You are on page 1of 9

MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.

Office of The Executive Engineer,


EHV(O&M) Division, Kalwa, Bramhaputra Building, 2nd floor, Power House Complex,
Post Box No 4, Thane-Belapur Rd., Airoli, Navi Mumbai- 400708.
E-mail ID - eekalwa@gmail.com/ ee7120@mahatransco.in
No.EE/EHV/O&M/DN/KLW/T-26/53 Date:- 05.01.2024
SAP Contract No.- 4600014346
Date- 05.01.2024
To,
M/s. Zen Eneterprises,
Room No. 5, Devkar Chawl, Ramdaswadi,
Kalyan West, Dist.: Thane – 421301.
Email-zenenterprises2011@gmail.com

Sub.:– 50% Extension to work order for work of annual maintenance contract for
attending maintenance & emergency / breakdown work at various Substations
under EHV(O&M) Division, Kalwa for the year 2023-24.

Ref.: – 1] T.O. Re-Tender No.:- EE/EHV(O&M)/Dn./KLW/TENDER/14/2023-2024.


2] RFx. No. 7000026821.
3] Contract No. 5700004158
4] Agencies consent letter No. Nil dt. 04.12.2023.
Dear Sir,
With reference to the above this is to inform that, your bid for the work of annual contract
for engaging outsourced agency for attending annual maintenance & emergency/breakdown work at
various Substations under EHV O&M Dn. Kalwa is accepted with details as per schedule ‘A’
attached herewith subject to following terms & conditions & terms & conditions of this office
tender documents under reference [1].
1] Value of work contract:
On the basis of the estimated quantity mentioned in the Schedule “A” the total cost of the
contract to be executed by you is Limited to contract value Rs. 9,96,761.76/- (Rs. Nine Lakh
Ninety Six Thousand Seven Hundred Sixty One & Paisa Seventy Six Only) inclusive of
GST & cess. The said value is inclusive of all material, T&P, labour & transportation charges
taxes etc. up to site.
2] Execution of work under this contract :
a] You will have to execute the work as per instructions & under supervision of Substations In-
charge. Work should be carried out as per PWD & MSETCL’s works and specifications.
b] No Tools will be provided to you. All manpower as well as T&P & all material required for the
job will be arranged by you.
3] Period of work: Up to 31.03.2024. Time being the essence of the contract the time limit shall
be strictly adhered to.
4] Penalty: If the work is not carried out within stipulated time, you will be liable for penalty @
1/2% per delayed week or part thereof subject to maximum upto 10% of the contract value
excluding GST and subject further to ‘Force Majeure’ conditions. 18% GST will be extra
charged.
5] Security Deposit : Security deposit of Rs. 99,676/- shall be paid by you in the form of
FDR/bank guarantee. In the event of unsatisfactory performance of the contract this amount
shall be forfeited. SD/bank guarantee will be refunded after satisfactory completion of work.
-- P. T. O. --
_______________________________________________________________________________________________
Regd. Office: “Prakashganga”, Plot No. C – 19, “E” Block, Bandra – Kurla Complex, Bandra [E], Mumbai – 400 051
6] Submission of bills : After the completion of work as per work order you will have to submit
bills in triplicate in the name of E.E.EHV O&M Dn., MSETCL Kalwa along with advance
stamp receipt, work sheet, certificate from the Engineer-in-charge for having completed the
work satisfactorily must be submitted.
7] Payment : Payment in the form of R.A. bills for each substation for the work actually carried
out will be given to you [after deducting I.T./W.C.T. & other applicable taxes as per Govt.
rule] by cheque against receipt of the bills as above certified by the work In charge for
[
satisfactory and timely work completion subject to availability of funds.
8] You shall be abiding with all Govt. Rules statutory, regulations, status for this work including
workman compensation act. Any deviation will be at your cost and risk.
9] The insurance of your labours will have to be done at your cost. If failed to do so, any
compensation or claim arise will be at your responsibility.
10] Payment Authority : E.E. EHV O&M Dn., Kalwa.
11] The registration of your works with sale tax office is necessary under the work contract rule,
1986 and WCT if applicable will be deducted from your bill as per rule.
12] Work should not be carried out in Electrically Live AREAS. before carrying out work it should
be ensured that live lines/equipment are completely isolated from mains as per I.E. rules.
13] Any accident compensation, damages, losses to the MSETCL property and person will have to
be fully indemnified. In that case the decision of the undersigned will be final and binding on
you.
14] All statutory rules and regulations of MSETCL work contract are also applicable for this
contract.
15] You will be responsible for safety of your employees and also safety of the, MSETCL’s
property. If any damage occurs to the MSETCL’s property or person during the execution, of
contract you will be have repair it at your own cost. Further, while executing the work if any
accident occurs to the outsider or your employee the compensation for the same shall be given
by the contractor & MSETCL will not bear any responsibility for the same.
16] Agreement for the work on stamp paper of Rs. 500/ - is to be submitted. Until the agreement is
executed, the MSETCL will not be liable to pay, nor shall the contractor be entitled to claim
amount due or payable under the contract. The agreement should be executed before
starting of work. The necessary stamp duty for the agreement shall be borne by the
contractor.
17] EXECUTION OF THE WORK: Immediately after receipt of the work order, the contractor
shall take prompt action in planning the work in consultation with the respective Substation In-
charge of various substations. He should also take steps for timely procurement of the
necessary material and tools and plant. The program should be finalized quickly and the
respective Substation In-charge of various substations should be approached to make the
structures/ equipment safe for works wherever necessary. Having finalized the program the
schedule shall be strictly adhered to, as arranging frequent outage is not possible. The work
should be carried out to the full satisfaction of Executive Engineer.
18] MATERIAL APPROVAL & SUPERVISION OF THE WORKS:
The works shall be under the overall supervision & shall be subject to the approval of the
Executive Engineer, concerned or his designated representative. The material to be used in
execution of the works must be got approved from the Executive Engineer EHV (O&M)
Dn. Kalwa and only approved material should be used.

