DOCUMENTATION JASA PEMBUATAN TANGKI 8000L PT.

MEDION

K3 : Safety HARI / TGL : Rabu ,27 Desember 2023


CUACA : Cerah HARI KE : 2/23
No Documentation Description

1 Drawing Design

2 Material Visit

3 Material Visit

4 Material Visit

5 Marking Mild Stell 4 Segment (2 pcs)


DOCUMENTATION JASA PEMBUATAN TANGKI 8000L PT.
MEDION

K3 : Safety HARI / TGL : Kamis ,27 Desember 2023


CUACA : Cerah HARI KE : 2/23
No Documentation Description

6 Cuting galvanized pipe 1 1/2 inch to size 12 mm

Joint flange 1 1/2 inch with galvanize pipe 1 1/2


7
inch using ARGON welding (6 pcs)

8 Cutting Mild Stell 4 Segment (2 pcs)

9 Cutting Mild Stell 4 Segment (2 pcs)

10 Cutting Mild Stell 4 Segment (2 pcs)