You are on page 1of 1

50 200

40 120 40
75 50 CLEAR COVER
75 250
250
45 75
170
170 4NOS.
25 G 4-10 Q
T T @85C/C
2L-8 Q
T STS.@85C/C 2L-8 Q
10 Q
T
50
183 170
F F 83 9NOS. 8 STS.@85C/C
50
NON SHRINK READYMIXED GROUT FIXED END 100
E E FREE END 75
"CONBEXTRA GP2" OR EQUIVALENT
170
170 4NOS. 2L-8 Q
T STS.@85C/C
1100
10 Q
T G
SECTIONAL ELEVATION
50
SCALE-1:15
182 T 2NOS. a
12Q
82
50 T 2NOS. b
12Q
170
170 4NOS. T STS.@85C/C
2L-8 Q
10 Q
T
30
150 250
100 50 250
45 25 75 75
20 2L-8Q
T@85C/C T
4-10 Q
CONSTRUCTION JOINT 20
CONSTRUCTION JOINT 40
200 200 80 120
200
200
20 20 40
FREE END
NON SHRINK READYMIXED GROUT
PLAN FIXED END
12 Ø HOLE
200
DECK SLAB a 200
DETAIL OF PRECAST HANDRAIL
b DECK SLAB
25 150 150 SCALE-1:15
25
160 160
325 325
25 MM DRIP SECTION THROUGH POST SECTION THROUGH POST
(FOR GENERAL ARRANGEMENT) (FOR REINFORCEMENT DETAIL)
56 88 56
SCALE-1:15 SCALE-1:15 120
56 30 60 30
8Q
T BINDER 30
@85C/C 4-12 Q
T
250 138
170 4-10 Q
T
110
2L-8 Q
T @85C/C
56 30
CHAMFER
CHAMFER 200 10X10
10X10 SECTION G-G
SECTION E-E SCALE- 1:10
200 SCALE- 1:10
250 FREE END 120
75 45
4-10 Q
T 4-12 Q
T T
4-10Q
2L-8 Q
T @85C/C
25
CHAMFER
25 20 10 X 10
10 250 170
80 120
10
25
20 25
FIXED END CHAMFER
50 150 50 2L-8 Q
T @85C/C 10 X 10 SECTION F-F SECTION G-G
8Q
T BINDER T
4-12 Q
SCALE-1:10 SCALE-1:10 RAILING :
@85C/C
1. REINFORCEMENT OF RAILING POST SHOULD BE SUITABLY ANCHORED IN DECK SLAB.
REINFORCEMENT ARRANGEMENT OF HAND RAIL & POST
SCALE-1:10
DETAILS OF HANDRAIL & POST 2. CASTING OF POST SHALL BE DONE IN SINGLE POUR AFTER ACCURATELY POSITIONING THE PRECAST HANDRAIL.
3. RAILING SHALL BE CONSTRUCTED ONLY AFTER THE STRUCTURAL CONCRETE OF SUPERSTRUCTURE HAS HARDENED
AND SHUTTERING IS RELEASED.
4. EXPANSION GAPS IN RAILING SHALL BE PROVIDED AT THE SAME LOCATIONS AS IN THE DECK SLAB.
NOTES :
1. ALL DIMENSIONS ARE IN mm. UNLESS OTHERWISE NOTED.
TITLE : MISC DRAWING 1
SCALE
DISTRICT: EAST CHAMPARAN DRAWN BY: R.V. DATE :NOV., 2023
DEVELOPMENT OF RURAL EXECUTIVE ENGINEER, SUPERSTAR DESIGNER PVT. LTD.
CONSTRUCTION OF HL BRIDGE AT NH28B TO BALUA TICKULIA AS SHOWN
ROADS/BRIDGES IN THE STATE OF RURAL WORKS DEPARTMENT, PATH AT CHAINAGE 12 KM IN EAST CHAMPARAN DIST.
DESIGNED BY: S.R. CONSULTANT & ENGINEERS
BIHAR WORKS DIVISION CHECKED BY: PATNA REV. - 0

You might also like