---PTO—
_______________________________________________________________________________________________
Regd. Office: “Prakashganga”, Plot No. C – 19, “E” Block, Bandra – Kurla Complex, Bandra [E], Mumbai – 400 051
19] Operating Authority: - This contract will be operated by the respective Substation In-charge
of various substations for their respective works.

20] CONTRACTOR’S EMPLOYEES:


The contractor shall employ and provide onsite only such employees who are skilled and
experienced for execution and supervision of works. The contractor shall provide housing
accommodation to his employees. He shall also be responsible for any injury/accident to his
employees. Payment of compensations etc. as may required to be paid eventually shall be
borne by the contractor himself. The contractor should ensure that his staff uses the requisite
safety equipment. The employees should be duly insured against any such eventuality. The
proof of insurance should be submitted to this office along with order acceptance letter.

21] SITE CLEARANCE:


The contractor shall, during the progress of work, keep the site reasonably free of all
unnecessary obstructions and shall store the material neatly so as not to cause any obstruction
for normal working/operations. Similarly on completion of the works, the contractor shall clear
away and remove from the site all surplus materials, rubbish, and temporary work of any kind.
The site should be kept clean.

22] SUB-LETTING OF CONTRACT: The contract, or any part thereof shall not be assigned,
transferred, or sub- let without the prior written permission of the undersigned. Even if such
permission is granted, it shall be the responsibility of the principal contractor to whom the
work order was originally issued, to execute the works as per the terms of the contract.

23] INSURANCE: The contractor has to do the insurance before starting of work from
government insurance fund for the total value of the order plus 10% to cover freight sales
tax and other incidental charges & for workmen engaged to complete the contract work
under appropriate insurance policy from United India Insurance Co. Ltd., as per the address
given below. The insurance premium shall be paid by the contractor at his cost.
M/S United India Insurance Co. Ltd.,
Divisional Office, Shanti Center, Room No. 5/6/12,
Sect. 17, Vashi, Navi Mumbai -400703.
Ph. 022-27653215/27891194/27894736

24] No accommodation / transportation will be given by MSETCL to any agency.

