You are on page 1of 1

+10.

60
+10.00
+7.10
HOLE N.8 EXTRA CHANELS THOMSON OVERFLOW CHANNEL OVERFLOW HOLE OVERFLOW OVERFLOW HOLE N.2 EXTRA CHANNELS THOMSON OVERFLOW CHANNEL
Q = 10800 m3/d Q = 931.5 m3/d Q = 10800 m3/d Q = 5400x2 m3/d Q = 10800 m3/d Q = 5400 m3/d Q = 13500 m3/d Q = 13500 m3/d Q = 13500 m3/d Q = 895.9 m3/d Q = 5400 m3/d Q = 2700x2 m3/d
WL = 0.01 m (each channel) WL = 0.032 m WL = 0.15 m WL = 0.13 m WL = 0.005 m WL = 0.15 m WL = 0.15 m WL = 0.014 m (each channel) WL = 0.032 m WL = 0.12 m
V = 0.35 m/s WL = 0.07 m WIDTH = 80.0 m V = 0.8 m/s WIDTH = 1.5 m V = 0.25 m/s WIDTH = 1.5 m WIDTH = 1.5 m V = 0.43 m/s WL = 0.07 m WIDTH = 43.4 m V = 0.7 m/s
WIDTH = 0.6 m
HEIGHT = 0.6 m
LENGHT = 3.50 m
WIDTH = 0.3 m
LENGHT = 15.8 m
WIDTH = 0.5 m
HEIGHT = 1.1 m WIDTH = 0.5 m
HEIGHT = 0.5 m
16 17 HEIGHT = 0.65 m HEIGHT = 0.65 m WIDTH = 0.6 m
HEIGHT = 0.6 m
LENGHT = 3.6 m
WIDTH = 0.3 m
LENGHT = 16.4 m
WIDTH = 0.4 m
SCREEN
Qmax= 10800 m3/d HEIGHT = 0.2 m HEIGHT = 0.5 m ΔHNOZZLES: 2.13 m HEIGHT = 0.2 m HEIGHT = 0.5 m
WLmax = 0.40 m i = 0.3% (3 mm/m) i = 0.3% (3 mm/m) i = 0.3% (3 mm/m) i = 0.3% (3 mm/m)
+3.70
V = 0.8 m/s
WIDTH = 1.5 m
FROM SLUDGE FROM SLUDGE FROM SLUDGE FROM SLUDGE
+4.00 Qmax =35 m3/h TO RECIRCULATION FACTOR: 1.5
RETURN TANK RETURN TANK RETURN TANK RETURN TANK
THICKENER
+3.40
+3.50 +3.00 +3.00

THICKENER
+3.00 +3.00 +3.00
+2.08 +2.00 +2.00 +2.50
+2.50 +2.50

TO
+1.50 ±0.00 (PLINTH LEVEL)

±0.00 (PLINTH LEVEL) -0.15 (G.L.L) +0.175 -1.425 -0.15 (G.L.L)

