KEYPLAN

13 12 11 10
A B C D E F +21500

800
Emergency Exit

PAVING BLOCK SEGI ENAM WARNA MERAH PAVING BLOCK SEGI ENAM WARNA MERAH

CAMERA CCTV

CAMERA
EL.+0.20M

CCTV
6000 6000 6000 5500 5000

KUSEN ALUMINIUM + KACA


PASS BOX

Sink Wastafel

Sink Wastafel
TERAS

KUSEN ALUMINIUM + KACA

KUSEN ALUMINIUM + KACA

TERAS

SECTION-F Emergency Exit

Line Pipa Shell


Emergency Exit

KUSEN ALUMINIUM + ACRYLIC

Rolling Door
3950

pagar s/s pagar s/s pagar dan pintu s/s

finger screen

LOKET

CAMERA CCTV
pagar s/s

APAR
13 12 11
14 LEGEND
+21500

800
G

DETAIL JOINT BEAM TYP


8100

SECTION-G

H I

13 12 11

13 +18400
F

DRAWING STATUS
4100

+15500
FOR REFERENCE ONLY
12
H SECTION-H
J I J FOR APPROVAL
2000

11
CONTRACT DRAWING
G
APPROVED DRAWING
6000

B C D FOR CONSTRUCTION
+21500 AS BUILT DRAWING

1350
1850
10

+18400 Rev. Description Date Drawn Checked Coord. Approved

SECTION-J
6000

PT. BUMITANGERANG MESINDO


Jalan Dipati unus No.30 RT 001
F Tangerang,Banten 15138
Jawa Barat 41371

13 12
125
9
23 40 40 22
+21500

40 10
PT. TOBA BANGUN INDONESIA
JL.BANGKA RAYA NO 42

60
RT.002 RW 005
6000

220
JAKARTA SELATAN 12170

60
+18400

10 40
2900
Project
8 PT BUMI TANGERANG MESINDO
DETAIL-BASE PLATE HANGER MODIFICATION-MONORAIL-ROASTER
+15500
-AND-ALKALIZER-AREA
Tittle
INSTALLATION
SECTION-I
ADDITIONAL-MONORAIL
PLAN VIEW-ALKALIZER ROASTER-AREA

N.T.S