25] TAX DEDUCTION AT SOURCE: In accordance with Income Tax Act 1961 I.T. will be
deducted at source at the prevailing rates from the bills. Similarly, any other taxes deductible
at source such GST & cess, if applicable to this particular contract, as per statutory provisions
(laid down by Central or State Government) will also be deducted from the bills at the
prevailing rates.

26] TERMINATION OF CONTRACT: The undersigned reserves the right to cancel the contract,
after giving due notice to the contractor, in the event of the breach of contract in any respect.

27] APPLICABILITY OF GENERAL CONDITIONS OF CONTRACT: Notwithstanding


anything stated herein, the Board’s General Terms and Conditions of Contract shall be
applicable to the contract, as far as they are applicable to this contract.

28] JURISDICTION: All disputes, differences related to the tender/contract shall be subject to the
exclusive jurisdiction of Thane District Court/High Court Mumbai.

--PTO--
_______________________________________________________________________________________________
Regd. Office: “Prakashganga”, Plot No. C – 19, “E” Block, Bandra – Kurla Complex, Bandra [E], Mumbai – 400 051
29] If you are agreeable with above terms and conditions please communicate your acceptance
within 7 days from the date of receipt of this letter falling, which the order will be treated as
accepted by you.

Thanking you,

Yours faithfully,

--Sd--
Executive Engineer,
EHV O&M Dn., Kalwa.

Copy s.w.r.to –
The Superintending Engineer, EHV O&M Circle, Kalwa.

Copy to –
1] The Substation In-charge, Kamba, Bhiwandi, Mumbra, Bapgaon, Mahape & Temghar
substations.-- for information & necessary action.

2] The Dy. Manager [F&A], EHV O&M Dn., Kalwa.

_______________________________________________________________________________________________
Regd. Office: “Prakashganga”, Plot No. C – 19, “E” Block, Bandra – Kurla Complex, Bandra [E], Mumbai – 400 051
SCHEDULE - ‘A’

Rate
S. SAC Service GST @ Amount
Description of Service Unit Qty Rates including
N. Code No. 18% (Rs.)
GST

220 KV & 100KV Side


Replacement of jumper connection (to 18 492.4 88.63 581.03 10458.58
attend hotspot) with its removal with
spacers from the equipment terminals
1 995469 50002019 with removal of connector and its re- EA
erection with provided terminal clamps
at both ends : For single conductor

Replacement of jumper connection ( to 18 983.99 177.12 1161.11 20899.95


attend hotspot) with its removal with
spacers from the equipment terminals
2 995469 50002019 with removal of connector and its re- EA
erection with provided terminal clamps
at both ends : For Twin conductor

18 602 108.36 710.36 12786.48


Replacement of jumper connection
with its removal with spacers from the
3 995469 50002019 Main Bus from Isolator sits re-erection EA
with provided terminal clamps at both
ends : For Single conductor
18 1083.9 195.10 1279.00 23022.04
Replacement of jumper connection
with its removal with spacers from the
4 995469 50002019 Main Bus from Isolator sits re-erection EA
with provided terminal clamps at both
ends : For Twin conductor
Removal of Defective /Faulty 220 KV 4 2918.93 525.41 3444.34 13777.35
CT/PT unit from support structure with
5 995469 50000031 removal of teminal connections & EA
Jumpers and cable connections from
secondary boxes.
Errection of 220 KV CT/PT unit on 4 3649.06 656.83 4305.89 17223.56
provided support structure WITH
NECESSARY MODIFICATIONS &
6 998736 50000036 EA
connecting teminal connections &
Jumpers from both sides and cable
connections from secondary boxes.
Dismentalling of Defective /Faulty 198 4 2918.93 525.41 3444.34 13777.35
KV LA from the support structre with
7 998736 50000130 removal of jumper from terminal EA
connector & stacks with removal of
earthing connections & LA Counter .
Errection of 198 KV LA on given 4 3649.06 656.83 4305.89 17223.56
support structre with minor
modification with stacks ,insulator base
8 998736 50000140 EA
,with leveling connecting terminal
connector & jumper connection with
connecting LA Counter .
Dismantalling of faulty /damaged 1 24327.1 4378.88 28706.00 28706.00
/defective 245kV Breaker with 2
9 998719 50000156 complete removal of sf6 /oil & removal SET
of complete mechanisam ,pole ,piping
etc.

