You are on page 1of 179

Target Agustus 2023

PO - all -

Sum of Nilai Tagihan Status Dokumen


Cluster Ready SAP Proses BAST Proses BAPP Done NY
63 366,989,000 467,113,288 594,543,621
84 413,223,000 158,415,000 43,000,000 340,263,000
91 270,609,609 279,824,978
92 785,778,780 281,770,030
99 298,966,897 227,922,243
100 204,962,963 16,226,056 221,178,282
101 72,268,000 760,391,640
102 52,644,201 201,876,232
103 285,679,673 269,011,814
104 69,135,459 498,322,941 83,650,240 630,483,637
Total Result 1,118,535,874 741,211,710 2,028,319,283 198,918,240 3,807,265,477
Total Result
1,428,645,909
954,901,000
550,434,587
1,067,548,810
526,889,140
442,367,301
832,659,640
254,520,433
554,691,487
1,281,592,277
7,894,250,584
Ready SAP
Prioritas tracking
Ada kendala

Target Agustus 2023


Cluster
100 FMC Malteng - BBM Nama Pekerjaan Periode
Dec-22 Projek
Rutin
104 FMC Merauke - Cor site Mar-23 Rutin
104 FMC Merauke - Cor Power Mar-23 Rutin
63 FMC Seram - Cor Site Apr-23 Rutin
63 FMC Seram - Cor Genset Apr-23 Rutin
104 FMC Merauke - Cor site Apr-23 Rutin
104 FMC Merauke - Cor Power Apr-23 Rutin
63 Seram - Msite May-23 Rutin
63 Seram - Mgenset May-23 Rutin
63 Seram - ETS May-23 Rutin
63 Seram- PJS May-23 Rutin
63 Seram - SCD May-23 Rutin
63 Seram - Cor Site May-23 Rutin
63 Seram - Cor Power May-23 Rutin
63 Seram - BBM May-23 Rutin
84 NBS - Corr Site May-23 Rutin
84 NBS - Corr Genset May-23 Rutin
84 NBS - Msite Jun-23 Rutin
84 NBS - Mgenset Jun-23 Rutin
84 NBS - ETS Jun-23 Rutin
84 NBS - PJS Jun-23 Rutin
84 NBS - SCD Jun-23 Rutin
84 NBS - BBM May-23 Rutin
100 Malteng - Cor Site May-23 Rutin
100 Malteng - Cor Power May-23 Rutin
100 Malteng - BBM May-23 Rutin
104 FMC Merauke - BBM May-23 Rutin
104 FMC Merauke - Cor site May-23 Rutin
104 FMC Merauke - Cor Power May-23 Rutin
91 Tarakan- Msite Jun-23 Rutin
101 FMC Toli2 - MTC site May-23 Rutin
101 FMC Toli2 - MTC Genset May-23 Rutin
101 FMC Toli2 - Corr Site May-23 Rutin
101 FMC Toli2 - Corr Power May-23 Rutin
101 FMC Toli2 - Fee PJS May-23 Rutin
101 FMC Toli2 - Bantek May-23 Rutin
101 FMC Toli2 - MTC site Jun-23 Rutin
101 FMC Toli2 - MTC Genset Jun-23 Rutin
101 FMC Toli2 - BBM Jun-23 Rutin
101 FMC Toli2 - Fee BBM Jun-23 Rutin
101 FMC Toli2 - Corr Site Jun-23 Rutin
101 FMC Toli2 - Corr Power Jun-23 Rutin
101 FMC Toli2 - Fee PJS Jun-23 Rutin
101 FMC Toli2 - Bantek Jun-23 Rutin
63 Seram - Msite Jun-23 Rutin
63 Seram - Mgenset Jun-23 Rutin
63 Seram - ETS Jun-23 Rutin
63 Seram- PJS Jun-23 Rutin
63 Seram - SCD Jun-23 Rutin
100 Malteng - Msite Jun-23 Rutin
100 Malteng- Mgenset Jun-23 Rutin
100 Malteng - ETS Jun-23 Rutin
100 Malteng - PJS Jun-23 Rutin
100 Malteng - SCD Jun-23 Rutin
104 Merauke- ETS Jun-23 Rutin
104 Merauke -SCD Jun-23 Rutin
104 Merauke - Msite Jun-23 Rutin
104 Merauke - Mgenset Jun-23 Rutin
104 Merauke - PJS Jun-23 Rutin
91 Tarakan - Mgenset Jun-23 Rutin
91 Tarakan - SCD Jun-23 Rutin
91 Tarakan - PJS Jun-23 Rutin
91 Tarakan - Fee Sec Jun-23 Rutin
91 Tarakan - ETS Jun-23 Rutin
91 Tarakan - BBM Jun-23 Rutin
91 Tarakan - Fee BBM Jun-23 Rutin
91 Tarakan - Cor Site Jun-23 Rutin
91 Tarakan - Cor Power Jun-23 Rutin
92 Sintang- Msite Jun-23 Rutin
92 Sintang - Mgenset Jun-23 Rutin
92 Sintang - SCD Jun-23 Rutin
92 Sintang - PJS Jun-23 Rutin
92 Sintang - Fee Sec Jun-23 Rutin
92 Sintang - ETS Jun-23 Rutin
92 Sintang - BBM Jun-23 Rutin
92 Sintang - Fee BBM Jun-23 Rutin
92 Sintang - Cor Site Jun-23 Rutin
92 Sintang - Cor Power Jun-23 Rutin
99 Sanggau - Msite Jun-23 Rutin
99 Sanggau - Mgenset Jun-23 Rutin
99 Sanggau - PJS Jun-23 Rutin
99 Sanggau - Fee PJS Jun-23 Rutin
99 Sanggau - SCD Jun-23 Rutin
99 Sanggau - ETS Jun-23 Rutin
99 Sanggau - BBM Jun-23 Rutin
99 Sanggau - Fee BBM Jun-23 Rutin
99 Sanggau - Cor Site Jun-23 Rutin
99 Sanggau - Cor Power Jun-23 Rutin
102 Ponti - BBM Jun-23 Rutin
102 Ponti - Fee BBM Jun-23 Rutin
102 Ponti - Cor Site Jun-23 Rutin
102 Ponti - Cor Power Jun-23 Rutin
