23260-Fire and Life Safety
23260-Fire and Life Safety
CONTENT
1. Introduction ............................................................................................................................................................. 1
General ...................................................................................................................................................................... 1.1
Stakeholders .............................................................................................................................................................. 1.2
Scope and Purpose .................................................................................................................................................... 1.3
Source of Information ................................................................................................................................................ 1.4
2. Building Description and Classification .................................................................................................................... 2
Building Description .................................................................................................................................................. 2.1
Building Classification ................................................................................................................................................ 2.2
Construction Classification ......................................................................................................................................... 2.3
3. Building construction Structural Requirements ....................................................................................................... 3
General ...................................................................................................................................................................... 3.1
Balcony Safety ............................................................................................................................................................ 3.2
Construction requirements for windows ................................................................................................................... 3.3
Compartmentation Requirements ............................................................................................................................. 3.4
Fire compartment and fire zoning ………………………………………………………………………………………………………………………..3.5
External walls Fire rating ............................................................................................................................................ 3.6
Facade Approval Requirements ................................................................................................................................. 3.7
Fire Dampers .............................................................................................................................................................. 3.8
1. INTRODUCTION
1.1. GENERAL
This report presents the concept design fire and life safety strategy to be adopted within the Madinat 1.4. SOURCE OF INFORMATION
Jumeirah Living Phase 4 located in Um Suqeim Third Dubai. The project consists of 4 residential towers This document has been prepared based on the updated information provided by NEC received on
Shared with common ground floor and podium levels. The December 2021 which includes Architectural plans of the building and NEC modifications for Building 12.
The Residential building divided into B+G+9 (B12), B+G+9 (B13), B+G+9 (B14), B+G+9 (B15) and consists of:
• Basement level - Parking, MEP, water tank, and fire pump room This report has been compiled together utilizing the following information presented FLS DRAWINGS to confirm that the
• Ground level – Residential Unit, Parking, MEP, Lobby and Emergency fire command center Architectural layouts confirms to the fire and life safety requirements
• First level – Residential Unit Dictated the UAE Fire and Life Safety Requirement as per the following list:
• Second level – Residential Unit
• Third level – Residential Unit
• Fourth level - Residential Unit
• Fifth level - Residential Unit
• Sixth level - Residential Unit
• Seventh level - Residential Unit
• Eighth level - Residential Unit
• Ninth level – Residential Unit SI NO FLOOR LEVEL DRAWING NO
• Roof level – MEP spaces 1 Basement level MJL-PH4-O-FLS-21001
The report highlights the necessary fire and life safety measures required to ensure that the design of 2 Ground level MJL-PH4-O-FLS-21002
The Residential building meets the fire and life safety functional requirements detailed within the UAE 3 First level MJL-PH4-O-FLS-21003
Fire Life Safety Code 2018 and applicable international codes and standards. 4 Second level MJL-PH4-O-FLS-21004
5 Third level MJL-PH4-O-FLS-21005
6 Fourth level MJL-PH4-O-FLS-21006
1.2. STAKEHOLDERS 7 Fifth level MJL-PH4-O-FLS-21007
The main stakeholders involved in the development of the residential building are presented in Table 1: 8 Sixth level MJL-PH4-O-FLS-21008
9 Seventh level MJL-PH4-O-FLS-21009
DEVELOPMENT OWNER MJL 10 Eighth level MJL-PH4-O-FLS-21010
PROJECT MAIN CONSULTANT NEXT Engineering Consultants 11 Ninth level MJL-PH4-O-FLS-21011
PROJECT FIRE CONSULTANT NEXT Engineering Consultants 12 Roof level MJL-PH4-O-FLS-21012
Table 2 List of Architectural Drawings
AUTHORITY HAVING JURISDICTION Dubai Civil Defense
Table 1 Development Stakeholders
Table 5 Structural Fire Rating for Residential building as per the UAE Fire and Life Safety Code
Building 12 ht. : 34.35m Building 13 ht. : 34.35m Building 14 ht. : 34.35m Building 15 ht. : 34.35m
Figure 02: guard Rail requirements extract from UAE Fire and Life Safety Code
In addition to above; the UAE Fire and Life Safety Code specifies specific areas where Compartmentation
should be in place, this is due to the UAE
Fire and Life Safety Code considers the areas as rooms with higher hazards than the remainder of the building:
Staircases must be constructed of RCC concrete for more than 15m in height. Each Stair shall be separated
with 2-hour fire separation from rest of the building.
