You are on page 1of 6

Juan Sebastian Cano Campuzano

Las Gardenias • Quito, Ecuador • sebastiancanocampuzano@gmail.com • +593 992683846 Age: 31 Linked in


Profile: https://www.linkedin.com/in/juan-sebastian-cano-campuzano-36ba26160/

Education

MEMORIAL UNIVERISTY Newfoundland, CA


MEng Mechanical Engineering- Renewable Energy Systems March, 2022

UNIVERSIDAD DE LA RIOJA
Master of Busines &Administration - MBA in Project Management La Rioja, ESP
Especialidad- Project Management Octubre, 2020

UNIVERSIDAD DE LAS FUERZAS ARMADAS -ESPE Quito, ECU


Ingeniero Mecánico Marzo, 2018

FULBRIGHT COMMISSION Quito, ECU


English Teaching Program (ETP)- English Fluency Certification Mayo, 2018
TELP y TOELF

Experience
GMINING SERVICES Quebec-Quito, CA-ECU
Mechanical Engineer Marzo 2022-Agosto 2023

⚫ Development and CAPEX optimization of mechanical area for projects within Feasibility and Detail Engineering stages.
⚫ Development and review of technical specifications, scope of work, engineering calculations, P&IDs, PFDs and technical
evaluations for contracts award.
⚫ Coordination between different disciplines, eletrical, piping , civil and strucutral for designing process plants.
⚫ Coordination with international suppliers for deiliver of mechanical equipment within budget and schedule.

Projects

Galaxy - James Bay Lithium-Alkem - Lithium Mine- Canada - Detail Engineering - Total CAPEX 590 Millions CAD

⚫ Development and optimization of the mechanical CAPEX (56 Millions CAD) obtaining a total saving of 300,000 CAD
related to commissiong and capital spares
⚫ Coordination with international supplier for the design, fabrication,and supply of a Flocullant Plant and Safety Showers
systems.

Tocantinzinho GMining Ventures -Brazil - Gold Mine - Detail Engineering and Construction

⚫ Coordination with international suppliers for the design, fabrication,and supply of the Thickener Area , Gold Refinery
Area(ADR) and HVAC System.

Fruta del Norte Lundin Gold - Expansión - Ecuador- Feasibility and Detail Engineering stages.
⚫ Coordination with international suppliers for the design, fabrication, supply and CAPEX development of a Coagulation
System and gold Concentrate Larox Filters

Loma Larga- Dundee Preacious Metals -Ecuador - Mina de Oro, Cobre y Plata - Fase de Factibilidad
⚫ Coordination with international suppliers for the design, fabrication,and supply of a Reverse Osmosis System.

La Plata- Atico Mining - Ecuador- Fase de Factibilidad


⚫ Review of PFDs (Process Flow Diagrams) for the CAPEX update based on the new mechanical equipment list.
LUNDIN GOLD-AURELIAN Quito, ECU
Project Engineer - Zamora Suspended Bridge Project January -June 2021

• Construction of a Suspended Bridge.


• Planned, coordinated and organized resources for different works within the project.
• Monitored the scope of work, sequence of activities, risks and impacts on project costs and schedule.
• Verified that the project deliverables meet the requirements of engineering codes and quality standards.
• Coordinated local permits and technical requirements according to customer specifications.
• Delivered monthly and daily reports of the project progress to the general management.
• Reviewed and approved documentation delivered by the quality assurance and control department (QA / QC).

Project Proyectist - Fruta del Norte Mining Project February 2019-April 2020

• Implemented and designed the detailed engineering for the mining project in the areas of Piping, Mechanical &
Structural.
• Reviewed and designed of construction and As- Built drawings for the Process Plant and Underground Mine during the
construction and commissioning phases.
• Verified that the design requirements were met for the different areas of the Process Plant according to design codes.
• Coordinated the design and construction process with the requirements of the Canadian contractor G-Mining.

LAFARGE- HOLCIM Quito, ECU


Mobile Plant Supervisor – Quito´s Subway Project Jun-Nov 2018

• Supervised a mobile plant for concrete production leading a team composed of 20 people , whose purpose was to supply
the necessary concrete for the building process needed by the subway in Quito-Ecuador.
• Supervised the Production plan and Quality Control of the concreted produced.
• Managed the preventive maintenance program in order to guarantee the availability of every machine inside of the plant
using ERP SAP/PM software and a TPM approach.
• Managed the weekly preventive maintenance orders programming , maintenance backlog, and corrective maintenance
orders.
• Presented maintenance key performance indicators in order to improve de availability and reliability of the plant
equipment.
• Conducted equipment reliability analysis based on a RCM approach using ( Root and Cause and FMEA analysis)
• Maintained a right communication with the customers in order to satisfy his or her needs.

