Professional Documents
Culture Documents
Disclaimer Statement
●
●
Introduction
Statement of Confidentiality
All recipients must treat this Request for Information (RFI) as confidential and shall not disclose any part of the docu
party other than recipient's
MedcoEnergi will keep all responses to this Request for Information (RFI) confidential, exercising reasonable care to
only to people involved in this process
Disclaimer Statement
This is a Request for Information (RFI) only and cannot be treated as a legal or business commitment between the C
the Contractor / Information Provider. The intended use of this RFI is to obtain sufficient information regarding the p
suppliers and market information in supplying the materials/services that may be required by the Company in the n
Information provider shall bear its own costs and expenses in response to this RFI. Nothing herein shall create an ob
Company to do business with the Contractor / Information Provider.
All information provided to Company shall be treated as confidential. It will be made available only to Company emp
involved in this process
General
a. This document is part of Medco E&P Indonesia Request for Information on your services/products and price
b. Please carefully read the instructions and all sections of the RFI, and be sure you understand it completely
Activity
Completion and submission date
d. Please send an email to the following email, confirming the reception of the Request for Information (RFI) d
Contact Name
Aryo Soerjo Dwi Sapoetro
Hanna Aritonang
Ridho Akbari
Zulfitrawan
Budi Agustiono
e. Please address any questions related to this process to the same contacts
f. Please edit the file name by inserting your company name <yourcompanyname_MEPI RFI Lifting Equipment
(E.g. PT ABC_MEPI RFI Lifting Equipment.xlsx)
g. Please use the yellow cells for your input on following sheets:
1. Vendor Information
2. Vendor Capability
3. Price
i. Please answer all questions as completely as possible. Please do not substitute brochures, catalogues or ann
j. Please do not alter the spreadsheet or tables in any way as this may impact our ability to evaluate your resp
l. Should required, other required documents shall be compiled one separated PDF file
m. In case any required clarifcation, please log in "RFI Clarification" excel file then send it back through email t
4 PM Jakarta time. Company will response accordingly.
Instructions
Date
Friday, December 2, 2022
confirming the reception of the Request for Information (RFI) document and your intent to respond
Company
Medco E&P Indonesia
Medco E&P Indonesia
Medco E&P Indonesia
Medco E&P Indonesia
Medco E&P Indonesia
ollowing sheets:
ecific sections
possible. Please do not substitute brochures, catalogues or annual reports in lieu of answers to our questions.
n any way as this may impact our ability to evaluate your response
d verifiable
s will be treated confidentially by Medco Energi
n "RFI Clarification" excel file then send it back through email to Company at the latest Monday, 28 November 2022
ccordingly.
ructions
t completely
Time
4:00:00 PM (Jakarta)
Email
aryo.sapoetro@energibiz.com
hanna.aritonang@medcoenergi.com
ridho.akbari@medcoenergi.com
zulfitrawan@medcoenergi.com
budi.agustiono@medcoenergi.com
ng Equipment.xlsx>
Reference:
1. Scope of Work
EXHIBIT A .pdf
of Works
Field
Company Name
Corporate Name
Main activities of the company
Parent Company (if applicable)
Address
CIVD (SPDA) Status (Valid until xxx)
Contact Person 1
Name
Position
Telephone (include country and area code)
Mobile (include country and area code)
E-mail
Contact Person 2
Name
Position
Telephone (include country and area code)
Mobile (include country and area code)
E-mail
Vendor Information
Description
Description
Description
Description
Description
Description
Vendor input (to be filled)
Incomplete
Incomplete
Vendor Capability
For this section, we would like to understand the capability for the specified specifications. If available, we would also like to understand the potential/alternative specification. Please note that the
technical specifications and administration requirement stated in this section are indicative as per current business planning and may changed accordingly to fulfill new business requirements.
1. Equipment Availability
Ketersediaan Peralatan Standby?
1 Forklift
Kapasitas angkat : Minimum 5 ton
Daya mesin : Minimum 60 HP
Bahan bakar : Solar
Attachment : - Standard fork/mast
- Tinggi fork/mast forklift pada saat off
maksimum 2.85 meter
2 Wheel Loader/
Kapasitas angkat : Minimum 7 ton
Fork
Kapasitas bucket : Minimum 2,5 M3
Daya mesin : Minimum 190 HP
Bahan bakar : Solar
Attachment - Bucket
- Fork (ukuran minimum 200 cm x 125 cm)
4 Rough Terrain
Kapasitas angkat : Minimum 50 ton
Crane
Daya mesin : Minimum 200 HP
Bahan bakar : Solar
Perlengkapan standar, seperti hook, shackle,
sling belt, webbing sling, tali kendali, tongkat
Attachment : kendali beban, kayu slap (kayu balok) untuk
leveling unit crane dan perlengkapan standar
lainnya.
5 Crewler Crane
Kapasitas angkat : Minimum 50 ton
Daya mesin : Minimum 200 HP
Bahan bakar : Solar
Perlengkapan standar, seperti hook, shackle,
sling belt, webbing sling, tali kendali, tongkat
Attachment :
kendali beban dan perlengkapan standar
lainnya.
Contractor shall provide minimum 1 contract completion (certificate or completion report) for
Rental Lifting Equipment Services Agreement in the last seven (7) years.
Please include the following details:
i) Client (and ultimate client if subcontracted)
(ii) Contract/ Project / field name
(iii) The date that provision of the services under that appointment commenced
(iv) The date that the provision of the services under that appointment was completed
(v) Brief description of the services provided
(vi) Value of the services
Note:
For KD calculation reference, Contractor to submit the highest value of similar contract
experience.
C Contractor SPDA (CIVD) Certificate Contractor shall submit valid Contractor's SPDA
Pricing
Vendor input
(to be filled)
IDR -