You are on page 1of 1

PREVENTIVE MAINTENANCE CHECKLIST FOR HYDRA(DAILY)

Date: Project Name uPSRC.AYoDyA ASSET NAME

S. No Checkpoints FOR YES FOR NO


O0O
OOOO
Engine oil level
2
Radiator coolent level

Fule

Wind screen clear &good visibility


5
|Are all steps and handle free of grease
6
All operational functions are ok

All hoses condition

8
Any leaks in hoses on cylinders
9
Pneumetic hoses condition
10
Load limit device condition

11
Level guage installed and condition
12
Main hom condition

13
Breakest aplication on loss of power
14
Sturns of cable remain on drum when hook is in contact with ground
15
Hook condition including safety latch
16
Operating levers condition
17
Slings /Chains condition
18
Hardware link bolts, cotter pin condition etc.
19
Lights and indicators condition
20
Brakes including parking brake
21
Rear view mirror

22
Reversing light &alarm

Signature ot OperatorDriver Signature of Mechanical_Audit_at Project

You might also like