Professional Documents
Culture Documents
X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29 X30 X31 X32 X33 X34 X35 X36 X37 X38 X39
FOR CONTINUATION REFER DWG NO: X40 X41
AWQAF-AAE-SD-HVAC-MEC-005-2
AWQAF-AAE-SD-HVAC-MEC-005-2
AWQAF-AAE-SD-HVAC-MEC-005-3
SAD SUPPLY AIR DUCT
EAD EXHAUST AIR DUCT
VCD VOLUME CONTROL DAMPER
DS DUCT SUPPORT
DSU SPLIT DUCTED UNIT
TH THERMOSTAT
SCD SUPPLY CEILING DIFFUSER
RCD RETURN CEILING DIFFUSER
F/A FROM ABOVE
T/A TO ABOVE
T/B TO BELOW
FFL FINISH FLOOR LEVEL
CFM CUBIC FEET PER MINUTE
COORDINATION
ARCHITECTURAL
STRUCTURAL
MEP
INFRA
ASSIST. +9.05 +9.05 +9.05 +9.05 +9.05 SUB-CONTRACTOR
+9.05
SSL. SSL. +9.05
MANAGER SSL. SSL. SSL. SSL.
SSL.
+9.05
+9.05
REFERENCE DRAWINGS
SSL.
OFFICE F-14 OFFICE F-13 OFFICE F-12 OFFICE F-11 OFFICE F-10 OFFICE M-09 SSL.
OFFICE M-08
OFFICE M-07
OFFICE M-06
OFFICE F-05
ELEC.
PANTRY TOILET WATER PANTRY TOILET TOILET PANTRY PANTRY TOILET TOILET PANTRY PANTRY TOILET TOILET PANTRY
METERS
PANTRY TOILET
TOILET PANTRY
ELEC. ELEC. PANTRY TOILET
TOILET PANTRY
+9.05
+9.05 +9.05 +9.05
SSL. +9.05 ELEC.
SSL. SSL. SSL.
SSL.
+9.05
SSL.
PANTRY TOILET TOILET PANTRY PANTRY TOILET TOILET PANTRY PANTRY TOILET TOILET PANTRY TOILET PANTRY ISSUES \ REVISIONS
PANTRY TOILET
TOILET PANTRY
PANTRY PANTRY
TOILET PANTRY
SECRETARY
ISSUES \ REVISIONS
APPROVED A
MANAGER +9.05
APPROVED AS NOTED B
+9.05 +9.05 +9.05 +9.05 +9.05
SSL. SSL. SSL. SSL. SSL. SSL.
+9.05
+9.05 REVISED AND RE-SUBMIT C
SSL.
SSL. +9.05
+9.05 REJECTED D
OFFICE F-15 OFFICE F-16 OFFICE F-17 OFFICE F-18 OFFICE F-19 OFFICE F-20 OFFICE F-21 SSL.
OFFICE F-22
SSL. ENGINEER SIGNATURE
OFFICE F-23
OFFICE F-24
CLIENT
OFFICE F-25
MEETING
CONSULTANT
MAIN CONTRACTOR
SUB CONTRACTOR
MAIN ROAD WALKWAY PAVING
(OUTSIDE PLOT)
LIGHTNING
ELECTROMECHANICAL
P.O. BOX: 47100, DOHA-QATAR
PROJECT TITLE
AWQAF-AAE-SD-HVAC-MEC-005-2
AWQAF-AAE-SD-HVAC-MEC-005-3
AWQAF-AAE-SD-HVAC-MEC-005-1
AWQAF-AAE-SD-HVAC-MEC-005-2
X16 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29 X30 X31 X32 X33 X35 X36
FIRST FLOOR PLAN
X37
PART-2
X38 X39 X40 X41 X42
HVAC SYSTEM LAYOUT
(PART-2)
SCALE : 1:150 @A1 DATE : 24-12-2023
PROJECT NUMBER : REV.
FIRST FLOOR HVAC SYSTEMS LAYOUT (PART-2) DRAWING NUMBER :
00
AWQAF-AAE-SD-HVAC-MEC-005-2