103 Rental genset btg May-23 Rutin
103 Rental genset btg Jun-23 Rutin
103 Bontang - BBM Jun-23 Rutin
103 Bontang - Fee BBM Jun-23 Rutin
103 Bontang - Cor Site Jun-23 Rutin
103 Bontang - Cor Power Jun-23 Rutin
63 Seram - BBM Jun-23 Rutin
63 Seram - Cor Site Jun-23 Rutin
63 Seram - Cor Power Jun-23 Rutin
84 NBS - BBM Jun-23 Rutin
84 NBS - Cor Site Jun-23 Rutin
84 NBS - Cor Power Jun-23 Rutin
100 Malteng - BBM Jun-23 Rutin
100 Malteng - Cor Site Jun-23 Rutin
100 Malteng - Cor Power Jun-23 Rutin
104 Merauke - BBM Jun-23 Rutin
104 Merauke - Cor Site Jun-23 Rutin
104 Merauke - Cor Power Jun-23 Rutin
63 Seram - Msite Jul-23 Rutin
63 Seram - Mgenset Jul-23 Rutin
63 Seram - ETS Jul-23 Rutin
63 Seram- PJS Jul-23 Rutin
63 Seram - SCD Jul-23 Rutin
63 Seram - BBM Jul-23 Rutin
63 Seram - Cor Site Jul-23 Rutin
63 Seram - Cor Power Jul-23 Rutin
84 NBS - Msite Jul-23 Rutin
84 NBS - Mgenset Jul-23 Rutin
84 NBS - ETS Jul-23 Rutin
84 NBS- PJS Jul-23 Rutin
84 NBS - SCD Jul-23 Rutin
84 NBS - BBM Jul-23 Rutin
84 NBS - Cor Site Jul-23 Rutin
84 NBS - Cor Power Jul-23 Rutin
100 Malteng - Msite Jul-23 Rutin
100 Malteng- Mgenset Jul-23 Rutin
100 Malteng - ETS Jul-23 Rutin
100 Malteng - PJS Jul-23 Rutin
100 Malteng - SCD Jul-23 Rutin
100 Malteng - BBM Jul-23 Rutin
100 Malteng - Cor Site Jul-23 Rutin
100 Malteng - Cor Power Jul-23 Rutin
104 Merauke- ETS Jul-23 Rutin
104 Merauke -SCD Jul-23 Rutin
104 Merauke - Msite Jul-23 Rutin
104 Merauke - Mgenset Jul-23 Rutin
104 Merauke - PJS Jul-23 Rutin
104 Merauke - BBM Jul-23 Rutin
104 Merauke - Cor Site Jul-23 Rutin
104 Merauke - Cor Power Jul-23 Rutin
101 FMC Toli2 - MTC site Jul-23 Rutin
101 FMC Toli2 - MTC Genset Jul-23 Rutin
101 FMC Toli2 - BBM Jul-23 Rutin
101 FMC Toli2 - Fee BBM Jul-23 Rutin
101 FMC Toli2 - Corr Site Jul-23 Rutin
101 FMC Toli2 - Corr Power Jul-23 Rutin
101 FMC Toli2 - Fee PJS Jul-23 Rutin
101 FMC Toli2 - Bantek Jul-23 Rutin
101 FMC Toli2 - PJS Reg Jul-23 Rutin
101 SCD Ex DMT Jul-23 Rutin
101 SCD Mobile Jul-23 Rutin
91 Tarakan- Msite Jul-23 Rutin
91 Tarakan - Mgenset Jul-23 Rutin
91 Tarakan - SCD Jul-23 Rutin
91 Tarakan - PJS Jul-23 Rutin
91 Tarakan - Fee Sec Jul-23 Rutin
91 Tarakan - ETS Jul-23 Rutin
91 Tarakan - BBM Jul-23 Rutin
91 Tarakan - Fee BBM Jul-23 Rutin
91 Tarakan - Cor Site Jul-23 Rutin
91 Tarakan - Cor Power Jul-23 Rutin
92 Sintang- Msite Jul-23 Rutin
92 Sintang - Mgenset Jul-23 Rutin
92 Sintang - SCD Jul-23 Rutin
92 Sintang - PJS Jul-23 Rutin
92 Sintang - Fee Sec Jul-23 Rutin
92 Sintang - ETS Jul-23 Rutin
92 Sintang - BBM Jul-23 Rutin
92 Sintang - Fee BBM Jul-23 Rutin
92 Sintang - Cor Site Jul-23 Rutin
92 Sintang - Cor Power Jul-23 Rutin
99 Sanggau - Msite Jul-23 Rutin
99 Sanggau - Mgenset Jul-23 Rutin
99 Sanggau - PJS Jul-23 Rutin
99 Sanggau - Fee PJS Jul-23 Rutin
99 Sanggau - SCD Jul-23 Rutin
99 Sanggau - ETS Jul-23 Rutin
99 Sanggau - BBM Jul-23 Rutin
99 Sanggau - Fee BBM Jul-23 Rutin
99 Sanggau - Cor Site Jul-23 Rutin
99 Sanggau - Cor Power Jul-23 Rutin
102 Ponti - Msite Jul-23 Rutin
102 Ponti - Mgenset Jul-23 Rutin
102 Ponti - PJS Jul-23 Rutin
102 Ponti - Fee PJS Jul-23 Rutin
102 Ponti - SCD Jul-23 Rutin
102 Ponti - ETS Jul-23 Rutin
102 Ponti - BBM Jul-23 Rutin
102 Ponti - Fee BBM Jul-23 Rutin
102 Ponti - Cor Site Jul-23 Rutin
102 Ponti - Cor Power Jul-23 Rutin
103 Bontang - Msite Jul-23 Rutin
103 Bontang - Mgenset Jul-23 Rutin
103 Bontang - PJS Jul-23 Rutin
103 Bontang - Fee PJS Jul-23 Rutin
103 Bontang - SCD Jul-23 Rutin
103 Bontang - ETS Jul-23 Rutin
103 Bontang - BBM Jul-23 Rutin
103 Bontang - Fee BBM Jul-23 Rutin
103 Bontang - Cor Site Jul-23 Rutin
103 Bontang - Cor Power Jul-23 Rutin
7,222,957,447
PO
Done Status Dokumen
Proses BAPP Nilai 16,226,056
Tagihan
Done Done 16,772,500
Done Done 66,877,740
Done Proses BAST 17,321,313
Done Proses BAST 18,460,000
Done Proses BAST 27,260,189
Done Proses BAST 8,216,800
Done Ready SAP 27,140,000
