You are on page 1of 4

CURRICULUM VITAE

Ir. Adittama Prasetya Nugraha, S.T., IPM., APEC Eng.


Permanent Address : Jl, Tentara Pelajar, Singokerten Residence Blok 1
no.11, Kauman, Batang District, Batang Regency,
Central Java
Born : Tegal, May 15, 1988
Marital Status : Married
Citizen : Indonesian
Religion : Moslem
Phone (HP) & WA : +6282151641042
Email : adittamaprasetyanu@gmail.com

Allow me to introduce myself. Now, I am a Mine Planning Section Head at Barasentosa Lestari Inc. (Sinarmas
Mining). I handle long term plan, mid term plan & short term plan on mines & support projects. I am able to
operate mine planning software. My experiences before are a Mine Engineer at Kaltim Prima Coal Inc. (KPC),
Quarry and Crushing Plant Operation Head (Deputy KTT) at Holcim Indonesia Ltd. & Mine Plan Unit Head at
Saptaindra Sejati Inc. (SiS). I am graduate from Pembangunan Nasional “Veteran” Yogyakarta University
majoring in mining engineering bachelor with GPA of 3.79 (scale 4.00) & Bandung Institute of Technology in
Engineer Profession Program – Mining Engineering with GPA of 4.00 (scale 4.00). While a student, besides
studying I was active in software course, seminar and ever become chairman in organization.
I interest with this company because my background from mining engineering. I have experiences at mining
engineering & mining operation of big mining company. I have certificate of POP (Lower Operational
Supervisor), POM (Middle Operational Supervisor), POU (Primary Operational Supervisor) & Implementation
of SMKP (Mining Safety Management System). I have certificate of Senior Professional Engineer (IPM). I have
taken the liberty of including my resume with this letter, I sure that you will find my stranghts, abilities, and
experience of use to your company.

Experiences :
1. Mine Planning Section Head at Barasentosa Lestari Inc. (Sinarmas Mining) on October 2021 –
present.
- Make Yearly Budget to internal & RKAB to government
- Manage mine sequences, water management, pit operation and hauling every month based on
Three Months Rolling Plan (3MRP) or Budget.
- Manage dump strategy, calculating dump volume, produce dump balance, optimize in pit
dump strategy for short term section, and made forecast of distance.
- Design and redesign pit, disposal and project. Coordination with geotech about safety factor of
design.
- Coordination about Daily plan, weekly plan, monthly plan, 3MRP, budget and reconcile with
mining contractor.
- Report and analysis reconcile map between plan & actual to BOD.
- Prepare data to Feasibility Study (FS) & AMDAL

2. Trainer / Speaker at Online Training & Mini Class on May 2022 – present
- Mine Planning
- Mining Economics
- Budgeting & Costing for Mine Project
- SOP & JSA on Mining Activities

3. Superintendent of Mining Business Development and Mine Engineering Superintendent &


Deputy Project Manager at PT. PP Presisi Tbk on November 2020 – September 2021.
a. Superintendent of Mining Business Development (November 2020 – February 2021)
- Site visit to mining owner candidate to survey and know actual condition.
- Review serve and Schedule target production of Yearly based on Budget.
- Review profile, work plan and strategy of owner candicate
- Calculate equipment and cash flow based on work plan of owner candidate
b. Mine Engineering Superintendent & Deputy Project Manager (March - September 2021)
- Manage mine sequences, digger movement, ore hauling, OB dumping progress, Ore stocking
and Ore Barging based on Budget.
- Make and analysis reconcile map between actual & plan by monthly.
- Consult daily with operations staff to learn their concerns and ensure that these are addressed
in the planning process (digger movement, ore hauling, OB dumping progress, Ore stocking
and Ore Barging).
- Prepare weekly and monthly schedules, plans and sections which show how mining should
progress.
- Coordination about weekly plan, monthly plan, budget and reconcile with mining owner
(digger movement, ore hauling, OB dumping progress, Ore stocking and Ore Barging).
- Coordination about daily plan, weekly plan and monthly plan with Operation
- Report daily, weekly & monthly progress of mining, hauling & barging to management &
owner
- Make sure operation, HSE, Logistic & HRGA in progress based on plan

