Change Request- CR 03_Consolidated requirements Lot-1

Business Proposal:
CR 03_Consolidated requirements Lot-1
To
The Nations Hospital

Submitted by
NAPIER HEALTHCARE SOLUTIONS (INDIA) PRIVATE LIMITED

Nov 08, 2021


Validity- 10 days

Strictly Confidential & Proprietary. Only for Internal Use of Project


Copyright © 1996-2021 Napier Healthcare Solutions Pte. Ltd. All Rights Reserved.
1
Change Request- CR 03_Consolidated requirements Lot-1

Contents
1.0 Executive Summary......................................................................................................... 3
2.0 Scope of Work ................................................................................................................. 3
3.0 Milestone & Deliverables ................................................................................................. 3
4.0 Delivery Timeline ............................................................................................................. 3
5.0 Commercials ................................................................................................................... 4
6.0 Payment Remittance Instructions .................................................................................... 4
7.0 Contact Details ................................................................................................................ 5
Annexure A - High Level Solution ....................................................................................... 6

Strictly Confidential & Proprietary. Only for Internal Use of Project


Copyright © 1996-2021 Napier Healthcare Solutions Pte. Ltd. All Rights Reserved.
2
Change Request- CR 03_Consolidated requirements Lot-1

1.0 Executive Summary

Napier’s Healthcare Solution HIS 19.3.1 is currently deployed at The Nations Hospital (TNH). The
Nations Hospital management wants Napier to enhance the functionality of the HIS as mentioned
in the scope and High level solution of Annexure-A
In this process TNH team has approached Napier for the solution. With reference to discussion
held and mail received from The Nations Hospital on 30th October 2021, Napier is hereby
submitting the proposal for the enhancement requested.

2.0 Scope of Work

It is mutually agreed that the “Scope of Work” of this change request as below:

 Requirement analysis and documentation by interviewing IT Team.


 System enhancement
 Functional and integration testing
 Implementation and remote training to IT staff
 Production support and final signoff

Please refer to “Annexure A” for high level solution for each of the following enhancements:
1. Require Interim summary Bill
2. IP bill modification for Cash Patients
3. IP bill modification for TPA/Insurance
4. OPD medicine wise breakup with GST bifurcation report
5. Bed charge schedule timing change
6. Discount information in op bill print against item wise
7. Need to have move to package option

3.0 Milestone & Deliverables


1) Requirement analysis - Understanding document/excel format
2) Application Enhancement - Executable file
3) Implementation & go-live - UAT Scenarios

4.0 Delivery Timeline


The delivery Timeline will be communicated to The Nations Hospital IT team upon the work order
and payment received by Napier

Strictly Confidential & Proprietary. Only for Internal Use of Project


Copyright © 1996-2021 Napier Healthcare Solutions Pte. Ltd. All Rights Reserved.
3
Change Request- CR 03_Consolidated requirements Lot-1

5.0 Commercials

Description of Service Price (INR)


Application Enhancement for The Requested Change 6,90,000
CGST@9% 62,100
SGST@9% 62,100
Grand Total 8,14,200
Total Price (In Words): INR Eight Lakh Fourteen Thousand Two Hundred Only

Note: This proposal is valid for 10 calendar days from the date of submission.

Terms and Conditions

 Price quoted is in Indian Rupees.


 Payment is subject to 100% advance after proposal acceptance.
 The above project requires 2 weeks of resource mobilization.
 All payments are to be made in favor of “Napier Healthcare Solutions (India) Private
Limited” by wire transfer to Hyderabad, mentioned in the contact section of this proposal.
 Any additional Professional Services which are not stated in and required The Nations
Hospital shall be classified as VO (Variance of Order) and chargeable from Napier to The
Nations Hospital, such as Training, Data Migration (if applicable), Onsite UAT and Go-Live
support, Documentation (Test Plan or scenario, User Manual) and etc.
 Out of Pocket Expenses (OPE) will apply in the event Napier resource is required to be onsite
for this CR related activity. The Nations Hospital shall provide formal request to Napier.
 UAT scenarios must signed-off by the customer prior to go-live.
 Acceptance sign-off must be provided within 3 business days after the delivery, otherwise it
will be considered as a deemed signoff.
 Taxes and other statutory levies shall be borne by Customer.

6.0 Payment Remittance Instructions

Beneficiary Details
Napier Healthcare Solutions (India) Limited.