-2.225
-2.65 -2.50

-3.50 -3.50

2 -5.00

-6.00
-5.00
-5.40
-5.00 14
4 5 6
SLUDGE SLUDGE
EXTRACTION PIPE EXTRACTION PIPE
7 8 9 10 11 12 13
3 Q = 840 m3/d
WL = 0.08 m
Q = 8100 m3/d
WL = 0.07 m
V = 0.70 m/s V = 0.82 m/s
L=9m L = 9.5 m
De = 140 mm De = 400 mm
Di = 133 mm Di = 380.4 mm
CURVE = 0 CURVE = 0
+10.60
+10.00
+7.10
HOLE N.8 EXTRA CHANELS THOMSON OVERFLOW CHANNEL OVERFLOW HOLE OVERFLOW OVERFLOW HOLE N.2 EXTRA CHANNELS THOMSON OVERFLOW CHANNEL
Q = 10800 m3/d Q = 931.5 m3/d Q = 10800 m3/d Q = 5400x2 m3/d Q = 10800 m3/d Q = 5400 m3/d Q = 13500 m3/d Q = 13500 m3/d Q = 13500 m3/d Q = 895.9 m3/d Q = 5400 m3/d Q = 2700x2 m3/d
WL = 0.01 m (each channel) WL = 0.032 m WL = 0.15 m WL = 0.13 m WL = 0.005 m WL = 0.15 m WL = 0.15 m WL = 0.014 m (each channel) WL = 0.032 m WL = 0.12 m
V = 0.35 m/s WL = 0.07 m WIDTH = 80.0 m V = 0.8 m/s WIDTH = 1.5 m V = 0.25 m/s WIDTH = 1.5 m WIDTH = 1.5 m V = 0.43 m/s WL = 0.07 m WIDTH = 43.4 m V = 0.7 m/s
WIDTH = 0.6 m
HEIGHT = 0.6 m
LENGHT = 3.50 m
WIDTH = 0.3 m
LENGHT = 15.8 m
WIDTH = 0.5 m
HEIGHT = 1.1 m WIDTH = 0.5 m
HEIGHT = 0.5 m
16 17 HEIGHT = 0.65 m HEIGHT = 0.65 m WIDTH = 0.6 m
HEIGHT = 0.6 m
LENGHT = 3.6 m
WIDTH = 0.3 m
LENGHT = 16.4 m
WIDTH = 0.4 m
VENTURI CHANNEL SCREEN VENTURI CHANNEL
Q max= 21600 m3/d Qmax= 10800 m3/d HEIGHT = 0.2 m HEIGHT = 0.5 m ΔHNOZZLES: 2.13 m HEIGHT = 0.2 m HEIGHT = 0.5 m Q max= 10800 m3/d
WL = 0.484 m WLmax = 0.40 m i = 0.3% (3 mm/m) i = 0.3% (3 mm/m) i = 0.3% (3 mm/m) i = 0.3% (3 mm/m) WL = 0.355 m
+3.70
Vmin = 1.22 m/s V = 0.8 m/s Vmin = 1.04 m/s
LENGHTmin = 14 m WIDTH = 1.5 m LENGHTmin = 11 m
WIDTH = 1.0 m +4.00 Qmax =35 m3/h TO RECIRCULATION FACTOR: 1.5
WIDTH = 0.8 m
THICKENER
HEIGHT = 1.9 m +3.40 HEIGHT = 1.5 m
+3.50 +3.00

THICKENER
imax = 0.1% (1 mm/m) +3.00 +3.00 +3.00 imax = 0.1% (1 mm/m)
+2.50 +2.50 +2.08 +2.00 +2.00

TO
+1.20
+1.50 -0.30 ±0.00 (PLINTH LEVEL) HIGHEST
-1.30 -1.80
FLOOD
±0.00 (PLINTH LEVEL) -1.725 +0.175 +0.175 -1.425 -0.15 (G.L.) LEVEL

-2.225
-2.65
INLET CHANNEL
Qmax = 43200 m3/d 1 -3.00 (G.L.)
-3.50 -3.50
WL = 0.327 m -4.00
V = 1.28 m/s
LENGHT = 250 m 1 2 -5.00