4. Mine Plan Unit Head at Saptaindra Sejati Inc. (SiS) Adaro Energy on October 2017 – October
2020.
a. Site Adaro Indonesia Inc. (October 2017 – June 2019)
- Manage mine sequences, water management, pit operation and hauling every week based on
Three Months Rolling Plan (3MRP) or Budget.
- Manage dump strategy, calculating dump volume, produce dump balance, optimize in pit
dump strategy for short term section, and made forecast of distance.
- Design and redesign pit, disposal and project. Coordination with geotech about safety factor of
design.
- Make and analysis reconcile map between actual & plan by monthly.
- Consult daily with operations staff to learn their concerns and ensure that these are addressed
in the planning process (digger movement, blasting schedule, cycle time, dumping progress
and water management).
- Prepare weekly and monthly schedules, plans and sections which show how mining should
progress.
- Coordination about weekly plan, monthly plan, 3MRP, budget and reconcile with mining
owner, operation & drill blast.
b. Site Adaro Met Coal Inc. (AMC) (July 2019 – October 2020)
- Coordination about yearly plan, monthly plan / Three Months Rolling Plan (3MRP), and
weekly plan of mine preparation (land clearing, chainsaw, top soiling, construct road,
construct sediment pond, construct shift change etc) with mining owner.
- Manage mine preparation sequences, water management every week and every day based on
3MRP and Budget.
- Manage dump strategy, calculating dump volume, produce dump balance for short term
section and made forecast of distance.
- Design and redesign pit, disposal and project. Coordination with geotech of mining owner
about safety factor of design.
- Make and analysis reconcile map between actual and plan by weekly and monthly.
- Consult daily with operations staff to learn their concerns and ensure that these are addressed
in the planning process (digger movement, distance, dumping progress and water
management).

5. Quarry and Crushing Plant Operation Superintendent and Deputy Quarry Manager at Holcim
Indonesia Ltd. on May – September 2017.
- Reserve and Schedule target production of Life of Mine (LOM) based on Budget.
- Reserve and Schedule target production of mine/quarry by weekly and monthly based on
Budget, manage detail strategy of mine/quarry sequences, drill and blast, water management,
mine/quarry operation, and strategic hauling.
- Plan and monitor dump strategy, calculate dump volume based on Budget.
- Plan and monitor top soiling, stripping overburden and reclamation operation based on
Budget.
- Schedule target production of crushing plant (primary crushing and secondary crushing) by
daily, weekly and monthly based on Budget of Mechanical Avaibility, Utilization, Production
Rate and Running Equipment Effectiveness (REE).
- Monitor and ensure progress of mine/quarry, project, and crushing plant operation every day
then coordinate with supervisor and operator to achieve target based on plan.
- Control and coordinate equipment performance with Maintenance Superintendent.
- Plan rental heavy equipment based on Budget target production.
- Coordinate with rental heavy equipment contractor.
- Control and coordinate quality of final product with dispatch Head and sales.

