Professional Documents
Culture Documents
PC-II FORM
GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
PC-II FORM
PROFORMA FOR DEVELOPMENT PROJECTS
(SURVEY AND FEASIBILITY STUDIES)
1
- Permanent Population
- Visiting Population
- Floating Population
Prime Minister of Pakistan Mian Mohammad
Nawaz Sharif during a meeting on 01.09.2015
regarding beautification of Murree directed that
“Existing Water/Sewerage Channels should be
repaired to stop seepage. An innovative system to
be devised on modern lines for sewerage and
drainage. Therefore it has been decided to procure
Engineering Services of well reputed and
competent consulting firm/JV for preparation of
Master Plan , detailed engineering design, working
drawings, tender documents, detailed estimates,
BOQ’s, tender documents and preparing EIA, for
sewerage and Drainage system of Murree city and
vetting of design by foreign consultant.
CLIMATOLOGICAL DATA:-
JUSTIFICATION:-
At present no system exists for the drainage of
domestic/commercial sewage and storm water in
the Murree City area. Sewage is disposed off
through lined / unlined drains constructed by local
2
bodies and these drains either disposed of on the
hills directly or terminated in the natural hill torrents
around the inter periphery of the city. The sewage
either seeps down in the crest of hills or
contaminating the water bodies in the hill torrents.
Especially at the western side of Murree sewage
flows up to the Haro River and contaminating its
water. Seeping down of sewage and storm water in
the hill causes frequent landslides and
contaminating hill torrents. The implementation of
project is justified because of following benefits
and outcomes.
a. Better living condition and improved sanitation
in the city.
b. Reduction on water borne diseases.
c. Environment will be greatly improved.
d. To safe guard city buildings and roads from
flooding and frequent landslides.
e. To protect natural springs and water bodies
around Murree City from Contamination which
will improve water swage at downstream.
f. Safe disposal of storm water.
g. Waste water treatment reuse and safe
disposal.
h. Explore possibility of power generation from
the treated waste water collected at
appropriation location.
GENERAL ISSUES ETC:-
The implementation of project will provide better
living conditions and improve sanitation and control
water born diseases, as a result the environment
will greatly improved. The second most important
aspect of the project to safeguard city and city
roads from landslides.
The main objective of the project is to provide an
improved sewerage and drainage system and to
control land sliding due to infiltrated sewerage and
drainage water, further eliminate the breeding
places for mosquitoes and other bacteria carrying
diseases. Thus a clean environment will improve
public health standards of the city, which will be
followed by improved economic activity.
The completion of the project will control pollution
of the city. The Treatment Plants will improve the
municipal sewerage water quality which is being
thrown into Haro and Korang rivers on one side
and to Simly lake on other side causing
environmental hazard to the river area on the
downstream drinking water supply schemes. The
implementation of project will reduce the menace
of water born diseases in the local city population,
3
as well as in downstream localities.
The aim of hiring consultant is to ensure high
quality construction of all the components of works
in accordance with the engineering designs,
drawings, technical specifications, terms &
conditions of the Contract Agreement: -
OBJECTIVES
The objective of the TOR is to define the scope of
services to be provided by the selected consulting
firm/JV hereinafter called the “Consultant”
necessary for the satisfactory and complete
implementation of the Project “SEWERAGE AND
DRAINAGE SYSTEM FOR MURREE CITY
hereinafter called the “Project”.
TERMS OF REFERENCE
This TOR defines the scope of the agreement to
be drawn between the consultant and “ PHED”
hereinafter called “Client”.
THE PROJECT
The “PROJECT” is design & construction of
“SEWERAGE AND DRAINAGE SYSTEM FOR
MURREE CITY “The salient features of the project
is as under: -
SCOPE OF SERVICES
Consultancy services are required to undertake
Master Planning up to 2035, Hydrological and
hydraulic study, detail engineering design,
feasibility study and preparation of PC-1 also
bidding documents and bid evaluation reports for
sewerage, drainage and wastewater treatment
plants for Murree city including any other Study
required for the assignment for entire satisfaction
of the Client Department.
The government of Punjab through PHE
Department has undertaken two studies for the
Murree City. The consultant will specifically review
the feasibility study for water supply conducted by
Associated Consulting Engineers in the year 1988.
Further Pakistan Engineering Services (pvt) Ltd
has completed “Feasibility Studies & Master Plan
for Murree City” in the year 1999. Further, the
consultant should obtain literature on Shimla City
(India) related with sanitation projects and include
best practices in the proposed Murree Sanitation
System.
Further, the consultant will consider / undertake the
issues / suggestions / recommendations received
from Universities and public sector.
4
SURVEYS & INVESTIGATIONS
The consultant will acquire remote sensing data
like digital elevation model and satellite imagery
for hydrological study and sewer system master
planning.
The consultant will acquire, investigate or
collect all data seem important and required for
study, planning and design like;
Meteorological Data
Soil and Geo-tech investigation
Land-use.
House Hold survey for water-use etc.