Any opening or penetration in compartment walls should not breach the integrity of the compartment wall;
therefore, doors in a compartment wall must have an appropriate fire resistance to maintain the integrity of
the compartment wall.
Any building services penetrating a compartment wall would need to be fire stopped or sealed to ensure that
there are no breaches in the compartments they separate.
The compartment wall should form a complete barrier between the compartment they separate, and
therefore needs to continue from slab to slab, including floor and ceiling voids where provided.
ETS ROOM Fire separation not required EXPECTED NUMBER OF PEOPLE MINIMUM NUMBER OF EXITS
>1000 4
Table 12 Minimum number of Exits
BETWEEN RESIDENTIAL AND INDUSTRIAL 1 Hour Fire Separation Residential unit main door 60 minutes Not required Not required
BETWEEN RESIDENTIAL AND STORAGE 1 Hour fire separation Exit stair 90 minutes Required Required
BETWEEN INDUSTRIAL AND ASSEMBLY 1 Hour fire separation Exit passageway 90 minutes Required Required
STORAGE FROM ASSEMBLY 1 Hour Fire Separation Exit corridor of 1-hour fire
60 minutes Required Required
rating
RESIDENTIAL UNIT FROM CORRIDOR 1 Hour Fire Separation Garbage room 60 minutes Required Required
Table 9 Separation of Occupancies – as per the UAE Fire and Life Safety Code Chapter 1 Table 1.2
Table 13 Door Requirements
Note: THROUGH
DIRECTLY TO THE
STAIR NO DISCHARGE LEVEL INTERIOR OF COMPLIANCE
• Doors in bedroom or internal room’s doors shall be not less than 810 mm in width OUTSIDE
BUILDING
• The main exit door for the residential unit shall be not less than 915 mm in clear width
Building 12
• Bathroom doors shall be not less than 710mm, unless they are serving persons with severe mobility
Impairments, where the required width shall not be less than 810mm Stair 1 Ground floor
• Main door width of a balcony, not used for assembly, shall be not less than 810mm Stair 2 Ground floor
• Where pair of door leaves provide in single leaf shall be not less than 810mm
Building 13
Table 14 Dimensional criteria for stairs The 50% Exit discharge is code complaint. Physical separation shall be provided in ground level from basement.
Note:
3.6 External walls Fire rating
• Handrail extensions shall be minimum 305mm in top landing and minimum 280mm in bottom landing External wall shall have the fire resistance rating as per the table 9 as provided below.
• Handrails in stair shall be not less than 865mm and not more than 965mm The imaginary line shall be placed at a distance from the facing exterior wall of the building that is equal to the
• Guardrails shall be not less than 1200mm high. In case of stair handrail that part of a guard, the height horizontal separation applicable for that wall based on its fire resistance rating and protection openings.
can be reduced to 1065mm Where two or more buildings are located on the same plot, the horizontal separation shall be measured from
• Where staircase width exceeds 1.75m, an intermediate handrail shall be provided. (Access stair to the exterior wall to an imaginary line or notional boundary drawn between the exterior walls of the adjacent
the fire pump room) buildings.
COMPONENT CAPACITY FACTOR (MM) Si No. Occupancy 0-1.5 m 1.5 -3 m >3m -9m
Type
Stairway width per person (mm) 7.6mm 1 Residential 1 hr 1 hr 0
Table 11 : Horizontal Separation
Corridor width per person (mm) 5.0mm
Table 15 Egress Width capacity factor
As per UAE Fire and Life Safety Code, Fire dampers shall be required in the following locations:
3.7 Facade Approval Requirements
Core of the facade material shall be tested in exposed form as per test requirement of UAE Fire and Life Ducts and air-transfer openings penetrating walls or partitions having a fire resistance rating of 2 or more
Safety Code requirements. hours.