Done Ready SAP 25,000,000
Done Ready SAP 43,000,000
Done Ready SAP 14,624,000
Done Ready SAP 257,225,000
Done NY 34,916,551
Done NY 25,490,000
Done Proses BAST 76,127,975
Done Proses BAPP 13,107,774
Done Proses BAPP 25,505,323
Done Ready SAP 17,760,000
Done Ready SAP 9,200,000
Done Ready SAP 66,650,000
Done Ready SAP 15,313,000
Done Ready SAP 258,300,000
Done Proses BAPP 16,404,638
Done NY 8,679,375
Done NY 29,100,000
Done NY 7,111,587
Done Proses BAPP 24,599,700
Done NY 35,002,413
Done NY 3,253,696
Done Proses BAPP 3,249,200
Done Done 18,110,000
Done Done 16,800,000
Done NY 6,070,000
Done NY 6,760,070
Done Done 1,208,000
Done Done 36,150,000
Done NY 19,500,000
Done NY 16,100,000
Done NY 78,190,000
Done NY 7,797,250
Done NY 6,070,000
Done NY 6,410,070
Done NY 1,208,000
Done NY 36,150,000
Done Proses BAST 16,355,000
Done Proses BAST 24,000,000
Done Proses BAST 43,000,000
Done Proses BAST 14,624,000
Done Proses BAST 257,225,000
Done Proses BAST 17,760,000
Done Proses BAST 9,200,000
Done Proses BAST 50,700,000
Done Proses BAST 4,157,200
Done Proses BAST 79,266,900
Done Proses BAPP 41,250,000
Done Proses BAPP 384,040,325
Done Proses BAPP 25,387,916
Done Proses BAPP 13,400,000
Done Proses BAPP 9,645,000
Done Proses BAPP 6,460,000
Done Proses BAPP 113,200,000
Done Proses BAPP 9,100,000
Done Proses BAPP 41,806,200
Done Proses BAPP 48,600,000
NY Proses BAPP 14,731,531
NY Proses BAPP 1,611,900
NY Proses BAPP 23,216,138
NY Proses BAPP 8,634,640
Done Proses BAPP 3,913,000
Done Proses BAPP 22,050,000
Done Proses BAPP 153,000,000
Done Proses BAPP 3,350,000
Done Proses BAPP 33,325,000
Done Proses BAPP 25,800,000
NY Proses BAPP 462,626,250
NY Proses BAPP 44,872,500
NY Proses BAPP 23,290,577
NY Proses BAPP 13,551,453
Done Proses BAPP 3,500,000
Done Proses BAPP 7,900,000
Done Proses BAPP 4,050,000
Done Proses BAPP 12,325,000
Done Proses BAPP 148,500,000
Done Proses BAPP 25,800,000
NY Proses BAPP 67,887,954
NY Proses BAPP 7,056,700
NY Proses BAPP 10,662,110
NY Proses BAPP 11,285,133
Done Ready SAP 24,075,969
Done Ready SAP 1,442,000
Done Ready SAP 15,250,000
Done Ready SAP 11,876,232
Done Ready SAP 9,735,333
Done NY 9,735,333
Done Ready SAP 231,313,125
Done Ready SAP 20,210,400
Done Ready SAP 13,516,932
Done Ready SAP 10,903,883
Done NY 90,010,695
Done NY 31,789,500
Done NY 33,167,875
Done Proses BAPP 15,801,765
Done Proses BAPP 34,116,844
Done Proses BAPP 1,315,750
Done NY 4,380,810
Done NY 14,682,410
Done NY 3,100,000
Done Proses BAST 33,658,470
Done NY 13,256,501
Done NY -
NY NY
NY NY
NY NY 43,000,000
NY NY 14,624,000
NY NY 257,225,000
NY NY
NY NY
NY NY
NY NY
NY NY
NY NY 66,650,000
NY NY 15,313,000
NY NY 258,300,000
NY NY
NY NY
NY NY
Done NY
Done NY
Done NY 50,700,000
Done NY 4,157,200
Done NY 79,266,900
NY NY
NY NY
NY NY
NY NY 41,250,000
NY NY 384,040,325
NY NY
NY NY
NY NY 9,645,000
NY NY
NY NY
NY NY
NY NY 20,990,000
NY NY 15,400,000
NY NY 78,190,000
NY NY 7,797,250
NY NY 16,000,000
NY NY 16,000,000
NY NY 1,208,000
NY NY 36,150,000
NY NY 38,000,000
NY NY 13,600,000
NY NY 188,916,000
NY NY 12,848,000
NY NY 6,880,000
NY NY 113,200,000
NY NY 9,100,000
NY NY 41,806,200
NY NY 48,600,000
NY NY
NY NY
NY NY 23,216,138
NY NY 8,634,640
NY NY 4,203,000
NY NY 24,000,000
NY NY 153,000,000
NY NY 3,350,000
NY NY 33,325,000
NY NY 25,800,000
NY NY
NY NY
NY NY 24,540,577
NY NY 13,551,453
NY NY 4,750,000
NY NY 9,300,000
NY NY 4,050,000
NY NY 12,325,000
NY NY 148,500,000
NY NY 25,800,000
Done NY
Done NY
Done NY 11,912,110
Done NY 11,285,133
NY NY 8,850,000
NY NY 9,800,000
NY NY 1,250,000
NY NY 12,900,000
NY NY 68,500,000
NY NY 57,200,000
NY NY
NY NY
NY NY 16,500,000
NY NY 11,876,232
NY NY 6,985,000
NY NY 16,500,000
NY NY 10,150,000
NY NY 500,000
NY NY 89,250,000
NY NY 26,750,000
NY NY
NY NY
NY NY 14,766,932
NY NY 10,903,883
Posisi Dok
drop tiket pln oksibil agar sgra bapp
drop tiket pln oksibil agar sgra bapp
mba eva
mba eva
mba eva
mba eva