WIDTH = 1.2 m -5.00 -5.00
i = 0.25% (2.5 mm/m) -6.00 -5.40
4 5 6 N.2 OVERFLOWS
Q = 10800 m3/d
SLUDGE SLUDGE
WL = 0.17 m
EXTRACTION PIPE EXTRACTION PIPE TREATED WATER TREATED WATER RIVER
7 8 9 10 11 12 13 WIDTH = 1.5 m
±0.00 (PLINTH LEVEL) 3 Q = 840 m3/d
WL = 0.08 m
Q = 8100 m3/d
WL = 0.07 m
HEIGHT = 0.65 m DISCHARGE
(PIPE IN PRESSURE)
DISCHARGE
(PIPE AS CHANNEL)
V = 0.70 m/s V = 0.82 m/s Q = 10800 m3/d WL = <50% OF PIPE
-1.725
L=9m L = 9.5 m WL = 0.43 m V >1 m/s
De = 140 mm De = 400 mm V = 0.70 m/s i = 0.8% (8 mm/m)
Di = 133 mm Di = 380.4 mm L = 300 m
CURVE = 0 CURVE = 0 +1.50 De = 500 mm
+10.60 +1.02 ±0.00 (PLINTH LEVEL) Di = 475.4 mm
+10.00
+7.10 CURVE = 4 (estimated)
HOLE N.8 EXTRA CHANELS THOMSON OVERFLOW CHANNEL OVERFLOW HOLE OVERFLOW OVERFLOW HOLE N.2 EXTRA CHANNELS THOMSON OVERFLOW CHANNEL -0.15 (G.L.)
Q = 10800 m3/d Q = 931.5 m3/d Q = 10800 m3/d Q = 5400x2 m3/d Q = 10800 m3/d Q = 5400 m3/d Q = 13500 m3/d Q = 13500 m3/d Q = 13500 m3/d Q = 895.9 m3/d Q = 5400 m3/d Q = 2700x2 m3/d
WL = 0.01 m (each channel) WL = 0.032 m WL = 0.15 m WL = 0.13 m WL = 0.005 m WL = 0.15 m WL = 0.15 m WL = 0.014 m (each channel) WL = 0.032 m WL = 0.12 m
V = 0.35 m/s WL = 0.07 m WIDTH = 80.0 m V = 0.8 m/s WIDTH = 1.5 m V = 0.25 m/s WIDTH = 1.5 m WIDTH = 1.5 m V = 0.43 m/s WL = 0.07 m WIDTH = 43.4 m V = 0.7 m/s
WIDTH = 0.6 m
HEIGHT = 0.6 m
LENGHT = 3.50 m
WIDTH = 0.3 m
LENGHT = 15.8 m
WIDTH = 0.5 m
HEIGHT = 1.1 m WIDTH = 0.5 m
HEIGHT = 0.5 m
16 17 HEIGHT = 0.65 m HEIGHT = 0.65 m WIDTH = 0.6 m
HEIGHT = 0.6 m
LENGHT = 3.6 m
WIDTH = 0.3 m
LENGHT = 16.4 m
WIDTH = 0.4 m -2.50
VENTURI CHANNEL SCREEN VENTURI CHANNEL
Q max= 21600 m3/d Qmax= 10800 m3/d HEIGHT = 0.2 m HEIGHT = 0.5 m ΔHNOZZLES: 2.13 m HEIGHT = 0.2 m HEIGHT = 0.5 m Q max= 10800 m3/d
WL = 0.484 m WLmax = 0.40 m i = 0.3% (3 mm/m) i = 0.3% (3 mm/m) i = 0.3% (3 mm/m) i = 0.3% (3 mm/m) WL = 0.355 m
+3.70
Vmin = 1.22 m/s V = 0.8 m/s Vmin = 1.04 m/s
LENGHTmin = 14 m WIDTH = 1.5 m LENGHTmin = 11 m
WIDTH = 1.0 m +4.00 Qmax =35 m3/h TO RECIRCULATION FACTOR: 1.5 15 WIDTH = 0.8 m
THICKENER
HEIGHT = 1.9 m +3.40 HEIGHT = 1.5 m
+3.50 +3.00