The Consultant will carry out preliminary
topographic survey of various sites/ location of
the project sufficient for comparative study of
different options of the project components.
Detailed Topographic Survey will be carried out
for all the components of the project pipelines,
drains and sewer lines etc.) for which detailed
design is to be carried out.
The scale of topographic survey should be 1 to
1000 and contour interval 1.5m.
For sewerage main, routes, strip width should
not be less than 6 meters.
Hydrological Study and Drainage network:
The consultant will carry out detail hydrological
study as a basis for design of drainage scheme
using advance remote sensing techniques and
mathematical modeling.
The consultant will design drainage scheme for
safe outlet of storm water based on 2, 5, 10, 25,
50 and 100yr return periods for different
components of the project.
The consultant will assess the peak runoff
values for drains and streams.
The consultant will design the drainage network
based on state-of-the art computer modeling
techniques / software’s capable of dynamic-
wavy analysis for accuracy and reliability.
The consultant must evaluate all real world
scenarios like combined and separate flow,
peak flow diversions, outfall limitations and
followings or whichever seems necessary for an
affective drainage scheme
Time-varying rainfall,
Evaporation of standing surface water,
Snow accumulation and melting,
5
Rain fall interception from depression storage,
In-filtration of rainfall into unsaturated soil layers,
Percolation of infiltrated water into groundwater
layers,
Interflow between groundwater and the drainage
system,
Nonlinear reservoir routing of overland flow, and
Runoff reduction via LID controls
SEWERAGE NETWORK
The consultant will carry out detail hydraulic
design of sewerage scheme using advance
mathematical models.
The consultant will carry out computer
simulation for pollutants and their removal like;
Entry of dry weather sanitary flows and user-
specified external inflows at any point in the
drainage system
Routing of water quality constituents through
the sewerage and drainage system.
Reduction in constituent concentration through
treatment in storage units or by natural
processes in pipes and channels.
Carrying out necessary surveys, studies and
investigation to prepare detailed design
documents.
Engineering surveys, environmental surveys,
topographical surveys, contour survey, ground
level data, land acquisition and resettlement
plans (if any ) and all other surveys
required for preparation of Master Plans.
SEWAGE TREATMENT PLANT
The consultant will carry out detail feasibility for
preparing master plan of sewage treatment in
the city.
The consultant will evaluate different treatment
technologies most feasible in cold area and
utilizing gravity as energy source.
The consultant will simulate biological or
chemical process of the proposed sewage
treatment plant using advance computer
simulation models like GPS-X etc. as basis of
detail design.
The Consultant will prepare a detail hydraulic
design based on computer simulation
software’s.
The consultant will undertake Economic &
Financial analysis of the scheme. Further the
consultant will also undertake cost benefit
6
analysis, keeping in view the cost incurred in
terms of staff salary. The consultant will review
the staff cost of other similar projects and
incorporate their findings.
4 Expected Outcome Of The Survey The scope of services also includes but is not
Feasibility Study And Details Of limited to:
Projects Likely To Be Submitted To prepare the preliminary design and
After The Survey. preliminary/conceptual working drawing, to
9
suggest technically, socially and
economically viable technology and
processes, implementation strategy,
equipment/ machinery and method for
efficient and economical services prior to
detailed engineering design for each
subproject
Prepare detailed engineering design and
prepare design/technical report, including
hydraulic models, hydraulic profiles,
engineering calculations of sewerage and
waste water treatment plant , architectural
and structural design and drawings (for civil,
electrical and mechanical works) for projects.
Prepare of drawings, specifications,
summaries, explanatory notes, bill of
quantities, cost estimates and bidding
documents, for all subprojects in the list.
Prepare master plans (Storm-water &
sewerage for Murree) up to 2035 , Review
and update existing feasibility study of
sewerage system
Detail Engineering Design appropriate waste
water treatment plants for Murree after
approval of conceptual design by Client to
cater needs for 2035
Sewerage, storm-water system and treatment
plant to be designed & connected with
SCADA and Radio communication system
To evaluate the condition of the existing
drainage system and proposal for its up-
gradation.
The key deliverables of the consultants for
the detailed design and construction
supervising assignments include the
10
following:
Master Plans & Design Outputs (10 Hard
Copies and 05 Soft Copies PDF and Non-
PDF)
Inception report including work plan (Draft
and Final)
Master Plans for, sewerage and storm-water
up to 2035
Review and Validation report on the existing
master plans/feasibility reports and detailed
feasibility reports of the potential subproject
to be funded through PHED / CLIENT.
Detailed engineering drawings, design,
engineer estimates and tender documents
for, sewerage and waste water treatment
single or sub-projects.
Bid evaluation reports and short listing of
contracting firm to award work.
Detailed Engineering and bidding documents
under Water & Waste Water Master Plans.
GIS city maps
Survey Maps
5. SCHEDULE OF SUBMISSION OF
DOCUMENTS AND MODE OF
PAYMENT
Superintending Engineer
Public Health Engineering Circle
Rawalpindi.
Checked By:
Chief Engineer (North)
Public Health Engineering Department
Lahore
12