7 tiket open, sudah lunas


4 tiket open, sudah lunas
mba eva
need budget 5 juta untuk closing masih hold NOP
BAPP NOP

BAPP NOP
3 tiket open
3 tiket open
belum pengisian 224 L (4,2 Juta)
pending ttd harso issue harga bbm
sisa closing 2 tiket ineom
tunggu approval tiket
tunggu baep
mas Andi
mas Andi
mas Andi
mas Andi
mas Andi
pak bayu
pak bayu
pak bayu
pak bayu
pak bayu
ready bast tunggu KPI
ready bast tunggu KPI
ready bast tunggu KPI
ready bast tunggu KPI
ready bast tunggu KPI
tunggu baep
tunggu baep
tunggu baep
tunggu baep
tunggu baep
tunggu baep
tunggu baep
tunggu baep
tunggu baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
hold karena bapp mbp dan baep
proses collect dokumentasi
tiket 4,sudah lunas
tiket 4,sudah lunas
NOP
NOP
NOP
belum pengisian 138 L (2,6 Juta)
13 tiket, lunas sisa closing
3 tiket, lunas sisa closing
mba eva
on check tiket power & need budget

need budget untuk ke mereruni


no isu budget
Tgl Update
27-Jan-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
21-Jul-23
21-Jul-23

27-Jul-23
27-Jul-23
27-Jul-23

5-Jul-23
18-Jul-23
18-Jul-23
18-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
21-Jul-23
21-Jul-23
21-Jul-23
21-Jul-23
21-Jul-23
21-Jul-23
21-Jul-23
21-Jul-23
21-Jul-23
21-Jul-23
25-Jul-23
25-Jul-23
25-Jul-23
25-Jul-23
25-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23

27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
27-Jul-23
22-Jul-23
27-Jul-23

27-Jul-23
27-Jul-23
NO PO TGL PO

4200035724 9-Jan-23

4200035724 9-Jan-23

4400012247 29-Jan-23

4400012247 29-Jan-23
4400012253 30-Jan-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035894 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035893 14-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035870 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035869 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035874 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035882 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035878 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035881 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035883 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035911 15-Feb-23
4200035971 21-Feb-23
4200035971 21-Feb-23
4200035971 21-Feb-23
4200035971 21-Feb-23
4200035971 21-Feb-23
4200035971 21-Feb-23
4200035982 21-Feb-23
4200035982 21-Feb-23
4200035982 21-Feb-23
4200035982 21-Feb-23
4200035982 21-Feb-23
4200035982 21-Feb-23
4200035983 21-Feb-23
4200035983 21-Feb-23
4200035983 21-Feb-23
4200035983 21-Feb-23
4200035983 21-Feb-23
4200035983 21-Feb-23
4200035984 21-Feb-23
4200035984 21-Feb-23
4200035984 21-Feb-23
4200035984 21-Feb-23
4200035984 21-Feb-23
4200035984 21-Feb-23
4200035985 21-Feb-23
4200035985 21-Feb-23
4200035985 21-Feb-23
4200035985 21-Feb-23
4200035985 21-Feb-23
4200035985 21-Feb-23
4200036011 23-Feb-23
4200036011 23-Feb-23
4200036011 23-Feb-23
4200036011 23-Feb-23
4200036011 23-Feb-23
4200036011 23-Feb-23
4200036021 23-Feb-23
4200036021 23-Feb-23
4200036021 23-Feb-23
4200036029 23-Feb-23
4200036029 23-Feb-23
4200036029 23-Feb-23
4200036032 23-Feb-23
4200036032 23-Feb-23
4200036032 23-Feb-23
4200036030 23-Feb-23
4200036030 23-Feb-23
4200036030 23-Feb-23
4200036089 27-Feb-23
4200036089 27-Feb-23
4200036089 27-Feb-23
4200036089 27-Feb-23
4200036089 27-Feb-23
4200036091 27-Feb-23
4200036091 27-Feb-23
4200036091 27-Feb-23
4200036091 27-Feb-23
4200036094 27-Feb-23
4200036094 27-Feb-23
4200036094 27-Feb-23
4200036094 27-Feb-23
4200036093 27-Feb-23
4200036093 27-Feb-23
4200036093 27-Feb-23
4200036093 27-Feb-23
4200036139 2-Mar-23
4200036139 2-Mar-23
4200036139 2-Mar-23
4200036139 2-Mar-23
4200036139 2-Mar-23
4200036139 2-Mar-23
4200036143 3-Mar-23
4200036143 3-Mar-23
4200036143 3-Mar-23
4200036143 3-Mar-23
4200036143 3-Mar-23
4200036143 3-Mar-23
4200036142 3-Mar-23
4200036142 3-Mar-23
4200036142 3-Mar-23
4200036142 3-Mar-23
4200036142 3-Mar-23
4200036142 3-Mar-23
4200036168 3-Mar-23
4200036168 3-Mar-23
4200036168 3-Mar-23
4200036168 3-Mar-23
4200036168 3-Mar-23
4200036168 3-Mar-23
4200036170 3-Mar-23
4200036170 3-Mar-23
4200036170 3-Mar-23
4200036170 3-Mar-23
4200036170 3-Mar-23
4200036170 3-Mar-23
4200036205 8-Mar-23
4200036205 8-Mar-23
4200036205 8-Mar-23

