HOW - IDEAS ONLINE DIGITAL TWIN
MRI of the Process Plant
Plant/Asset-
Specific Data
Anomaly Detection
Data Validation & Reconciliation • Transmitter Drifts
• Model based DVR to detect faulty • KPIs away from normal operating
transmitters range
4 / ANDRITZ (BUSINESS AREA) / PRESENTATION NAME AND DATE / © COPYRIGHT (IF REQUIRED) – ARIAL BOLD, ALL CAPS, 8 PT, BLUE, ALIGN LEFT
ONLINE DIGITAL TWIN ARCHITECTURE
• Mass Balance • Optimal setpoints
• Performance (KPI’s) • Data Validation & Reconciliation
• • What-if scenarios
Virtual Transmitters Model • Advice & Alarms
• Current Plant operating conditions
• Equipment Efficiencies Adaptation • Predictions
ONLINE MODEL: An Online DT model running with real time DCS data as input (Data frequency of per sec/per min)
PARELLEL MODEL: A copy of the model running within the online model, with select inputs manipulated by the optimiser to maximise/minimise the desired
objective function (Profit, inputs/outputs, losses etc.)
MODEL ADAPTATION: A regular/scheduled check of synchronization between the online model and the parallel model as per actuals to ensure model accuracy.
INPUTS :
OUTPUTS :
• $$ 𝐹𝑒𝑒𝑑 𝑊𝑎𝑡𝑒𝑟
• $$ 𝑆𝑡𝑒𝑎𝑚 𝑡𝑜 𝑡𝑢𝑟𝑏𝑖𝑛𝑒
• $$ 𝑀𝑎𝑘𝑒 − 𝑢𝑝 𝑆𝑜𝑑𝑎
• $$ 𝑆𝑚𝑒𝑙𝑡 𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑒𝑑 𝐶ℎ𝑒𝑚𝑖𝑐𝑎𝑙𝑠
• $$ Soot blowing Steam
• $$ Flue Gas Emissions
MANIPULATED VARIABLES :
• 𝐵𝑙𝑎𝑐𝑘 𝐿𝑖𝑞𝑢𝑜𝑟 (𝑓𝑢𝑒𝑙) Optimization Objective = Maximize Objective function by changing
• 𝐶𝑜𝑚𝑏𝑢𝑠𝑡𝑖𝑜𝑛 𝐴𝑖𝑟 Manipulated Variables within defined Constraints
• 𝑃𝑟𝑖𝑚𝑎𝑟𝑦, 𝑆𝑒𝑐𝑜𝑛𝑑𝑎𝑟𝑦, 𝑇𝑒𝑟𝑡𝑖𝑎𝑟𝑦
• Makeup Soda Objective Function = 𝑀𝑎𝑥 𝑃𝑟𝑜𝑓𝑖𝑡 𝑇𝑜𝑡𝑎𝑙 𝑅𝑒𝑣𝑒𝑛𝑢𝑒𝑠 $$ – 𝑇𝑜𝑡𝑎𝑙 𝐶𝑜𝑠𝑡 $$
Total Revenues = 𝑓(Steam Production, Smelt Recovered Chemicals)
Total Cost = 𝑓(𝐹𝑒𝑒𝑑 𝑊𝑎𝑡𝑒𝑟, 𝑆𝐵 𝑆𝑡𝑒𝑎𝑚, 𝑀𝑎𝑘𝑒𝑢𝑝 𝑆𝑜𝑑𝑎, 𝑁𝑂𝑥 𝑎𝑛𝑑 𝑆𝑂𝑥 𝑃𝑒𝑛𝑎𝑙𝑡𝑦)
CONSTRAINTS :
• 𝐿𝑜𝑤 < 𝑀𝑎𝑖𝑛 𝑠𝑡𝑒𝑎𝑚 𝑡𝑒𝑚𝑝 < 𝐻𝑖𝑔ℎ
• 𝐿𝑜𝑤 < 𝐹𝐺 𝑇𝑒𝑚𝑝 < 𝐻𝑖𝑔ℎ
• Low < Excess O2 < High OPTIMAL Maximize
• Low < Reduction Efficiency < High SETPOINTS PROFIT = $$ - $$
Daily Reports
KPI Calculations
Optimization
Performance Monitoring
IDEAS Model
Error Analysis
Gross Error Detection
and Elimination
ANDRITZ experts work with customers all along to customize the application
3 Months
4 Months Remote
Monitoring
6 Months
5 Months
2 Confidential Customer, USA Evaporation Plant Ongoing R&D, Major KPIs Configured 2018