Strictly Confidential & Proprietary. Only for Internal Use of Project


Copyright © 1996-2021 Napier Healthcare Solutions Pte. Ltd. All Rights Reserved.
4
Change Request- CR 03_Consolidated requirements Lot-1

A/c. No. 762609458 with Indian Bank, Himayat Nagar


IFSC CODE: IDIB000H008

7.0 Contact Details

Company

Napier Healthcare Solutions (India) Private Limited


1st Floor, Western Aqua, Hi-Tech City,
Whitefields, Kondapur,
Hyderabad – 500 081
avinash.keshri@napierhealthcare.com
www.napierhealthcare.com

Strictly Confidential & Proprietary. Only for Internal Use of Project


Copyright © 1996-2021 Napier Healthcare Solutions Pte. Ltd. All Rights Reserved.
5
Change Request- CR 03_Consolidated requirements Lot-1

Annexure A - High Level Solution

Requirement Description
Require  Require IP Interim/Provisional summary Bill print for Cash bill
Interim  Require IP Interim summary Bill print for insurance/payer bill
summary Bill  Summary bill shall be like final bill summary bill like primary
service group wise.

To achieve the above solution, need to do the following changes in the


existing application

 To be developed a new Provisional bill Summary bill print a separate


button
 Role task permission to be provided based on the permission shall
be displayed to print...
 It should be equal to IP final bill summary bill
 Posted services Primary service group wise summary total amounts
to be displayed
 Shall be provided a PDF print

IP bill  Any Summary Bill is not possible to generate at the time of


modification provisional basis & same problems should be arise
for Cash  "Batch No.", "Expiry Date", "Manufacturing Date" etc. are not
Patients mentioned in any Pharmacy & Consumables head (item basis). As
per IRDA guideline that should be mandatory to mention in the final
bill for each & every patient's final bill.
 As per our bill structure there have completely merged with
PHARMACY & CONSUMABLES head, but as per guidelines by
IRDA dept. such consumables items should not be payable
according to depend upon on case to case basis, For this reason
request to separate the "PHARMACY" & "CONSUMABLES" heads
shown in the final bill by our HIS
 Till IMPLANT charge were shown in our final bill under the head of
"PHARMACY & CONSUMABLES", but it will be shown in a
separate head at our final bill (like: - IMPLANT/DEVICE/LENS
etc...)
 At the time of billing card updating for individual patient based ,
does not too easy access for "MINIMIZE" or "MAXIMIZE" for any

Strictly Confidential & Proprietary. Only for Internal Use of Project


Copyright © 1996-2021 Napier Healthcare Solutions Pte. Ltd. All Rights Reserved.
6
Change Request- CR 03_Consolidated requirements Lot-1

Medicines & Consumables items (quantity, share, date, hour etc.)


in our HIS as per doctor advice.

 If possible to activate the access for "PDF" scanner in the


Billing work bench, as a discount letter (with signed & stamped by
authorized signatory/ mail copy/ WhatsApp etc.) should be attached
to individual account closing at the time of discharge.
To achieve the above solution, need to do the following changes in the
existing 1

 A separate supplementary bill print can be provided with the details


"Batch No.", "Expiry Date", "Manufacturing Date"
 Separate the "PHARMACY" & "CONSUMABLES" heads shown in
the final bill print

 Will provide remarks column in the discount section


OPD medicine  Tax related all the information will be provided in the existing
wise breakup (PHARMACY GST BIFURCATION-Sales And Returns.csv )
with GST report including HSN
bifurcation  Nation team will use the pivot option and generate the reports.
report
To achieve the above solution, need to do the following changes in the
existing application

 Will provide the HSN code information in the existing PHARMACY


GST BIFURCATION-Sales and Returns. Reports.

Bed charge  Bed Charges to be posted day based , Cut off base
schedule  No Half day Charges
timing change  If the patient admitted today on 4th October at 11:30 p.m. and
discharged at 5th Early morning 6:00 p.m. bed charges should be
calculated for 2 days
 It should work based on the Configuration Cut off.
 Cut off time shall be configured 11.55 PM.
 If the patient is admitted on the same day any time and discharging
on the 11:55 Pm before shall charge 1 day. And if the patient
discharging next day before 11:59 Pm shall charge additional full
day. Total 2 days charges.

To achieve the above solution, Needs to configure the Cut off bed charge
configuration.

 Cut off functionality needs to set up as 11:55 Pm as cut of time.


 System will calculate day based bed charges.