4400012390 13-Mar-23

4400012390 13-Mar-23

4200036295 14-Mar-23
4200036406 27-Mar-23
4200036406 27-Mar-23
4200036406 27-Mar-23
4200036406 27-Mar-23
4200036406 27-Mar-23
4200036406 27-Mar-23

4400012479 27-Mar-23
4400012479 27-Mar-23
4200036450 27-Mar-23
4200036450 27-Mar-23
4200036450 27-Mar-23
4200036450 27-Mar-23
4200036450 27-Mar-23
4200036452 27-Mar-23
4200036452 27-Mar-23
4200036452 27-Mar-23
4200036452 27-Mar-23
420003645 27-Mar-23
420003645 27-Mar-23
420003645 27-Mar-23
420003645 27-Mar-23
4200036454 27-Mar-23
4200036454 27-Mar-23
4200036454 27-Mar-23
4200036407 28-Mar-23
4200036407 28-Mar-23
4200036407 28-Mar-23
4200036407 28-Mar-23
4200036407 28-Mar-23
4200036407 28-Mar-23
4200036411 28-Mar-23
4200036411 28-Mar-23
4200036411 28-Mar-23
4200036411 28-Mar-23
4200036411 28-Mar-23
4200036411 28-Mar-23
4200036410 28-Mar-23
4200036410 28-Mar-23
4200036410 28-Mar-23
4200036410 28-Mar-23
4200036410 28-Mar-23
4200036410 28-Mar-23
4200036478 28-Mar-23
4200036478 28-Mar-23
4200036478 28-Mar-23
4200036478 28-Mar-23
4200036478 28-Mar-23
4200036478 28-Mar-23

4400012574 3-Apr-23

4400012574 3-Apr-23
4200036598 4-Apr-23
4200036601 4-Apr-23
4200036601 4-Apr-23
4200036601 4-Apr-23
4200036601 4-Apr-23
4200036601 4-Apr-23
4200036601 4-Apr-23
4400012586 6-Apr-23
4400012586 6-Apr-23
4400012586 6-Apr-23

4400012586 6-Apr-23

4400012586 6-Apr-23

4400012586 6-Apr-23
4400012586 6-Apr-23

4400012586 6-Apr-23
4400012586 6-Apr-23

4400012586 6-Apr-23
4400012586 6-Apr-23
4400012586 6-Apr-23

4400012587 6-Apr-23

4400012587 6-Apr-23

4400012587 6-Apr-23
4400012587 6-Apr-23
4400012587 6-Apr-23
4400012587 6-Apr-23
4400012587 6-Apr-23

4400012587 6-Apr-23

4400012695 12-Apr-23

4400012695 12-Apr-23
4400012695 12-Apr-23

4400012695 12-Apr-23

4400012695 12-Apr-23
4200036917 24-Apr-23
4200036917 24-Apr-23
4200036917 24-Apr-23
4200036917 24-Apr-23
4200036917 24-Apr-23
4200036917 24-Apr-23
4400012850 24-Apr-23

4400012850 24-Apr-23

4400012850 24-Apr-23
4400012850 24-Apr-23
4400012850 24-Apr-23
4400012850 24-Apr-23

4400012850 24-Apr-23
4400012850 24-Apr-23
4400012850 24-Apr-23
4400012850 24-Apr-23
4400012850 24-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036934 25-Apr-23
4200036950 28-Apr-23
4200036950 28-Apr-23
4200036950 28-Apr-23
4200036950 28-Apr-23
4200036948 28-Apr-23
4200036948 28-Apr-23
4200036948 28-Apr-23
4200036948 28-Apr-23
4200036949 28-Apr-23
4200036949 28-Apr-23
4200036949 28-Apr-23
4200036949 28-Apr-23
4200036951 28-Apr-23
4200036951 28-Apr-23
4200036951 28-Apr-23
4200036951 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4400012877 28-Apr-23
4200036960 2-May-23
4200036960 2-May-23
4200036960 2-May-23
4200036960 2-May-23
4200036960 2-May-23
4200036969 2-May-23
4200036969 2-May-23
4200036969 2-May-23
4200036969 2-May-23
4200036969 2-May-23
4200036969 2-May-23
4200036968 2-May-23
4200036968 2-May-23
4200036968 2-May-23
4200036968 2-May-23
4200036968 2-May-23
4200036968 2-May-23
4200036965 2-May-23
4200036965 2-May-23
4200036965 2-May-23
4200036965 2-May-23
4200036965 2-May-23
4200036965 2-May-23
4200036966 3-May-23
4200036966 3-May-23
4200036966 3-May-23
4200036966 3-May-23
4200036966 3-May-23
4200036966 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036982 3-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036980 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036985 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200036984 4-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037040 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037034 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037031 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037032 9-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037050 10-May-23
4200037171 22-May-23
4200037171 22-May-23
4200037171 22-May-23
4200037171 22-May-23
4200037171 22-May-23
4200037171 22-May-23
4200037178 22-May-23
4200037178 22-May-23
4200037178 22-May-23
4200037178 22-May-23
4200037178 22-May-23
4200037178 22-May-23

