
200 0 B 664918.755 8242667.897
759.80 mm
MH-p3/1 S C 664925.190 8242672.505
750
57. N8, 1.
%
750
m 607
MH-p3/2
0m
756.80
Depth 1.500
760
20
770
2%
0
76 Invert 749.423
.88 76
760
16
30 8,9 .
0m 11b8 MH-ss8
m
m
SN
S
75 N8,
m 000
Invert 751.716
m
0
750
m 654
. 41 1 .
75
759.00 %
16
28 N 8,
S
m
0m
11b6
MH-ss7
20
756.00
770
00 750
Depth 1.000
750
Invert 752.000
%
11b1
760
m 000
750
760.30
. 73 1 .
MH-ss6/1
53 N 8,
76
Depth 1.000
S
Invert 758.800
m
16
0m
0m 770
m
20
b2 23 S
2 7 .3 6 9 N 8 , 75
9.80 . 52 % 0
m CLIENT
MH-ss6
Depth 1.161
1 6 10 N 8 ,
16
20
0m
16 m S KAFUE GORGE LOWER HYDROPOWER PROJECT
2 1 .9 4 9 N 8 ,
22% . 62 %
76012.1
4.5 MH-ss5 m CONTRACTOR
N8, 757.00
m S 4m Depth 1.000
76
0
MH-ss5/1
60m 47.0 Invert 752.706 Depth 1.000
770
FU F
R N UR
Invert 756.000
ITU NIT
RE U R
STOE S
RETOR
E
DWG NAME
61 KIT
CH
EN
YA
RD
TOWNSHIP SEWER SYSTEM Ⅲ PLAN
831
REV. :
A For Approval 2022-12-20 DWG No. KGL-DD-CI-17-01-452(A)-A SHEET 2 OF 3 A
770
STA
ND
Rev. Prep. Check Appro. Modification Date
12.3
BY
KIT
CH
EN
8,
SN
16
0m 22 %
m
10 m S 4.5
0m
23 .403 N8, S N8, Depth 1.000 0
16
Depth 1.000 .94m % mm 7.04m 76
MH-ss5/1
160 4 Invert 752.706 Depth 1.000
780
4.5 Invert 757.000
770
FU F
0 767.00 0
76 CH
EN
YA
RD
Invert 754.831
%
m 512
27.09m
10 STA
ND
BY
12.3
. 54 2 .
KIT
5.1 758.00 CH
EN
8, 11a2
46 N 8,
4.4 757.00
767.00 SN 770
77
MH-ss3/3 756.00
S
0 m % 762.00
m
0m .625 6m Depth 1.000 16
0m
1 6 0 .4 MH-ss3 0m
5 Invert 765.841
16
2 Depth 1.000 MH-ss4/6 16 m S 11a4
0
1 5 10 8 ,
23 .949 N8,
76
MH-ss3/2 Invert 756.000 Depth 1.000
6.5 m SN
770 76 760 . 94 % 760.00
. 39 %
Depth 1.000 0 Invert 755.000 m
16
m
0m
Invert 766.000 0m
11a1 6 mS
16
5.3 MH-ss4/5
2 1 . 4 28 N 8 ,
770
MH-ss3/1
770
757.70 11a6
757.00 760 Depth 1.000 .82 %
Depth 1.000 760 m 764.00
Invert 759.000
Invert 767.000 3
MH-ss4/4
760
764.00
%
76
m 22%
11a3 Depth 1.000
m 550
2 0
780
780
760.00 Invert 760.400
.60 .4
768.00
. 12 9 .
38 8, 1
77 MH-ss2/1 9
63 N 8,
0 Depth 1.000 763.00
SN
S
790
m
0m 11a7
m
0m
m MH-ss4/3
0m
763.00 761.40
S 16
16
46 N8 Depth 1.051
16
0
.0 , 2 Invert 760.949 0 .6 m m
0
780 9m .1 S
77
70 2
% 8. 1 5% N8,
9m
11a8
%
160
762.00
29
MH-ss2 11a9 MH-ss4/2
2.1
.34 0.1
mm 5.05m
Depth 1.000 Depth 1.000
769.00 766.00 780
25 8, 2
Invert 762.000 Invert 761.000
m
2
SN8
SN
78
MH-ss1
0
, 20
T5
m
790 Depth 1.000 MH-ss4/1
0m
11a10
.367
Invert 767.000 Depth 1.000
T5
16
767.00
770
Invert 766.000
%
79 77
0 0 770 77
0
0
77
790
770
17%
780
160mm SN8, 8.9
790
78
40.17m
07
8 0
B46
780
160mm SNB47
8, 0.625% B48
44.03m 160mm SN8, 0.6 B49
25% 160mm SN8, 0.6 B50
780
MH-b46 40.04m 25%
Depth 1.000 MH-b47 40.17m 770
Invert 775.000 Depth 1.000 MH-b48 MH-b49
Invert 772.000 Depth 1.250 Depth 1.000
Invert 771.750 Invert 773.000
Bx6 B51
R5
70
CLIENT
REV. :
A For Approval 2022-12-20 DWG No.
Rev. Prep. Check Appro. Modification Date
KGL-DD-CI-17-01-453(A)-A SHEET 3 OF 3 A
LEGEND
2500
1900
1600
A A
EL 738.00
SECTION A-A
Scale 1:200 A 2022-12-20
Rev. Prep. Check Appro. Modification Date
CLIENT
DWG NAME
1200 1200
200
200
200 800 200 200 800 200
1200
1200
2 2
800
800
200
200
1
Manhole Gatevalve
Chamber
200mm gatevalve
2000
250 500 500 500 250
200
min
1 1
500
1 1
A 2022-12-20
Stone with min size Ø200mm laid on Rev. Prep. Check Appro. Modification Date
40mm bed of 1:3 mortar and joints grouted Trim excavation to form shape & grade + CLIENT
with mortar and made flush and clean (no hand-ram in readiness for stone pitching
rounded boulders)
CLIENT
DWG NAME
REV. :
DWG No. KGL-DD-CI-17-01-456(A)-A SHEET 1 OF 2 A
A 2022-12-20
Rev. Prep. Check Appro. Modification Date
CLIENT
DWG NAME
REV. :
DWG No. KGL-DD-CI-17-01-457(A)-A SHEET 2 OF 2 A
CLIENT
DWG NAME
Grid well
REV. :
A For Approval 2022-12-20 DWG No. KGL-DD-CI-17-01-458(A)-A SHEET 1 OF 2 D
Rev. Prep. Check Appro. Modification Date
CLIENT
DWG NAME
格栅井
REV. :
A For Approval 2022-12-20 DWG No. KGL-DD-CI-17-01-459(A)-A SHEET 2 OF 2 D
Rev. Prep. Check Appro. Modification Date
CLIENT
Notes:
1. The elevations are in m, The dimensions are in mm. KAFUE GORGE LOWER HYDROPOWER PROJECT
2.The treatment scale of integrated sewage treatment equipment is 150m ³/ d. CONTRACTOR
Installed capacity 7kW
3.The equipment size and inlet and outlet pipe position of different manufacturers
DWG NAME
are different, so the equipment size and relevant foundation size need to be Integrated sewage treatment equipment
rechecked before construction
REV. :
A For Approval 2022-12-20 DWG No. KGL-DD-CI-17-01-460(A)-A SHEET 1 OF 1 A
Rev. Prep. Check Appro. Modification Date