_______________________________________________________________________________________________
Regd. Office: “Prakashganga”, Plot No. C – 19, “E” Block, Bandra – Kurla Complex, Bandra [E], Mumbai – 400 051
Errection of 245kV Breaker with 1 38011.0 6841.98 44853.00 44853.00
modification of equipment structre as 2
per approved drawing & errection of
support structre & MB,Pole ,Pipe
10 998736 50000172 SET
Cabling & Termination upto pole.
Earthing of MB & Filling of SF6
Pressure as directed by MSETCL In-
Charge
2 4670.9 840.76 5511.66 11023.32
Dismentaling 220kV Suspension Wave
11 998736 50003142 EA
trap with insulator string
1 4379.24 788.26 5167.50 5167.50
Dismentaling 220kV Pedestral Wave
12 998736 50003142 EA
trap with removal of jumper

Errection of 220 kV Suspension Wave 3 7298.02 1313.64 8611.66 25834.99


13 998736 50001981 EA
Trap with insulator string

Erection 220kV Pedestral Wave trap 1 4866.1 875.90 5742.00 5742.00


14 998736 50001981 EA
with removal of jumper
2 2918.86 525.39 3444.25 6888.51
Dismentaling 220kV Coupling
15 998736 50003144 EA
Capacitor
2 3649.05 656.83 4305.88 8611.76
16 998736 50003152 Errection 220kV Coupling Capacitor EA

Removal of 220 kV Jumpers prior 15 732.8 131.90 864.70 12970.56


replacement of faulty /defective
17 995469 50001250 EA
equipment & for diagnostic testing
work (single)
Re-Fixing of 220 kV Jumpers after 15 1141.53 205.48 1347.01 20205.08
replacement of faulty/defective
18 995469 50010131 EA
equipment & for diagnostic testing
work (single)
Removal & refixing of 100 kV 15 332.23 59.80 392.03 5880.47
Jumpers prior replacement of faulty
19 995469 50009250 No
/defective equipment & for diagnostic
testing work (single)
Dismentaling of 220 kV conductor 200 87.85 15.81 103.66 20732.60
spans at Main Bus Level with removal RMT/
20 998719 50006746
of hardware & disc insulator complete PH
set
Stringing of 220 kV Conductor spans 200 81.39 14.65 96.04 19208.04
RMT/
21 998631 50018351 with hoisting disc insulator along with
PH
hardware (single)

Dismentalling of 245 kV Isolator with 3 15569.66 2802.54 18372.20 55116.60


Support Structre ,Insulators,Male
22 998734 50008714 EA
female contacts ,piping and stcking the
same as per MSETCL In-Charge
Errection of 245 kV Isolator without 3 17515.76 3152.84 20668.60 62005.79
Support Structre ,Insulators ,Male
23 995461 50008721 female contacts,piping ,MOM box EA
fixing ,cable laying and termination
with alignment of Isolator
2 1167.8 210.20 1378.00 2756.01
Dismentaling of 220 kV Bus Post
24 998736 50008608 No
Insulator