ARMY RESEARCH CENTER (CICTE) Quito, ECU


Engineering and Maintenance Assistant February -Oct 2016

• Directed preventive and corrective maintenance scheduling for heavy military equipment.
• Directed and supervised an engineering group for the basic and conceptual engineering of a hangar.
• Designed a hangar using structural calculations based on AISC code.
• Designed Fire systems based on NFPA code.
Research Papers & Conferences

INTERNATIONAL JOURNAL PUBLICATION & EXPOSITION


Development of a cooling device for industrial applications and computational systems published in an international ASME Journal
and represented in an international conference in USA.
Research Paper Main Author- Journal of Thermal Science and Engineering Applications.
“Experimental Study of the Incidence of Changing a Synthetic Jet Orifice in Heat Transfer Using the Taguchi Method
Approach” .
Congress Expositor
International Mechanical Engineering Congress & Exposition ASME IMECE 2019 , Salk Lake City, Utah USA

Technical & Management Skills


CAD-CAM-CAE Software: ANSYS, Inventor, Solid Works, AutoCAD, Fusion 360 (CNC Manufacturing), AutoCAD Plant 3D,
Advanced Steel, Navisworks, Revit , BIM Methodology.

Renewable Energy: Homer Pro (PV Systems , Hybrid Energy Systems)

CFD (Computational Fluid Dynamics) Software: ANSYS Fluent, XFOIL, XFLR5 ERP Software: SAP-PM

Code Handling: ASME (Pressure Vessels Code , Atmospheric Store Tanks and Transport Pipping Code B31), NFPA (Fire Systems),
AISC (Specification for Structural Steel Buildings), AWS (Welding Processes D1.1 API 1104). NACE MR0175.

Occupational Safety and Health: Risks Work License (SEK University) Hoisting and Rigging Confined spaces,
Working at Height, Lock out/ Tag out, Excavations.

Maintenance Management: TPM, Corrective, Preventive and Predictive maintenance -SAP /PM. Maintenance Indicators, Reliability
Management, Availability, MTBF. Predictive failure analyses based on Vibrations and Thermography equipment. Periodicity tables.
Maintenance Budged Planning.

Quality Control Tools: Six Sigma (DMAIC) BlackBelt Handbook, FMEA, SPC (Statistical Processes Control), Acceptance
Sampling. QA/QC (Quality Control -Quality Assurance), Software Minitab.

Project Management (PM): Project Management according with the PMI (Project Management Institute) and PMBOK methodology.
Stages: Initiating, Planning, Executing, Monitoring and Controlling, Closing. SCRUM and SPRINT Methodology

Costs Analysis, Budgets & Financial Planning: Unitary Costs Calculation. Sales, Production and Marketing Budged Planning.
Financial Indicators and Financial Statement Analysis. Ineight Estimate Software for CAPEX Estimation.

Social Responsibility
ATLAS GROUP Galapagos Islands, ECU
Project Coordinator –(Professional Services) May -July 2020
Project : Galapagos Islands´s Renewable Energy Systems

• Evaluation of the technical feasibility for dismantling and lifting of the Galapagos Islands´s Eolic Generators for their
maintenance.
• Planning of the lifting plan resources for a 500 ton crane.
• Coordination with the logistics department for the mobilization of lifting equipment for the operation.
• Supervision of the lifting operation in the Galapagos Islands.
• Design and Maintenance of new Off Grid PV System.
UNIVERSIDAD DE LAS FUERZAS ARMADAS-ESPE Quito,ECU
PM-Project Coordinator March 2019-March 2020

Project : Fortalecimiento de Habilidades Técnicas para huérfanos de la fundación Henry Davis

• Managed the Initiation, Planning, and Execution, Control and Closing phases according to the PMBOK of the
PMI (Project Management Institute).
• Implemented Agile Project Management Methodologies such as Scrum and Sprint
• Managed a budget of $ 10,000, as well as the coordination of training days by the ESPE University for the benefit
of the Foundation.
• Supervised the project development using Microsoft Project based on budged indicators and a schedule by WBS.

Referencias
Nicolas Vanier Mihael Teterea
Project Manager -CSA Superintendent Senior Mechanical Engineer
Lundin Gold- G Mining Services GMining Services
+1 (819) 993 1452 +1 514 929 9346

Luis Aleman Ing. Daniel Gonzales


Senior Project Engineer Distribution Supervisor
Lundin Gold- G Mining Services Lafarge Holcim -Ecuador
+593 992957929 +593 99069 9225

Ron Hochstein
Lundin Gold- CEO
Recommendation Letter
(Under request)

You might also like