You are on page 1of 2

Swedge

2250.0000
UP
LOCK
AIR
UP
RAMP

UP
RECEPTION

WAITING
AREA
AND
4089.0443
UP
RAMP

UP
AIR LOCK

UP
UP
A. APPROVED, FURTHER WORK CAN PROCEED

B. APPROVED WITH COMMENTS, WORK CAN


PROCEED SUBJECT TO INCORPORATION OF
COMMENTS
C. REJECTED, REVISE ACCORDING TO COMMENTS
AND RESUBMIT
D. RETAINED FOR INFORMATION

'P' (PRELIMINARY) ISSUES ARE NOT TO BE USED FOR CONSTRUCTION /


FABRICATION BUT ARE ISSUED FOR LIMITED PURPOSES ONLY AS INDICATED IN
THE SMALL BLOCK ABOVE THIS BLOCK.
CONSTRUCTION / FABRICATION WORK IS PERMITTED ON 'R' (RELEASED) ISSUES
ONLY.
INFORMATION CONTAINED WITHIN 'HOLD' IS NOT RELEASED FOR
CONSTRUCTION / FABRICATION. FIELD MUST GET DESIGN OFFICE TO CLEAR
'HOLDS' IN TIME BEFORE PROCEEDING WITH ANY CONSTRUCTION / FABRICATION
WORK RELATED TO 'HOLDS'.

“ ”

CONSULTING ENGINEERS LIMITED


MUMBAI
Swedge

2250.0000
UP
LOCK
AIR
UP
RAMP

UP
RECEPTION

WAITING
AREA
AND
4089.0443
UP
RAMP

UP
AIR LOCK

UP
UP
A. APPROVED, FURTHER WORK CAN PROCEED

B. APPROVED WITH COMMENTS, WORK CAN


PROCEED SUBJECT TO INCORPORATION OF
COMMENTS
C. REJECTED, REVISE ACCORDING TO COMMENTS
AND RESUBMIT
D. RETAINED FOR INFORMATION

'P' (PRELIMINARY) ISSUES ARE NOT TO BE USED FOR CONSTRUCTION /


FABRICATION BUT ARE ISSUED FOR LIMITED PURPOSES ONLY AS INDICATED IN
THE SMALL BLOCK ABOVE THIS BLOCK.
CONSTRUCTION / FABRICATION WORK IS PERMITTED ON 'R' (RELEASED) ISSUES
ONLY.
INFORMATION CONTAINED WITHIN 'HOLD' IS NOT RELEASED FOR
CONSTRUCTION / FABRICATION. FIELD MUST GET DESIGN OFFICE TO CLEAR
'HOLDS' IN TIME BEFORE PROCEEDING WITH ANY CONSTRUCTION / FABRICATION
WORK RELATED TO 'HOLDS'.

“ ”

CONSULTING ENGINEERS LIMITED


MUMBAI

You might also like