2 1459.32 262.68 1722.00 3444.00


25 995461 50007334 Errection of 220 kV Bus Post Insulator No

_______________________________________________________________________________________________
Regd. Office: “Prakashganga”, Plot No. C – 19, “E” Block, Bandra – Kurla Complex, Bandra [E], Mumbai – 400 051
Removal of Defective /Faulty 100 KV
CT/PT unit from support structure with
26 995469 50000028 removal of teminal connections & EA 2 1946.33 350.34 2296.67 4593.34
Jumpers and cable connections from
secondary boxes.
Errection of 100 KV CT/PT unit on
provided support structure WITH
NECESSARY MODIFICATIONS &
27 995469 50000033 EA 2 2433.05 437.95 2871.00 5742.00
connecting teminal connections &
Jumpers from both sides and cable
connections from secondary boxes.
Dismentalling of Defective /Faulty 100
KV LA from the support structre with
28 995469 50000127 removal of jumper from terminal EA 2 1946.33 350.34 2296.67 4593.34
connector & stacks with removal of
earthing connections & LA Counter.
Errection of 100 KV LA on given
support structre with minor
modification with stacks ,insulator base
29 998736 50000137 EA 2 2433.05 437.95 2871.00 5742.00
,with leveling connecting terminal
connector & jumper connection with
connecting LA Counter.
Dismentaling 132 kV Pedstal Wave
30 998736 50003143 EA 2 3283.9 591.10 3875.00 7750.00
trap
Errection of 132 kV Pedstal Wave
31 998736 50003151 EA 2 3649.15 656.85 4306.00 8611.99
Trap
Dismentaling 145 kV Coupling
32 998736 50015310 EA 2 1946.33 350.34 2296.67 4593.34
Capciator
Errection of 145 kV Coupling
33 998736 50003153 EA 2 2433.05 437.95 2871.00 5742.00
Capciator
Painting to 220 KV CT/PT (Including
34 998736 50009223 cleaning rusted parts, painting with EA 17 1265.86 227.85 1493.71 25393.15
double coats) (Set of 3 Nos.)
Cleaning of 220KV &100KV Isolator
/CT (Set of 3 Nos.) /PT
35 995461 50011038 (Set of 3 Nos.) /breaker sets (Set of 3 EA 35 535.19 96.33 631.52 22103.35
poles) / LA (Set of 3 Nos.) / T/F
bushing (Set of 3)
Crimping work labour Charges for 220KV
Crimping Single T. connector to 0.4
36 995469 50006542 EA 5 481.95 86.75 568.70 2843.51
ACSR (On emergency basis)

Crimping Double T. Connector to 0.4


37 995461 50006546 EA 5 963.81 173.49 1137.30 5686.48
ACSR (On emergency basis)

Crimping Palm type clamp to 0.4


38 995469 50006543 EA 35 301..41 54.25 355.66 12448.1
ACSR
22 KV Side
39 998736 50001695 Erection of 22KV CT / PT unit No 1 1216.1 218.90 1435.00 1435.00
40 998736 50001714 Removal of CT/PT unit No 1 972.6 175.07 1147.67 1147.67
Erection of 22KV CB Pole
41 998736 50000167 No 1 1216.1 218.90 1435.00 1435.00

Removal of 22KV CB Pole


42 998736 50000151 No 1 972.88 175.12 1148.00 1148.00

43 998736 50001707 Erection of lighting arrester unit No 1 1216.1 218.90 1435.00 1435.00
44 998736 50003946 Removal of lighting arrester unit No 1 972.88 175.12 1148.00 1148.00

_______________________________________________________________________________________________
Regd. Office: “Prakashganga”, Plot No. C – 19, “E” Block, Bandra – Kurla Complex, Bandra [E], Mumbai – 400 051
Dismentaling of 33/22 kV conductor
spans at Main Bus Level with removal RMT/
45 998732 50010122 225 87.84 15.81 103.65 23321.52
of hardware & disc insulatator PH
complete set (TWIN)
Stringing of 33/22 kV Conductor spans
at Main Bus Level with removal of RMT/
46 998631 50003761 50 121.69 21.90 143.59 7179.71
hardware & disc insulatator complete PH
set (TWIN)
Laying of Control / Power cables on existing cable trays in cable trenches with aluminum tags at both ends with binding the
same on cable trays at suitable intervals with dressing, with segregation of Control & Power Cables separate on cable trays
rows as directed, the cables will be provided by MSETCL in drums , the same are required to be transported to required place
and unwounded with turn table smoothly avoiding the damages to the cables

47 995423 50002087 2C X 2.5 m 150 12.09 2.18 14.27 2139.93

48 995423 50002087 4C X 2.5 m 150 18.53 3.34 21.87 3279.81

49 995423 50002087 12 X 2.5 m 150 24.17 4.35 28.52 4278.09

50 995423 50002087 19C X 2.5 m 150 24.17 4.35 28.52 4278.09

51 995423 50005432 3C X 300 SQ.MM Power Cable M 145 44.73 8.05 52.78 7653.30

Dismantling/Removal of Control / Power cables on existing cable trays in cable trenches. Coiling and stacking of dismantled
cable at site store as directed with removal of terminations at both ends with removal of glands etc.

