You are on page 1of 20

HIMALAYA COLLEGE OF ENGINEERING HIMALAYA COLLEGE OF ENGINEERING

Chyasal, Lalitpur Chyasal, Lalitpur


Survey Camp 2071, Kritipur, Kathmandu Survey Camp 2071, Kritipur, Kathmandu
Program: Civil Batch: 2069 Program: Civil Batch: 2069
Group No:- Date: Group No:- Date:
Intrument Issued Intrument Issued
S.N. Particulars Nos. Condition Remarks S.N. Particulars Nos. Condition Remarks
1 Total Station 1 Total Station
2 Prism with Stand 2 Prism with Stand
3 Tripod for Prism Stand 3 Tripod for Prism Stand
4 Theodolite 4 Theodolite
5 Staffs 5 Staffs
6 Autolevel 6 Autolevel
7 Staffs 7 Staffs
8 Marking Arrow 8 Marking Arrow
9 Tripod Stand 9 Tripod Stand
10 Khurpa 10 Khurpa
11 Ranging Rods 11 Ranging Rods
12 Hammer 12 Hammer
13 Tape (50 m) 13 Tape (50 m)
14 Tape (30 m) 14 Tape (30 m)
15 Umbrella 15 Umbrella
16 16
17 17
18 18
19 19
20 20
Rules:
1) Students are not allowed to enter the Survey store room without permission 1) Students are not allowed to enter the Survey store room without permission
2) Instruments are not issued in rainy time 2) Instruments are not issued in rainy time
3) Instruments should be returned on the same day 3) Instruments should be returned on the same day
4) If an instrument is found to be defective or lost ,the same group has to face charges 4) If an instrument is found to be defective or lost ,the same group has to face charges
5) Students should return the instruments within the office hour 5) Students should return the instruments within the office hour
6) Check instruments before taking them to the site otherwise it is assumed to be perfect 6) Check instruments before taking them to the site otherwise it is assumed to be perfect

Name & Signature of the Group member/s :- Name & Signature of the Group member/s:-
Campus Roll Nos. (all) :- Campus Roll Nos. (all) :-
___________________ ___________________

Survey Store Survey Store


Keeper Keeper
T.U. Institute of Engineering
HIMALAYA COLLEGE OF ENGINEERING
Survey Camp – 2071
Room Allocation Sheet

Available Available Photo-


Room Signature
Name of Student Resources in room Resources in graph Remarks
No. of Student
before entry room before exit NO.
Station Reference Sheet
Station: Date:

Station: Date:

Station: Date:

Measured By: Booked By:


Observer: Weather:
Recorder: Temperature:
Instrument: Date:
Distance Measurement

Line/Leg Distance(m)
Forward Backward
Discrepancy Avearage Precision Remarks
From To Measured Values Measured Values (e) (m) (m/e)
Observer: Weather:
Recorder: Temperature:
Instrument: Date:
Horozontal Angle Observation Sheet
Bearing of Leg:-
Hz.
Inst. St. and Ht. of

Horizontal Angle Observation Angle Horizont


sighted to

Mean of
FACE

al
Inst.

Set I & Distance


I - Set Angle Mean-I II - Set Angle Mean-II II (m)
d m s d m s d m s d m s d m s d m s d m s
Observer: Weather:
Recorder: Hz. Angle Observation Sheet Temperature:
Instrument: Date:

Bearing of Leg:-
Inst. St. and Ht. of

Horizontal Angle Observation Hz. Angle Horizon


sighted to

Mean of Set
FACE

tal
Inst.

I & II Distanc
I - Set Mean-I II - Set Mean-II e (m)
d m s m s d m s d m s m s d m s d m s
(Theodolite Traversing)
Computation (Angle Reduction Sheet)

Horizontal Angle Corrected Angles


Statio
Corrections Remarks
n
° ’ ” ° ’ ”

Computed BY: Checked By:


NEPAL POLYTECHNIC INSTITUTE
Bharatpur, Chitwan
Survey Camp 2080
Gale's Table
Bearing: D M S Co-ordinate of reference station No:
X Y Z
…..

Measured Hz. corre Corrected Hz. Consecutive

STATION
Bearing (WBC) Correction Corrected INDEPENDENT COORDINATE Final
Distance
Station

Line/Leg Angle ction Angle coordinates Length of Final Bearing


Leg

Traverse (WBC)
From

D M S S D M S D M S Lat. (m) Dep.(m) Lat(+-) Dep(+-) Lat(+-) Dep(+-) N E Z Leg


To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Sum= …… … … … … … …
………

Sum of measured angle= Closing Error,e=


Theoritical sum of measured angle= Perimeter of Traverse,P=
error= Relative Closing error=1/(P/e)=
Permissible error= Permissible closing error=
Verified By …………………
NEPAL POLYTECHNIC INSTITUTE
Bharatpur, Chitwan
(Theodolite Traversing)
Computation (Bearing Correction Sheet)
Survey Camp 2080

