WTG LOCATION OPTIONAL DRAWING

Location No-CsmA 2| Site-PE AK PoME R Date O2|2o22


Platform Size- So x S0 M Boom Assembly areaSize- 2s X1ED M Tagline Length- 100 M 8 B R

G
TeGLIAE North

DP YeRD ./1N Norto.

RAMP Foundation

9o MTR
7A LINE

BooM .
CRANE A-REA

6d MTR

Check Points-
1. Please Mark Platform in the alignment with North Direction with respect to
2. Please Mark Boom Assembly Area in the alignment with North Direction withFoundation.
respect
to Foundation.
3. Please Mark USS in the
alignment with North Direction with respect to Foundation.
4. Please Mark Location Entrance road in the alignment with North Direction with
5. Please Mark Tower and Blade Assembly/preparation area in the alignment withrespect to Foundation.
North Direction with
6.Please mark Lifting area in the alignment with North Direction with respect to Foundation. respect to Foundation.
7. Please mark Obstacles(Electric Line, Tree, Borewell,
Well, pond) if any available at location in the
respect to Foundation. alignment with North Direction with
8. Please mark Tagline (Rope Pulling area for Tower, Nacelle, Hub and Blade) in the
Foundat ion. alignment with North Direction with respect to

Remark if any-
PATH IAY NEED To BE DEV LDP %
a TAG LINE ftNAISED
JDo T
MTR (2 coCYns
-

R D6
Side

8ENDetLD WPandonci
, 7PRABHnlbaRp
Mechanical Civil
Electrical