52 995423 50007565 2C X 2.5 m 125 9.67 1.74 11.41 1426.33

53 995423 50007666 4C X 2.5 m 125 14.5 2.61 17.11 2138.75

54 995423 50007567 12C X 2.5 m 125 19.34 3.48 22.82 2852.65

55 995423 50002087 19C X 2.5 m 125 19.34 3.48 22.82 2852.65

Cable end termination at both ends as per termination schedule provided with cable glanding at both ends panels/ MB etc.
with drilling of suitable size holes for cable glands as per cable sizes with spare holes as directed, glanding the cable
with proper size glands to make it tight and firm, checking the cables cores from both side for continuity with suitable
arrangement and providing the cross feruling as per cable schedule to both ends of cable and crimping of suitable size
required lugs as per cable core size with suitable crimping tool making it tight connection and then dressing up the
same in TB's provided in Panels / MB etc. as directed for the following cables with sealing of spare holes ... BY PROVIDING
REQD SIZE LUGS , GLANDS AND FERULES

56 995423 500017813 2C X 2.5 EA 15 213.56 38.44 252.00 3780.01

57 995423 500017827 4C X 2.5 EA 15 274.01 49.32 323.33 4849.98

58 995423 50002987 12 X 2.5 EA 25 394.88 71.08 465.96 11648.96

59 995423 50002987 19C X 2.5 EA 40 394.88 71.08 465.96 18638.34

Making heat shrinkable indoor/outdoor


cable joint at 22kV XLPE Cable by
Per
60 995429 50001830 providing end terminal kit as per 4 8639.83 1555.17 10195.00 40780.00
joint
standard method (Supply + Labour)
(3X 240-400sqmm)

_______________________________________________________________________________________________
Regd. Office: “Prakashganga”, Plot No. C – 19, “E” Block, Bandra – Kurla Complex, Bandra [E], Mumbai – 400 051
Making heat shrinkable indoor/outdoor
cable joint at 22kV XLPE Cable with Per
61 995429 50002101 2 28150.85 5067.15 33218.00 66436.01
supply of Straight Terminal Joint Kit joint
(Supply+Labour) (3X300-400sqmm)
Providing small Crane (Hydra) as per
62 996609 50008140 HRS 50 1012.79 182.30 1195.09 59754.61
Requirement
Removal of Earthwire from Gantry
63 998631 50006670 Peaks with removal of earth Rmt 50 24.17 4.35 28.52 1426.03
tension/suspension hardware

Stringing of Earthwire from Gantry


64 998631 50006744 Peaks with removal of earth Rmt 50 30.63 5.51 36.14 1807.17
tension/suspension hardware

Mobilisation of Gang/Skilled Workers


65 998736 50002525 EA 4 3918.03 705.25 4623.28 18493.10
in case of ermergency

66 995473 50005205 Painting of CT Marshalling Kiosk m2 30 547.99 98.64 646.63 19398.85

99547 Painting of Equipment


67 50005076 Kiosk,ACDB & DCDB EA 10 456.14 82.11 538.25 5382.45
3
99547 Painting of Isolator Marshalling
68 50005206 Kiosk m2 28 547.99 98.64 646.63 18105.59
3
99547 Painting of Marshalling Kiosk at
69 50014523 yard EA 10 438.09 78.86 516.95 5169.46
3
99834
70 50017533 Testing of Hipot of 33kV Cables EA 12 4787.39 861.73 5649.12 67789.44
6
Sub-Total 996767.17

--Sd--
Executive Engineer,
EHV O&M Dn., Kalwa

_______________________________________________________________________________________________
Regd. Office: “Prakashganga”, Plot No. C – 19, “E” Block, Bandra – Kurla Complex, Bandra [E], Mumbai – 400 051