Ducts and air-transfer openings penetrating shaft walls having a fire resistance rating of 1 or more hours.
Façade panel as product shall be tested as per the test requirement of UAE fire and Life Safety Code
requirements.
Façade system as wall assembly shall be tested as per the test requirement of UAE fire and Life Safety Code
requirements. Curtain wall, perimeter joints and fire stopping shall be a listed system. Cavity fire barrier
bands shall be provided in concealed cavities between façade and primary substrate, at every slab. Fire
breaks shall be provided vertically on exterior façade. Exterior sprinklers should be considered for the
balconies having combustible façade. Interior window sprinklers shall be considered for the glazing
Façade installation shall be inspected throughout installation process and certified by consultant or Civil
Defense.
The below table highlights the test standards that the material and wall assembly should be tested to:
4. MEANS OF EGRESS
4.1 General
The general principle to be followed when designing for means of egress is that occupants confronted by Any door assembly in means of egress shall be of the side-hinged or pivoted-swinging type and shall be
fire within a building can turn away and safely escape. installed to be capable of swinging from any position to the full-required width of the opening in which it is
Therefore, provisions of means of warning and alternative escape/egress routes should be made available installed. The force required to fully open any door leaf manually in a means of egress shall not exceed 67
from all parts of the building. N to release the latch, 133N to set the leaf in motion, and 67N to open the leaf to the minimum required
width.
The total capacity of the means of egress must be sufficient for the occupant load to allow for an easy flow Door leaves required shall swing in the direction of egress travel unless the door serves an area with an
of escaping occupants. The occupant load in any building or portion shall be not more than the number of occupant load of less than 50 people. In these places, such as individual offices, storage rooms, pantries or
persons determined by dividing the floor area by the occupant load factor assigned to that use. toilets, the doors located in egress access passageways may open inwards.
The egress routes shall be continuously maintained free from all obstruction or impediments to provide full Panic exit devices shall be provided on doors that serve more than 100 occupants; this includes staircase
instant use in case of fire or other emergency. No furnishing, decoration, or other objects shall obstruct the final exits, and areas of assembly such as canteens etc.
exits or the exit access.
ITEM REQUIREMENTS
ITEM REQUIREMENTS
As the plot area not exceeds 20,000 m2. Dedicated Private fire
Maximum Parking distance of fire vehicle to building entrance Fire Hydrants hydrant system is not required. Fire hydrant shall be covered as
Access to Buildings shall not exceed 15 meters part of master development
The residential building largest floor plate area is 17,300 m2. Wet Riser Required Minimum 6.9 bars Pressure
Hence the fire vehicle access road required 1/4 perimeter of 60 minutes. Fire water tank shall be provided with 2
the building Water Storage Capacity compartments
Road Width – 6m. Fire vehicle access shall be not less than 2 m
and not more than 10 from the building edge Fire pump room shall be located at lowest level with in 6m and
Dimensions of the Access Road
Vertical Clearance - 4.5m Fire pump room visible location from exits of the ground floor.
The primary power supply to main electrical fire pump and the
Street Slope Shall not exceed 1:10` Power supply jockey pump shall be directly from the power utility company,
Maximum Dead end allowed on fire access way is 45 meters. in a dedicated distribution board located inside the pump
Where fire vehicle access way dead end exceeds 45 meters, room.
Dead End a turning facility shall be provided.
Fire pump controller shall have approved soft starter
Table 20 Access Road Requirements
Fire pump capacity Fire pump capacity shall be not less than 2000 GPM.
