Functional Priority Non-functional Category Priority


Requirement
1. System must Must-have Must be possible Create Must-have
log the on all shirts
craftsperson, including overtime.
the start-time
and the finish-
time and the
materials used
for the
manufacturing
job.
2. Data for time Should-have To be usable in a Usability Should-have
and materials noisy and dirty
used is to be workshop
captured on a environment.
touch screen
next to the
machines on
the factory
floor and
make sure the
craftsperson’s
work is not
disrupted.
3. System is to Could-have N/A Read N/A
calculate
material and
overhead
costs for each
manufacturing
job.
4. The system is Could-have N/A Read N/A
to provide a
time spent
analysis which
is the time to
setup, time
per step, and
rework time
report for
work done by
the
craftsperson.
5. Managing Must-have N/A Read N/A
director
would like a
data mining
type of
function to
drill drown of
historic data.
Work at all
costs in total
or per product
range, or per
craftsperson
over a flexible
period of
time, or for an
individual
piece of work.
6. Sales manager Could-have Access via VPN Access Should-have
has asked for using a laptop to
secure remote the historic data.
access via VPN
using a laptop
historic data
or the system
when working
away from the
office.

Start time, Finish time and


materials used for each
manufacturing job
Calculate material and overhead
Craftsperson
costs for each manufacturing job

Would like a data mining


type of function to drill
down on historic data. Work
at all costs in total or per
product range or per
craftsperson, over a flexible
Provide a time spent analysis report
period of time , or for an
Managing for the work done by each
individual piece of work.
Director craftsperson

Sales manager has asked for


secure remote access via VPN
using a laptop historic data or
the system when working away
from the office.
Sales Manager

You might also like