4400013041 22-May-23
4200037173 22-May-23
4200037173 22-May-23
4200037173 22-May-23
4200037173 22-May-23
4200037173 22-May-23
4200037173 22-May-23
4200037177 22-May-23
4200037177 22-May-23
4200037177 22-May-23
4200037177 22-May-23
4200037177 22-May-23
4200037177 22-May-23
4200037183 22-May-23
4200037183 22-May-23
4200037183 22-May-23
4200037183 22-May-23
4200037183 22-May-23
4200037186 22-May-23
4200037186 22-May-23
4200037186 22-May-23
4200037186 22-May-23
4200037189 22-May-23
4200037189 22-May-23
4200037189 22-May-23
4200037189 22-May-23
4200037188 22-May-23
4200037188 22-May-23
4200037188 22-May-23
4200037188 22-May-23
4200037259 25-May-23
4200037259 25-May-23
4200037259 25-May-23
4200037259 25-May-23
4200037259 25-May-23
4200037259 25-May-23
4400013099 28-May-23
4400013099 28-May-23
4400013099 28-May-23
4400013125 29-May-23
4400013125 29-May-23
4400013125 29-May-23
4400013125 29-May-23
4400013125 29-May-23
4400013125 29-May-23
4400013125 29-May-23
4400013125 29-May-23
4400013125 29-May-23
4400013125 29-May-23
4400013125 29-May-23
4400013125 29-May-23

4400013125 29-May-23

4400013125 29-May-23
4400013125 29-May-23

4400013125 29-May-23
4400013125 29-May-23
4200037314 29-May-23
4200037314 29-May-23
4200037314 29-May-23
4200037314 29-May-23
4200037314 29-May-23
4200037314 29-May-23
4200037748 22-Jun-23
4200037748 22-Jun-23
4200037748 22-Jun-23
4200037748 22-Jun-23
4200037748 22-Jun-23
4200037748 22-Jun-23
4200037652 21-Jun-23
4200037652 21-Jun-23
4200037652 21-Jun-23
4200037652 21-Jun-23
4200037652 21-Jun-23
4200037654 21-Jun-23
4200037654 21-Jun-23
4200037654 21-Jun-23
4200037654 21-Jun-23
4200037656 21-Jun-23
4200037656 21-Jun-23
4200037656 21-Jun-23
4200037656 21-Jun-23
4200037657 21-Jun-23
4200037657 21-Jun-23
4200037657 21-Jun-23
4200037657 21-Jun-23
4200037703 22-Jun-23
4200037703 22-Jun-23
4200037703 22-Jun-23
4200037703 22-Jun-23
4200037703 22-Jun-23
4200037703 22-Jun-23
4200037710 22-Jun-23
4200037710 22-Jun-23
4200037710 22-Jun-23
4200037710 22-Jun-23
4200037710 22-Jun-23
4200037706 22-Jun-23
4200037706 22-Jun-23
4200037706 22-Jun-23
4200037706 22-Jun-23
4200037706 22-Jun-23
4200037706 22-Jun-23
4200037705 22-Jun-23
4200037705 22-Jun-23
4200037705 22-Jun-23
4200037705 22-Jun-23
4200037705 22-Jun-23
4200037705 22-Jun-23
4400013394 27-Jun-23
4400013394 27-Jun-23
4200038006 2-Jul-23
4200038006 2-Jul-23
4200038006 2-Jul-23
4200038006 2-Jul-23
4200038006 2-Jul-23
4200038006 2-Jul-23
4400013501 10-Jul-23
4400013501 10-Jul-23
4400013501 10-Jul-23
4400013501 10-Jul-23
4400013501 10-Jul-23
4400013501 10-Jul-23
4400013501 10-Jul-23
4400013501 10-Jul-23

4400013500 10-Jul-23
4400013500 10-Jul-23
4400013500 10-Jul-23

4400013500 10-Jul-23
4400013500 10-Jul-23
4400013500 10-Jul-23
4400013500 10-Jul-23
4400013500 10-Jul-23

4400013502 10-Jul-23
4400013502 10-Jul-23
4400013502 10-Jul-23

4400013502 10-Jul-23
4400013502 10-Jul-23
4400013502 10-Jul-23
4400013502 10-Jul-23
4400013502 10-Jul-23
4400013611 21-Jul-23
4400013611 21-Jul-23
4400013611 21-Jul-23
4400013611 21-Jul-23
4400013611 21-Jul-23
4400013612 21-Jul-23
4400013612 21-Jul-23
4400013612 21-Jul-23
Judul PO Periode Project
Market Validation Combat Area 4_FMC Reg11 2022 - Ketuapi &
2023 Non Rutin
SOLUSINAB045
Market Validation Combat Area 4_FMC Reg11 2022 - Ketuapi &
2023 Non Rutin
SOLUSINAB045