THICKENER
imax = 0.1% (1 mm/m) +3.00 +3.00 +3.00 imax = 0.1% (1 mm/m)
+2.50 +2.50 +2.08 +2.00 +2.00

TO
+1.20
+1.50 -0.30 ±0.00 (PLINTH LEVEL) HIGHEST
-1.30 -1.80
FLOOD
±0.00 (PLINTH LEVEL) -1.725 +0.175 +0.175 -1.425 -0.15 (G.L.) LEVEL

-2.225
-2.65
1 -3.00 (G.L.)
-3.50 -3.50
-4.00
1 2 -5.00
-5.00 -5.00
-6.00 -5.40
4 5 6
1) "VENTURI" FLOW METER
SLUDGE SLUDGE
EXTRACTION PIPE EXTRACTION PIPE 2) SCREEN TREATED WATER TREATED WATER RIVER
7 8 9 10 11 12 13
3 Q = 840 m3/d
WL = 0.08 m
Q = 8100 m3/d
WL = 0.07 m 3) LIFTING TANK
DISCHARGE
(PIPE IN PRESSURE)
DISCHARGE
(PIPE AS CHANNEL)
V = 0.70 m/s V = 0.82 m/s Q = 10800 m3/d WL = <50% OF PIPE
L=9m L = 9.5 m 4) PRIMARY CLARIFIER FEEDING WL = 0.43 m V >1 m/s
De = 140 mm De = 400 mm V = 0.70 m/s i = 0.8% (8 mm/m)
Di = 133 mm Di = 380.4 mm TANK L = 300 m
CURVE = 0 CURVE = 0 De = 500 mm
+10.60
5) PRIMARY CLARIFIER Di = 475.4 mm
+10.00
+7.10 6) PUMICE EXTRACTION TANK CURVE = 4 (estimated)
HOLE N.8 EXTRA CHANELS THOMSON OVERFLOW CHANNEL OVERFLOW HOLE OVERFLOW OVERFLOW HOLE N.2 EXTRA CHANNELS THOMSON OVERFLOW CHANNEL
Q = 10800 m3/d Q = 931.5 m3/d Q = 10800 m3/d Q = 5400x2 m3/d Q = 10800 m3/d Q = 5400 m3/d Q = 13500 m3/d Q = 13500 m3/d Q = 13500 m3/d Q = 895.9 m3/d Q = 5400 m3/d Q = 2700x2 m3/d 7) STORAGE AND HOMOGENIZATION
WL = 0.01 m (each channel) WL = 0.032 m WL = 0.15 m WL = 0.13 m WL = 0.005 m WL = 0.15 m WL = 0.15 m WL = 0.014 m (each channel) WL = 0.032 m WL = 0.12 m
V = 0.35 m/s WL = 0.07 m WIDTH = 80.0 m V = 0.8 m/s WIDTH = 1.5 m V = 0.25 m/s WIDTH = 1.5 m WIDTH = 1.5 m V = 0.43 m/s WL = 0.07 m WIDTH = 43.4 m V = 0.7 m/s TANK
WIDTH = 0.6 m LENGHT = 3.50 m LENGHT = 15.8 m HEIGHT = 1.1 m WIDTH = 0.5 m 16 17 HEIGHT = 0.65 m HEIGHT = 0.65 m WIDTH = 0.6 m LENGHT = 3.6 m LENGHT = 16.4 m
8) NEUTRALIZATION
SCREEN HEIGHT = 0.6 m WIDTH = 0.3 m WIDTH = 0.5 m HEIGHT = 0.5 m HEIGHT = 0.6 m WIDTH = 0.3 m WIDTH = 0.4 m WATER LINE
Qmax= 10800 m3/d HEIGHT = 0.2 m HEIGHT = 0.5 m ΔHNOZZLES: 2.13 m HEIGHT = 0.2 m HEIGHT = 0.5 m
i = 0.3% (3 mm/m) i = 0.3% (3 mm/m) i = 0.3% (3 mm/m) i = 0.3% (3 mm/m) 9) DISTRIBUTOR
WLmax = 0.40 m +3.70 WATER LINE (PEAK FLOW)
V = 0.8 m/s 10) BIOLOGICAL OXIDATION
WIDTH = 1.5 m SLUDGE LINE
+4.00 Qmax =35 m3/h TO RECIRCULATION FACTOR: 1.5
11) CLARIFIER FEEDING TANK
THICKENER
+3.40
+3.50 +3.00 TO BE SUPPLIED BY THE CLIENT

THICKENER
+3.00 +3.00 +3.00 12) CLARIFIER
+2.50 +2.50 +2.08 +2.00 +2.00

TO
13) RETURN SLUDGE TANK INLET FLOW: 21600 m³/day
+1.50 14) SLUDGE THICKENER
±0.00 (PLINTH LEVEL)
C.O.D.: 1000 mg/l
-0.15 (G.L.L) +0.175 -1.425 15) OXYGEN INCREASE TANK
ANY REPRODUCTION WITHOUT THE EXPRESS WRITTEN CONSENT OF PANTA REI IS PROHIBITED

16) CONOSCREEN R
Via Cavour, 17 - 30032
-2.225 17) COOLING TOWER Fiesso d'Artico (VE) - Italy
-2.65 tel: +39 049 7968832
fax: +39 049 7968833
-3.50 -3.50 Q = INLET FLOW info@pantareiwater.com

2 WL = WATER LEVEL CUSTOMER:


-5.00 -5.00
-5.00
V = VELOCITY
Pioneer Denim Ltd. (Garment Division)
THIS DRAWING IS EXCLUSIVE PROPERTY OF PANTA REI

-6.00 -5.40

PANTA REI S.R.L. SUPPLY LIMITS


4 5 6 L = LENGTH
COUNTRY: SUBJECT:
SLUDGE SLUDGE BANGLADESH WASTE WATER TREATMENT PLANT
EXTRACTION PIPE EXTRACTION PIPE De = EXTERNAL DIAMETER
7 8 9 10 11 12 13 DESCRIPTION :
CUSTOMER SUPPLY LIMITS 3 Q = 840 m3/d
WL = 0.08 m
Q = 8100 m3/d
WL = 0.07 m Di = INTERNAL DIAMETER HYDRAULIC PROFILE
V = 0.70 m/s V = 0.82 m/s
L=9m L = 9.5 m CURVE = NUMBER OF CURVES 1st Issue Date: Scale: Order NR. DWG Preliminary
De = 140 mm De = 400 mm 01/12/2023 N/A PR145 TYPE
1st Issue: For Erection
0 01/12/2023 FIRST EMISSION P.M.G. CHECKED BY: Eng. P.M.G.
Di = 133 mm Di = 380.4 mm i = INCLINATION
N° REV REVISION DATE DESCRIPTION DRAWN BY APPROVED BY: Eng. Gregori
CURVE = 0 CURVE = 0 FORMAT: A0 DRAWING NUMBER: PR14523-A001-REV0 SHEET: 1/1

You might also like