Strictly Confidential & Proprietary. Only for Internal Use of Project


Copyright © 1996-2021 Napier Healthcare Solutions Pte. Ltd. All Rights Reserved.
7
Change Request- CR 03_Consolidated requirements Lot-1

IP bill  Any Summary Bill is not possible to generate at the time of


modification provisional basis & same problems should be arise
for  "Batch No.", "Expiry Date", "Manufacturing Date" etc. are not
TPA/Insurance mentioned in any Pharmacy & Consumables head (item basis). As
per IRDA guideline that should be mandatory to mention in the final
bill for each & every patient's final bill.
 As per our bill structure there have completely merged with
PHARMACY & CONSUMABLES head, but as per guidelines by
IRDA dept. such consumables items should not be payable
according to depend upon on case to case basis, For this reason
request to separate the "PHARMACY" & "CONSUMABLES" heads
shown in the final bill by our HIS
 Till IMPLANT charge were shown in our final bill under the head of
"PHARMACY & CONSUMABLES", but it will be shown in a
separate head at our final bill (like: - IMPLANT/DEVICE/LENS
etc...)
 At the time of billing card updating for individual patient based ,
does not too easy access for "MINIMIZE" or "MAXIMIZE" for any
Medicines & Consumables items (quantity, share, date, hour etc.)
in our HIS as per doctor advice

 If possible to activate the access for "PDF" scanner in the


Billing work bench, as a discount letter (with signed & stamped by
authorized signatory/ mail copy/ WhatsApp etc.) should be attached
to individual account closing at the time of discharge.
To achieve the above solution, need to do the following changes in the
existing application
 A separate supplementary bill print can be provided with the details
"Batch No.", "Expiry Date", "Manufacturing Date"
 Separate the "PHARMACY" & "CONSUMABLES" heads shown in
the final bill print

 Will provide remarks column in the discount section.

Discount in OP  In Pharmacy OTC bill print , Discount is showing summary level ,


Bill Print needs to display the discount applied in material wise in bill print
 Rate X Qty = Amount + tax – Discount=Net amount .Net amount is
always MRP for Nation but the reversal (amount+tax-Discount)
shall calculate properly.
 Material level discount shall match with summary bill.
Formulas

Tran rate (RATE) (AMOUNT/(CGST + SGST +100)) * PV

TAX=RATE-MRP

Strictly Confidential & Proprietary. Only for Internal Use of Project


Copyright © 1996-2021 Napier Healthcare Solutions Pte. Ltd. All Rights Reserved.
8
Change Request- CR 03_Consolidated requirements Lot-1

To achieve the above solution, need to do the following changes in the


existing application

 Need to add discount % and Discount amount columns in the bill


print against each material wise.
 Total discount shall match with individual item discount amount.
 Against individual item when discount is applied, Amount column
display the less discount amount.

Need to have  While package amendment need an option to change the start
move to date and allow less than current
package  During the customized package Shall allow exclusions to
option inclusions and shall consider the package date from package
assignment
 In Customized package needs to display all the services with the
information package inclusion and exclusion , - a separate screen
should be developed
 System shall allow to modify include and exclude within the
package days and shall consider to the bill as per the custom
package -

To achieve the above solution, need to do the following changes in the


existing application

 Package assignment screen (Regular package) shall have an option


to select the package start date. The selected date shall become
package assignment date.
 Package start date shall allow previous date equal or greater than
admission date shall allow till current date
 In custom package user will change the number of previous date
based on that package inclusion and exclusion will calculate.
 New Custom package screen shall be created (like same the same
custom package screen) in this screen will display all the services
details with these columns (Service code, Service name, Service
date , service rate , qty amount combo with PC,PE,RG information
(RG =Other than package included services , PE =Included but limit
exceeded by date rage or amount range ,PC=Package Considered
services).
 User will change the PC to PE and PE to PC, when we change PE to
PC, shall not charge separately it should include in the package cost.

Strictly Confidential & Proprietary. Only for Internal Use of Project


Copyright © 1996-2021 Napier Healthcare Solutions Pte. Ltd. All Rights Reserved.
9
Change Request- CR 03_Consolidated requirements Lot-1

Assumptions
 Napier will develop the application from offshore.
 Napier will support the implementation activities from offshore

The Acceptance to the above Proposal is indicated by the Parties by signing the below
portion:

For Napier Healthcare Solutions (India) For The Nations Hospital


Private Limited

Name: Name:
Designation: Designation:
Date: Date:
Place: Place:
Seal: Seal:

Strictly Confidential & Proprietary. Only for Internal Use of Project


Copyright © 1996-2021 Napier Healthcare Solutions Pte. Ltd. All Rights Reserved.
10

You might also like