The document outlines six functional requirements for a manufacturing job tracking system. Requirement 1 must log start time, finish time, and materials used for each job. Requirement 2 should capture this data on a touchscreen to not disrupt craftspeople's work. Requirement 5 must provide a data mining function to analyze historic costs and work data.
The document outlines six functional requirements for a manufacturing job tracking system. Requirement 1 must log start time, finish time, and materials used for each job. Requirement 2 should capture this data on a touchscreen to not disrupt craftspeople's work. Requirement 5 must provide a data mining function to analyze historic costs and work data.
The document outlines six functional requirements for a manufacturing job tracking system. Requirement 1 must log start time, finish time, and materials used for each job. Requirement 2 should capture this data on a touchscreen to not disrupt craftspeople's work. Requirement 5 must provide a data mining function to analyze historic costs and work data.
Requirement 1. System must Must-have Must be possible Create Must-have log the on all shirts craftsperson, including overtime. the start-time and the finish- time and the materials used for the manufacturing job. 2. Data for time Should-have To be usable in a Usability Should-have and materials noisy and dirty used is to be workshop captured on a environment. touch screen next to the machines on the factory floor and make sure the craftsperson’s work is not disrupted. 3. System is to Could-have N/A Read N/A calculate material and overhead costs for each manufacturing job. 4. The system is Could-have N/A Read N/A to provide a time spent analysis which is the time to setup, time per step, and rework time report for work done by the craftsperson. 5. Managing Must-have N/A Read N/A director would like a data mining type of function to drill drown of historic data. Work at all costs in total or per product range, or per craftsperson over a flexible period of time, or for an individual piece of work. 6. Sales manager Could-have Access via VPN Access Should-have has asked for using a laptop to secure remote the historic data. access via VPN using a laptop historic data or the system when working away from the office.
Start time, Finish time and
materials used for each manufacturing job Calculate material and overhead Craftsperson costs for each manufacturing job
Would like a data mining
type of function to drill down on historic data. Work at all costs in total or per product range or per craftsperson, over a flexible Provide a time spent analysis report period of time , or for an Managing for the work done by each individual piece of work. Director craftsperson
Sales manager has asked for
secure remote access via VPN using a laptop historic data or the system when working away from the office. Sales Manager