Statio Horizontal Angle Calculated Bearing Corrected Bearing


Corrections Remarks
n ° ’ ” ° ’ ” ° ’ ”

Computed BY: Checked By:


NEPAL POLYTECHNIC INSTITUTE
Bharatpur, Chitwan

Observer: Weather:
Recorder: Temperature:
Instrument: Date:
TACHEOMETRY DETAILING SHEET
Inst.St Stadia
.& Sighte Horizontal Angle Stadia Reading (Zenithal) Angle Intercept( Hz. Vert. R. L. of
m) Dist. Dist. (m) points Remarks
Ht.of d to
(m) (+/-) (m)
Inst. d m s Top(T) Mid Bot(B) d m s S=T-B
NEPAL POLYTECHNIC INSTITUTE
Bharatpur, Chitwan
Observer: Weather:
Recorder: Temperature:
Instrument: Date:
TOTAL STATION DETAILING SHEET

Inst.St.& Sighted Horizontal Angle Horizontal Vertical Target R. L. of


Distance (m) Distance
Remarks
Ht. of Inst. to Height points (m)
d m s
NEPAL POLYTECHNIC INSTITUTE
Bharatpur, Chitwan
Observer: …………………………….. Weather: ……………..
Recorder: ……………………………. Temperature: ………..
Instrument: ………………………….. Date: …………………..

Two-Peg Test: Obsevation and Calculation Sheet

Staff Reading in meter Mean(H) Mean-M


Instrument Set Up Object Station
Top (T) Mid (M) Bottom (B) =(T+M+B)/3 (<1mm)

A Ha=
Near A
B Hb=
A Ha'=
Mid of AB
B Hb'=

True level difference between A and B = Ha-Hb = ∆h1 =


Apparent level difference between A and B = Ha'-Hb' = ∆h2 =
Collimation Error = ∆h1-∆h2 =
Horizontal distance between pegs A & B (H) =
Precision = e/H = (>1:10000)
NEPAL POLYTECHNIC INSTITUTE
Bharatpur, Chitwan
Observer: Weather :
Recorder Temp:
Instrument: Date
Fly Levelling Field Book
BS FS Distance= Elevation

ks
)

)
(m
n

m
n

n
S1 S2 100(S1+S

ar
io

ea

ea

(
(m)
at

em
ll
2)

is
M

M
St

T M B T M B

Fa
R

Total

Closing Error= SUM (RISE) - SUM (FALL)=


Permissible closing error=
LAST RL - FIRST RL =
Verified by........................ SUM (BS) - SUM (FS) =

Remarks: Since closing error<permissible value hence we apply the correction


NEPAL POLYTECHNIC INSTITUTE
Bharatpur, Chitwan
Fly Level Correction Sheet

Station Length
Station RL Correction Corrected R.L. Remarks
From To (m)
Horizontal Curve Sheet
Observer: Weather:-
Recorder: Temperature:
Instrument: Date:-

Deflection Angle =
distance Chainage Radius of Tangent Length of Apex
Line /Leg Station ∆ Chainage of
IP to IP of Stn IP Curve Length Curve Distance
IP ( +or - ) Remarks(
(m)
Grade %)
From IP To IP (m) ± d m s R(m) TL(m) Lc (m) E(m) BC (m) MC (m) EC (m)

1 2 3 4 (=2) 5 6 7 8 9 10 11 (=5-8) 12 (=11+9/2) 13 (=11+9)


NEPAL POLYTECHNIC INSTITUTE
Bharatpur, Chitwan
Gale's Table (Road Survey)
Bearing: Coordinate of Referance X Y Z Station
included Angle
Length Station No: …..
Leg Distance
Consecutive

STATION
Bearing (WCB) Correction Corrected INDEPENDENT COORDINATE Final

Station
coordinates Length of Final Bearing
Line/Leg
Traverse (WBC)
From

D M S Lat. (m) Dep.(m) Lat(+-) Dep(+-) Lat(+-) Dep(+-) N E Z Leg


To
1 2 3 4 9 10 11 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Sum= …… … … … ………

Sum of measured angle= Closing Error,e=


Theoritical sum of measured angle= Perimeter of Traverse,P=
error= Relative Closing error=1/(P/e)=
Permissible error= Permissible closing error=
Verified By …………………
Observer: Weather:
Recorder: Temperature:
Instrument: Date:

RECIPROCAL LEVELLING

Staff reading Mean Height diff =


Inst Stn. Sighted to Remarks
(=T+M+B)/3 hA-hB
Top Mid Bot
Near A A
B
Avg Ht diff =
Near B A
B

R.L. of B = R.L. of A - Avg ht diff = ………………. m

Check for Errors:


Observer : Date :
Recorder : Weather :
Instrument : Temperature :
Profile levelling and Cross Sectioning Sheet (Road)
Distance, m
Station B.S. I.S. F.S H.I. Rise Fall R.L. Remarks
Left Centre Right

You might also like