Preparation (STEP 1)
Company Name: ____________________________ Subject: _______________________________ PFMEA ID Number: _____________________________
Plant location: _____________________________ PFMEA Start date: ______________________ Process responsibility: _________________________
Customer name: ___________________________ PFMEA Rev. date: _______________________ Confidentiality level:___________________________
Model year / Platform: ______________________ Cross-Functional team: ____________________________________________________
__________________________________________________________________________
D F
Structure Analysis (STEP 2) Function Analysis (STEP 3) Failure Analysis (STEP 4) O Risk AnalysisE (STEP 5) I Optimization (STEP 6)
S C T L
# E C E T
V U C E O D
E R T R S c
R R I P e c
e P
1. Function of t
1. Process 3. Process work the process I E O M C v u e M
T Current N N
F O e r
F
Item. System, 2. Process Step. element (4M item. Function 3. Function of the process work Y 2. Failure 3. Failure Prevention C Current D Responsible Target Action taken r r
c
subsystem, Station No. and TYPE, Machine, of the system, 2. Function of the Process Step 1. Failure Mode (FM) of Cause (FC) of E Special Prevention Detection person's t Special E
element and process Control (PC) ofE
Detection ( Characteristic E
Completion Status with pointer Completion i e i Characteristic Remarks
part element name of focus Method, subsystem, part and Product Characteristic. characteristic Effect (FE) ( the process the work Failure Cause ( Controls (DC)
D A classification Action action name. Date to evidence Date
t n o classification A
or name of the element Material and S step. element. ) ( y c n
element or ) (FC) O O e
process Man power) process ) O A P ( A
(
O F P T S ( D P
F O I ) O )
F F O )
F C N
E F / A
C F L
M )
5acXjzUk
C2 PFMEA
S Effect Impact to your plant Impact to Ship-to Plant (when known) Impact to End User (When known)
Product may have to be sorted and a Line shutdown from 1 hour up to full
portion (less than 100%) scrapped; production shift; stop shipment possible; Degradation of primary vehicle function
7 deviation from primary process; field repair or replacement required necessary for normal driving during
decreased line speed or added man (Assembly to End User) other than for expected service life.
power regulatory noncompliance.
100% of production run may have to
6 Line shutdown up to one hour Loss of secondary vehicle function
be reworked off line and accepted
A portion of the production run may Less than 100% of product affected; strong
Degradation of secondary vehicle
5 have to be reworked off line and possibility for additional defective product;
Moderately low function.
accepted sort required; no line shutdown
100% of production run may have to Defective product triggers significant
Very objectionable appearance, sound,
4 be reworked in station before it is reaction plan; additional defective products
vibration, harshness, or haptics.
processed. not likely; sort not required
A portion of the production run may Defective product triggers minor reaction
Moderately objectionable appearance,
3 have to be reworked in-station before plan; additional defective product no likely;
sound, vibration, harshness, or haptics
it is processed sort not required.
Low
Defective product triggers no reaction plan;
Slight inconvenience to process, Slightly objectionable appearance,
2 additional defective products not likely; sort
operation, or operator sound, vibration, harshness, or haptics.
not required; requires feedback to supplier
1 Very Low No discernible effect No discernible effect or no effect No discernible effect
5acXjzUk
C2.2 PFMEA OCCURRENCE C2.3 ALTERNATIVE PFMEA OCCURRENCE (O) TABLE C2.3.2 PFMEA OCCURRENCE (O) with Time Based Failure Prediction values
C2.3.1 PFMEA occurrence (O) with incidents per Thousand Values
Occurrence Potential (O) for the process Occurrence Potential (O) for the process Occurrence Potential (O) for the process
Potential Failure Causes rated according to the criteria below. Consider Prevention Controls when
determining the best Occurrence estimate. Occurrence is a predictive qualitative rating made at the time
Potential Failure Causes rated according to the criteria below. Consider Prevention Controls when determining the Blank until filled in by user Potential Failure Causes rated according to the criteria below. Consider Prevention Controls when Blank until filled in by user of evaluation and may not reflect the actual occurrence. The occurrence rating number is a relative rating Blank until filled in by user
best Occurrence estimate. Occurrence is a predictive qualitative rating made at the time of evaluation and may determining the best Occurrence estimate. Occurrence is a predictive qualitative rating made at the time of within the scope of the FMEA (process being evaluated). For Prevention Controls with multiple
not reflect the actual occurrence. The occurrence rating number is a relative rating within the scope of the FMEA evaluation and may not reflect the actual occurrence. The occurrence rating number is a relative rating Occurrence Ratings, use the rating that best reflect the robustness of the control
(process being evaluated). For Prevention Controls with multiple Occurrence Ratings, use the rating that best within the scope of the FMEA (process being evaluated). For Prevention Controls with multiple Occurrence
reflect the robustness of the control Ratings, use the rating that best reflect the robustness of the control
Prediction of
Corporate of Product Line Incidents per 1000 Corporate of Product Line Time Based Failure Cause Corporate of Product Line
O Failure Cause Type of Control Prevention Controls O Type of Control Prevention Controls O Type of Control Prevention Controls
Examples. items/vehicles Examples. Prediction Examples.
Occurring
5acXjzUk
C2.4 PFMEA DETECTION (D)
Test or inspection method has Human inspection (visual, tactile, audible), or use of manual
8 not been proven to be gauging (attribute or variable) that should detect the failure
effective and reliable (e.g. plant mode or failure cause
has little or not experience
Low with method, gauge R&R Machine-based detection (automated or semi-automated with
7 results marginal on comparable notification by light, buzzer, etc.) or use of inspection equipment
process or this application, such as a coordinate measuring machine that should detect
etc.) failure mode or failure cause.
5acXjzUk
C2.5 ACTION PRIORITY TABLE FOR PFMEA
5acXjzUk