Contract no. 35150604 QUALITY CONTROL PLAN ATQF0311
Client order no.
Control Activities Verification
# Description of Task Controlling Acceptance Inspection / Test required Intervention Signatures Actual Remarks
Procedure Criteria 1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4 Date:
1 SAT-12 Installation Alignment Report Report X X W E E
2 SAT-07 Torque Check Test Report Report X X W E E
3 SAT-08 Contact Resistance Test Report Report X X W E E
4 SAT-09 Insulation Resistance Test Report Report X X W E E
5 SAT-01 Mechanical & Electrical Check List Report Report X X E E E
6 MCC Handover Certificate Take Over Warranty letter Report X E H H
7 Punch Items Sign off ATQF 1200 X X H
8

Legend Rev. Date Details Approval Date Name and Signature


1) Visual A) Engineering Check SUPERVISOR (1) ABB EPDS
2) Dimensional B) First off Insp.
3) Technical C) Sample Insp. Remarks : Test Technician (2) PROCONICS
4) Paint thickness D) Copy to Client
5) Component check E) 100 % Insp. Representative (3) PROCONICS
6) Mech. assembly H) Hold
7) Functional check W) Witness
8) Customer Handover V)Verify