Waktu Pelaksaanaan ( Master Schedule)

Engineering Construction
Fabrication Erection Inspection and Testing

1 bulan 4 bulan
1 bulan 3 bulan 1 bulan

Detail Calculation
Drawing Submitting
- Standart
Manufacturing
Process ( SMP) Fabrication and Erection
Procedure Document
Dokumen QC (ITP)
Commissioning

2 minggu

Commissioning