FMC Additional Tarakan - Outer SB Additional Des 2022 Dec-22 Rutin

FMC Additional Tarakan - Outer SB Additional Des 2022 Dec-22 Rutin


Instalasi Network Support Event CAPGOMEH Pontianak 2023 2023 Non Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sanggau Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Kota Q1 2023 Mar-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Jan-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Jan-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Jan-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Jan-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Jan-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Jan-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Jan-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Jan-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Jan-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Jan-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Feb-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Feb-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Feb-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Feb-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Feb-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Feb-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Feb-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Mar-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Mar-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Mar-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Mar-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Mar-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Mar-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Mar-23 Rutin
FMC Fix Samarinda-Bontang Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Jan-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Feb-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Mar-23 Rutin
FMC Fix Pontianak-Sintang Q1 2023 Mar-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Jan-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Jan-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Jan-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Jan-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Jan-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Jan-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Jan-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Jan-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Jan-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Jan-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Feb-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Feb-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Feb-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Feb-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Feb-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Feb-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Feb-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Feb-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Feb-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Mar-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Mar-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Mar-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Mar-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Mar-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Mar-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Mar-23 Rutin
FMC Fix Tarakan-Outer Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Jan-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Feb-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Jan-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Feb-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Seram_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Jan-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Feb-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Jan-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Feb-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_ Merauke_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Jan-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Feb-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Fix_Cluster Toli-toli_Q1 2023 Mar-23 Rutin
FMC_Var_Toli-toli_Januari 2023 Jan-23 Rutin
FMC_Var_Toli-toli_Januari 2023 Jan-23 Rutin
FMC_Var_Toli-toli_Januari 2023 Jan-23 Rutin
FMC_Var_Toli-toli_Januari 2023 Jan-23 Rutin
FMC_Var_Toli-toli_Januari 2023 Jan-23 Rutin
FMC_Var_Toli-toli_Januari 2023 Jan-23 Rutin
FMC Fix ETS Pontianak - Kota Jan - Mar 2023 Jan-23 Rutin
FMC Fix ETS Pontianak - Kota Jan - Mar 2023 Jan-23 Rutin
FMC Fix ETS Pontianak - Kota Jan - Mar 2023 Feb-23 Rutin
FMC Fix ETS Pontianak - Kota Jan - Mar 2023 Feb-23 Rutin
FMC Fix ETS Pontianak - Kota Jan - Mar 2023 Mar-23 Rutin
FMC Fix ETS Pontianak - Kota Jan - Mar 2023 Mar-23 Rutin
FMC Fix ETS Pontianak - Sanggau Jan - Mar 2023 Jan-23 Rutin
FMC Fix ETS Pontianak - Sanggau Jan - Mar 2023 Jan-23 Rutin
FMC Fix ETS Pontianak - Sanggau Jan - Mar 2023 Feb-23 Rutin
FMC Fix ETS Pontianak - Sanggau Jan - Mar 2023 Feb-23 Rutin
FMC Fix ETS Pontianak - Sanggau Jan - Mar 2023 Mar-23 Rutin
FMC Fix ETS Pontianak - Sanggau Jan - Mar 2023 Mar-23 Rutin
FMC Fix ETS Pontianak - Sintang Jan - Mar 2023 Jan-23 Rutin
FMC Fix ETS Pontianak - Sintang Jan - Mar 2023 Jan-23 Rutin
FMC Fix ETS Pontianak - Sintang Jan - Mar 2023 Feb-23 Rutin
FMC Fix ETS Pontianak - Sintang Jan - Mar 2023 Feb-23 Rutin
FMC Fix ETS Pontianak - Sintang Jan - Mar 2023 Mar-23 Rutin
FMC Fix ETS Pontianak - Sintang Jan - Mar 2023 Mar-23 Rutin
FMC Fix ETS Tarakan - Outer Jan - Mar 202 Jan-23 Rutin
FMC Fix ETS Tarakan - Outer Jan - Mar 202 Jan-23 Rutin
FMC Fix ETS Tarakan - Outer Jan - Mar 202 Feb-23 Rutin
FMC Fix ETS Tarakan - Outer Jan - Mar 202 Feb-23 Rutin
FMC Fix ETS Tarakan - Outer Jan - Mar 202 Mar-23 Rutin
FMC Fix ETS Tarakan - Outer Jan - Mar 202 Mar-23 Rutin
FMC Fix ETS Samarinda - Bontang Jan - Mar 2023 Jan-23 Rutin
FMC Fix ETS Samarinda - Bontang Jan - Mar 2023 Jan-23 Rutin
FMC Fix ETS Samarinda - Bontang Jan - Mar 2023 Feb-23 Rutin
FMC Fix ETS Samarinda - Bontang Jan - Mar 2023 Feb-23 Rutin
FMC Fix ETS Samarinda - Bontang Jan - Mar 2023 Mar-23 Rutin
FMC Fix ETS Samarinda - Bontang Jan - Mar 2023 Mar-23 Rutin
FMC Pemberdayaan Warga Samarinda Bontang Jan - Mar 23 Jan-23 Rutin
FMC Pemberdayaan Warga Samarinda Bontang Jan - Mar 23 Feb-23 Rutin
FMC Pemberdayaan Warga Samarinda Bontang Jan - Mar 23 Mar-23 Rutin
FMC Pemberdayaan Warga Pontianak Kota Jan sd Mar 23 Jan-23 Rutin
FMC Pemberdayaan Warga Pontianak Kota Jan sd Mar 23 Feb-23 Rutin
FMC Pemberdayaan Warga Pontianak Kota Jan sd Mar 23 Mar-23 Rutin
FMC Pemberdayaan Warga Pontianak Sintang Jan sd Mar 23 Jan-23 Rutin
FMC Pemberdayaan Warga Pontianak Sintang Jan sd Mar 23 Feb-23 Rutin
FMC Pemberdayaan Warga Pontianak Sintang Jan sd Mar 23 Mar-23 Rutin
FMC Pemberdayaan Warga Pontianak Sanggau Jan sd Mar 23 Jan-23 Rutin
FMC Pemberdayaan Warga Pontianak Sanggau Jan sd Mar 23 Feb-23 Rutin
FMC Pemberdayaan Warga Pontianak Sanggau Jan sd Mar 23 Mar-23 Rutin
FMC_Var_Biak Serui Nabire Jan 2023 Jan-23 Rutin
FMC_Var_Biak Serui Nabire Jan 2023 Jan-23 Rutin
FMC_Var_Biak Serui Nabire Jan 2023 Jan-23 Rutin
FMC_Var_Biak Serui Nabire Jan 2023 Jan-23 Rutin
FMC_Var_Biak Serui Nabire Jan 2023 Jan-23 Rutin
FMC_Var_ Maluku Tenggara Jan 2023 Jan-23 Rutin
FMC_Var_ Maluku Tenggara Jan 2023 Jan-23 Rutin
FMC_Var_ Maluku Tenggara Jan 2023 Jan-23 Rutin
FMC_Var_ Maluku Tenggara Jan 2023 Jan-23 Rutin
FMC_Var_ Seram Jan 2023 Jan-23 Rutin
FMC_Var_ Seram Jan 2023 Jan-23 Rutin
FMC_Var_ Seram Jan 2023 Jan-23 Rutin
FMC_Var_ Seram Jan 2023 Jan-23 Rutin
FMC_Var_ Merauke Jan 2023 Jan-23 Rutin
FMC_Var_ Merauke Jan 2023 Jan-23 Rutin
FMC_Var_ Merauke Jan 2023 Jan-23 Rutin
FMC_Var_ Merauke Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Kota Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Kota Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Kota Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Kota Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Kota Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Kota Jan 2023 Jan-23 Rutin
FMC Var Samarinda-Bontang Jan 2023 Jan-23 Rutin
FMC Var Samarinda-Bontang Jan 2023 Jan-23 Rutin
FMC Var Samarinda-Bontang Jan 2023 Jan-23 Rutin
FMC Var Samarinda-Bontang Jan 2023 Jan-23 Rutin
FMC Var Samarinda-Bontang Jan 2023 Jan-23 Rutin
FMC Var Samarinda-Bontang Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sintang Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sintang Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sintang Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sintang Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sintang Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sintang Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sanggau Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sanggau Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sanggau Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sanggau Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sanggau Jan 2023 Jan-23 Rutin
FMC Var Pontianak-Sanggau Jan 2023 Jan-23 Rutin
FMC Var Tarakan-Outer Jan 2023 Jan-23 Rutin
FMC Var Tarakan-Outer Jan 2023 Jan-23 Rutin
FMC Var Tarakan-Outer Jan 2023 Jan-23 Rutin
FMC Var Tarakan-Outer Jan 2023 Jan-23 Rutin
FMC Var Tarakan-Outer Jan 2023 Jan-23 Rutin
FMC Var Tarakan-Outer Jan 2023 Jan-23 Rutin
FMC Pemberdayaan Warga Tarakan Outer Jan - Mar 23 Jan-23 Rutin
FMC Pemberdayaan Warga Tarakan Outer Jan - Mar 23 Feb-23 Rutin
FMC Pemberdayaan Warga Tarakan Outer Jan - Mar 23 Mar-23 Rutin