Breeching inlet shall be provided in 2 separate locations
Breeching inlet remotely located. Fire water tank shall be provided with
separate breeching inlet for water refilling capacity
6.2.2 Combined Wet Riser and Sprinkler System: 6.4 Fire Pump location and Arrangement
The sprinkler water demand shall be calculated based on the hydraulic calculations according to the
Fire Pumps shall be restricted to a centrifugal or Horizontal Displacement, single stage and multistage
occupancy hazard classification, density of water discharge and design AMAO (Assumed Maximum
pumps of Horizontal or Vertical Turbine shaft type only.
Area of Operation) of sprinklers as stated in Table 17.
Fire pumps shall be dedicated to and listed for fire protection service.
Hand line hose stream water demand shall be added to the sprinkler water demand according to the type
All fire pumps, complete with driver, control panel and fuel supply shall be tested as an assembly and
firefighting hose system proposed based on the occupancy classification as specified in the below table.
registered and listed by Civil Defense.
However, if the fire water supply is combined for both sprinkler and stand pipe wet riser system, the fire The complete fire pump unit shall be field acceptance tested for proper and intended performance.
water demand shall be established as follows:
In the buildings fully protected by an automatic sprinkler system, the fire water demand established for the The net pump shutoff (churn) pressure plus the maximum static suction pressure, adjusted for elevation,
wet riser system is permitted to serve sprinkler system without adding additional water demand in it. shall not exceed the pressure for which the system components are rated.
If the wet riser system demand calculated exceeds the sprinkler system demand including the hose stream A centrifugal fire pump shall be selected to operate at less than or equal to 150% of the rated capacity.
allowance, the larger of the two-demand value shall be proposed depending on the hazard. The selection of fire pump shall be such that the pressure in the system it is serving shall not exceed
24bar at any point, at any time with fire pump set to cut-off at 140% of rated operational pressure.
Fire Pumps shall have a permanent steel nameplate clearly showing the name, brand, pressure ratings, flow
ratings and working temperatures etc.
All fire pumps shall have a flooded water supply from the dedicated firewater tank. Where the flooded
positive supply of water to fire pumps is not possible, the vertical turbine-type fire pumps shall be provided
for the negative suction of firewater. The fire pump provided for fire protection shall be a set consisting of:
• Electric Driven Fire Pump,
• 1 Diesel driven fire pump and
• 1 Jockey pump to maintain the system pressure, complete with controllers.
Diesel fire pumps shall have a diesel filtration system to prevent the stagnation and frequent changing of
diesel fuel.
Fire Pump set shall be located at the lowest level of the system in the building, or at the ground floor with
fire access, pumping water upwards into the system.
Elbows and tees with a centerline plane parallel to a horizontal split-case pump shaft shall only be
permitted in the suction line where the distance between the flanges of the pump suction intake and the
elbow and tee is greater than 10 times the suction pipe diameter.
• Extinguisher shall be
placed inside the
room next to exit.
Authorized person shall intimate the occupants on voice alarm system/public address system about the
situation.
Positive alarm sequence (Positive Alarm Delay) shall be followed. If the alarm is not silenced by authorized
personnel or FACP is not reset within 15 seconds, or multiple alarms are triggered from
other initiating devices within 180 seconds, then the entire fire floor, entire floors above fire floor and
1 floor below fire floor shall have evacuation alarm. Security or facility management personnel or
authorized person shall intimate the occupants on voice alarm system/public address system about the
situation.
If the alarm is not silenced by authorized personnel or FACP is not reset or multiple alarms are triggered from
other initiating devices within 240 seconds, then the entire building shall have evacuation alarm. Security or
facility management personnel or authorized person shall intimate the occupants on voice alarm
system/public address system about the situation.
Where reliable conditioned commercial power and/or emergency power is not anticipated and in areas
subjected to severe lightning, a UPS must be configured to protect the fire alarm central control
equipment, and peripheral printers and terminals, against brownout and voltage transients. Upon utility
power failure, the UPS must provide power to all connected loads.
All fire extinguishers shall be inspected immediately after the installation and periodically at regular intervals
7.2 General Design Requirements
Fire alarm control panel shall be approved and listed by Civil Defense.
not more than 30 days.
