A 2023.11.10 Structural Calculations of the Secondary School J.C H.
M Shi
Walkway Roof Design Report Yan
Revision Date Description Prepared Checked Approved
Client
KGL ZESCO
Subject
KAFUE GORGE LOWER HYDROELECTRIC PROJECT
Structural Calculation of the Secondary School Walkway
Roof Design Report
Document Number Revision
KGL-DD-R-CI-17-002(A)-A A
DESIGN REPORT
8.55kN
4.275kN 4.275kN
1 4
3
8.55kN 8.55kN
2D Truss Layout
SCALE 1:100
0.00 kN
+9.61kN 3 +9.61kN
Node 3 Forces
SCALE 1:100
-10.51kN
4.275kN
1
+9.61kN
8.55kN Node 1 Forces
SCALE 1:100
/m
1kN
.28
=3
4°)
s(2
* co
.76
+2
ad)
d lo
win
m(/
6kN
N/m
2.76k
0.7
z=
Wz
Wy
y=
2.76
kN/m
* sin
(24
°) =
1.12
2kN
/m
DESIGN REPORT
2. ɛ