6. Graduate Development Program (GDP) & Mining Engineer at Kaltim Prima Coal Inc. (KPC) on
July 2011 – January 2017.
a. Shortterm plan - Pit and Disposal (July 2011 – August 2012 and October 2014 – October 2016)
- Consult daily with operations staff to learn their concerns and ensure that these are addressed
in the planning process (digger movement, blasting schedule, cycle time, dumping progress
and water management).
- Prepare weekly and monthly schedules, plans and sections which show how mining should
progress.
- Present plans to senior operating and engineering staff at planning meetings.
- Provide operations with necessary designs for roads, dumps and drainage, which will enable
equipment to operate safely and efficiently.
- Monitor the mining operation such that survey and geological control is provided, to identify
problems that may call for a revision of the plan and to ensure that operations understand the
plan
b. Midterm plan (August 2012 – January 2013 and December 2013 – May 2014)
- Reserve and Schedule target production by Monthly, Budget, Forecast for quarter, yearly and
Eight Week Rolling Plan (8WRP) based on last short term sequence, manage detail strategy of
mine sequences, water management, pit operation, and strategic hauling.
- Manage dump strategy, calculating dump volume, produce dump balance, optimize in pit
dump strategy for short term section, and made forecast of cycle time.
- Design and redesign pit, dumping and project. Coordination with geotech about safety factor
of design.
- Make and analysis reconcile map between actual & plan by monthly.
- Make daily report, weekly report and monthly report
c. Project Coordinator & Cost Control (February 2013 – November 2013)
- Plan and control longterm project cost & midterm project cost of Mining Operation Division
(any projects are rehandling failure at road, reshaping dump/disposal, construct & upgrade
pond, construct cutslot, regrading road, etc.)
- Ensure progress of any projects on time on Mining Operation Division every week
- Coordination about issue of projects.
- Ensure assets (active, park up, back up, rental) by weekly.
- Review CEA (Capital Expenditure Approval) of Mining Operation Division
d. Field Engineer – Production Supervisor (June 2014 – October 2014)
- Supervise work of loading point (Pit) & dumping point (disposal)
- Supervise work of Project & Road Maintenance (any projects are construct Shift change,
install pipe, construct open channel, construct dike, etc.)
- Manage change of reguler operator and backup operator
e. Contract Mining – Operation (October 2016 – January 2017)
- Make and arrange RKAB and RKTTL based of budget as references to contractor
- Design and redesign pit, dump and projects (pond, top soil stock pile, barrier, road, etc.).
Coordination with Geotech about safety factor of design.
- Plan and monitor projects & water management from pit until compliance point of contractor
- Plan and monitor clearing and mine reclamation of contractor
- Make weekly report and monthly report
- Make CEA, Request to Contract, Tenderer List, Scope of Work to projects with contractor.

7. Final Assignment concern Drilling and Blasting of Overburden at Kaltim Prima Coal Inc. (KPC)
on April – August, 2010
8. Laboratory Assistant of Mineral Dressing Practicum at UPN Veteran Yogyakarta in 2008/2009
period
9. Laboratory Assistant of Soil Mechanic Practicum at UPN “Veteran” Yogyakarta in 2008/2009
and 2009/2010 period

Formal Education :
1 Engineer Profession Program “Insinyur” in Mining Engineering Sub Study Program, ITB (Bandung
Institute of Technology), in 2022 – 2023
2 Bachelor Degree in Mining Engineering Department, UPN (Veteran National Development
University) - Yogyakarta, in 2006 - 2010

Certification & Informal Education :