Parking area shall be provided with 13-gallon wheeled type foam Lift hoist way pressurization shall be provided, as a one-hour fire rated lobby
extinguishers and 4 kg Multipurpose dry powder has not been provided.
Fire Extinguishers
Electrical/ Telephone room/Lift machine room/ AHU room/ Mechanical Mechanical makeup air shall be not less than 85% of the extract air.
plant room/ RMU/ Switch gear room -shall be provided with 5kg co2 or 5 kg
clean agent type. Make-up air shall not exceed an inlet velocity of 5 m/s.
HV room/Transformer room/ Electrical heavy equipment and machinery The mechanical smoke purging system shall be designed to achieve 10 air
shall be provided with 12 kg co2 wheeled type changes per hour in a single smoke zone of not more than 3600 m 2,
assuming a single smoke zone is active at any single point in time.
Sprinkler and wet riser system shall be provided as per the UAE Fire and Life Emergency lighting shall be provided with central monitoring type or
Safety Code Chapter 9. central battery system with dedicated control equipment and computer
Emergency Lighting
interfacing shall be provided. E min. 1.1 lux and E avg. 10.8 lux shall be
Sprinkler system shall be provided throughout the building, Residential - light provided.
hazard sprinkler coverage shall be not more than 21m2. Parking ordinary Exit Signage Exit signage shall be provided in the corridor, staircase door and final exit.
hazard sprinkler coverage shall be not more than 12 m2 Gaseous LV room, MV room, Main Electrical room, Main Telephone room, Emergency
Suppression System command centre area exceeds 10 m2.
Wet riser system shall be provided and shall cover any part of the building Foam system Generator room
within 30 meters
Water spray system Transformer room not owned by power utility company.
Fire lift shall be provided in a dedicated RCC shaft. Minimum dimension of
Fire Sprinkler System Wet riser shall be interconnected at high level.
a fire lift car shall be adequate to accommodate an ambulance stretched
& Wet Riser 610mm by 2134mm with not less than 127mm radius corners, in the
Fire hose cabinet shall be provided within in 6 meters from the staircase. Fire Lift
horizontal, open position.
Balcony sprinklers shall be provided.
The fire lift shall have access to every habitable floor within the building
Fire Command Centre shall be a minimum of 19 m2 with minimum
Sprinkler shall be provided in top of the staircase and below the lowest
dimension of 3 m on any side.
Landing
The entrance to the command centre shall be on the exterior of the
Motorized zone control valve shall be provided for sprinkler system since the Emergency
building along the Fire Access way. Where such an entrance is not
building height exceeds 23 metres command centre
feasible, fire command centre shall be at the main entrance lobby of the
building.
Fire Alarm system shall be provided as per the UAE Fire and Life Safety Code
Chapter 8.
Proposed emergency command centre location is acceptable,
Smoke detection shall be provided throughout the building. Bedrooms shall
be provided with smoke detector and sounder base 9. LPG REQUIREMENTS
NO LPG System, as all cookers are electric.
Fire alarm control panel shall be located at emergency command centre.
10. CONCLUSION
Fire Pump, all building fire suppression systems, Fire Water Level, LP Gas NEC have prepared fire and life safety drawings using the latest architectural backgrounds and updated
Fire Alarm and detection, CO Monitoring and other interconnected systems like door layouts that have been issued Schematic Design package and confirm that provided that the requirements
Detection release, Elevator recall, Smoke Control etc. shall be interfaced with Fire highlighted within this report are implemented, the building would be classified as code complaint with regards
Detection and Alarm System to the UAE Fire and Life Safety code 2018 Edition, DCD submission will be prior to Final Design DDA Submission.
Activation of the Fire Detection and Alarm System shall only trigger floors of
evacuation alarm, at fire floor, 3 floors above and at 1 floor below. General
Fire Alarm shall not be required to trigger entire building evacuation alarm
or general Fire Alarm