1. Certificate of APEC Engineer Register from International Engineering Alliance & PII (The Institution
of Engineers Indonesia) on October 2023
2. Competence certificate of IPM (Insinyur Profesional Madya) from PII (The Institution of Engineers
Indonesia) on February 2023
3. Competence certificate of POU (Competency Senior Operational Management) from LSP GMBE &
BNSP (National Professional Certification Board) on December 2022
4. Competence certificate of ISMKP (Implementation of Mining Safety Management System) from
Ministry of Energy & Mineral Resources on January 2022
5. Competence certificate of POM (Competency Middle Operational Management) from LSP GMBE &
BNSP (National Professional Certification Board) on April 2021
6. Competence certificate of POP (Competency Frontline Operational Management) from LSP Perhapi &
Ministry of Energy & Mineral Resources on January 2016
7. Designing a Creative Infographic to Present Your Data (with Microsoft PowerPoint and Think-cell
add-on) Training from ExecuTrain on August 31 – September 2, 2022
8. Basic SPRY Scheduler Training from Mitrais on May 6-10, 2022
9. Analytics for Decision Making Training from edX & Babson College on May, 2022
10. Mining Economics Training from Sinarmas Mining on April, 2022
11. Finnon : Understanding Financial Statement Training from PPM Manajemen on March, 2022
12. Project Management Training from PPM Manajemen on February, 2022
13. Powerful Business Presentation Training from PPM Manajemen on February 14-17, 2022
14. Blast Sentry Training from Drill & Blast Dept, Kaltim Prima Coal Inc. (KPC) at Sangatta on May 19,
2015
15. Workshop of Geomekanika III at Santika Hotel Jakarta on February 17, 2015
16. Job Safety Analysis (JSA) Training from HSE Division, Kaltim Prima Coal Inc. (KPC) at Sangatta on
October 16, 2014
17. Excellent Performance Training from Kaltim Prima Coal Inc. & Infantry Division 1 KOSTRAD at
Cilodong West Java on November 3 - 26, 2013
18. Safe and Efficient Blasting in Surface Coal Mine Training from Orica Sangatta Project at Sangatta on
September 11 - 12, 2013
19. Hydrocarbon and Waste Management Training from HSE Division, Kaltim Prima Coal Inc. at Sangatta
on November 14, 2012
20. Rehabilitation Specification Training from HSE Divion, Kaltim Prima Coal Inc. (KPC) at Sangatta on
June 28, 2012
21. Participant of Surpac V 6.1 Training from Globecon Inc. Indonesia Agent for Gemcom Asia Pasific Pty
Ltd at UPN “Veteran” Yogyakarta on May 7 -12, 2009
22. AutoCad Mechanical 2004 software Course in Smile Group on August 2008
23. Geographic Information System (GIS) software Course “MapInfo-Arcview”in CITRA MEDIA
GROUP, on July 2008

Achievement :
1. Be presenter in Annual Professional Meeting XXXII of Association of Indonesian Mining
Professionals (PERHAPI) 2023 at Mercure Hotel Samarinda on September 20, 2023
2. Be speaker in National Seminar of Geomekanika III at Santika Hotel Jakarta on February 16, 2015
3. Successfully completed mine planning (short term planning) from green field to mined out at Kaltim
Prima Coal Inc.
4. Successfully planning & executing of highwall optimization for increase coal gain with low stripping
ratio at under design of Inul Middle Pit at Kaltim Prima Coal Inc.
5. Successsfully applying grading concept for water management on disposal at Holcim Indonesia Ltd.
6. Acquire “Karya Cendikia” represent major of Mining Engineering on UPN “Veteran” Yogyakarta 2 nd
period 2010/2011 Graduation Ceremony, January 22, 2011
7. Acquire Final Year Scholarship (FYS) 2009/2010 periode from Kaltim Prima Coal Inc. (KPC)

Skill :
1. Mine Planning, Mine Engineering & Mine Operation
2. Project Management & Mining Economics
3. Be able operate some software, example : Minex, Minescape, Xpac, Spry, Talpac, AutoCad, ArcGis,
Global Mapper, Microsoft Project and Microsoft Office
4. Leadership, analytical thinking, problem solving, negotiation & proactive

Organizations :
1. Members of The Institution of Engineers, Indonesia (PII) in 2022 - present
2. Members of Perhapi East Kutai on 2012/2013 period, 2013/2014 period, 2014/2015 period and
2015/2016 period
3. Management of IA UPN “Veteran” Yogyakarta affiliate Sangatta – Bengalon, East Kalimantan on
2012/2013 period, 2013/2014 period, 2014/2015 period and 2015/2016 period
4. Members of IA UPN “Veteran” Yogyakarta affiliate Sangatta – Bengalon, East Kalimantan on
2011/2012 period
5. Chairman of KSM Ilmiah Mining Enginnering UPN “Veteran” Yogyakarta on 2009/2010 period

Hobbies & Interest :


1. Sports : Football, basketball & motocross
2. Reading : Sport, Islamic, Business & Otomotive magazine / book / article
3. Interest : Want to join with training & seminar that could enhance & raise our ability & skill

You might also like