FMC Rental SCD Fix Non BBM SAMARINDA - Bontang Q1 2023 Feb-23 Rutin

FMC Rental SCD Fix Non BBM SAMARINDA - Bontang Q1 2023 Mar-23 Rutin

Levelling Antena Site BIA033 Samofa 2023 Non Rutin


FMC Var Pontianak-Kota Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Kota Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Kota Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Kota Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Kota Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Kota Feb 2023 Feb-23 Rutin

Antenna Leveling Tarakan Outer Q1 2023 Q1 2023 Non Rutin


Antenna Leveling Tarakan Outer Q1 2023 Q1 2023 Non Rutin
FMC_Var_Biak Serui Nabire Feb 2023 Feb-23 Rutin
FMC_Var_Biak Serui Nabire Feb 2023 Feb-23 Rutin
FMC_Var_Biak Serui Nabire Feb 2023 Feb-23 Rutin
FMC_Var_Biak Serui Nabire Feb 2023 Feb-23 Rutin
FMC_Var_Biak Serui Nabire Feb 2023 Feb-23 Rutin
FMC_Var_ Maluku Tenggara Feb 2023 Feb-23 Rutin
FMC_Var_ Maluku Tenggara Feb 2023 Feb-23 Rutin
FMC_Var_ Maluku Tenggara Feb 2023 Feb-23 Rutin
FMC_Var_ Maluku Tenggara Feb 2023 Feb-23 Rutin
FMC_Var_ Seram Feb 2023 Feb-23 Rutin
FMC_Var_ Seram Feb 2023 Feb-23 Rutin
FMC_Var_ Seram Feb 2023 Feb-23 Rutin
FMC_Var_ Seram Feb 2023 Feb-23 Rutin
FMC_Var_ Merauke Feb 2023 Feb-23 Rutin
FMC_Var_ Merauke Feb 2023 Feb-23 Rutin
FMC_Var_ Merauke Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sanggau Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sanggau Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sanggau Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sanggau Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sanggau Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sanggau Feb 2023 Feb-23 Rutin
FMC Var Samarinda-Bontang Feb 2023 Feb-23 Rutin
FMC Var Samarinda-Bontang Feb 2023 Feb-23 Rutin
FMC Var Samarinda-Bontang Feb 2023 Feb-23 Rutin
FMC Var Samarinda-Bontang Feb 2023 Feb-23 Rutin
FMC Var Samarinda-Bontang Feb 2023 Feb-23 Rutin
FMC Var Samarinda-Bontang Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sintang Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sintang Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sintang Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sintang Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sintang Feb 2023 Feb-23 Rutin
FMC Var Pontianak-Sintang Feb 2023 Feb-23 Rutin
FMC_Var_Tolitoli_Februari 2023 Feb-23 Rutin
FMC_Var_Tolitoli_Februari 2023 Feb-23 Rutin
FMC_Var_Tolitoli_Februari 2023 Feb-23 Rutin
FMC_Var_Tolitoli_Februari 2023 Feb-23 Rutin
FMC_Var_Tolitoli_Februari 2023 Feb-23 Rutin
FMC_Var_Tolitoli_Februari 2023 Feb-23 Rutin

FMC Rental SCD Fix Non BBM SAMARINDA - Bontang Maret - April 2023 Mar-23 Rutin

FMC Rental SCD Fix Non BBM SAMARINDA - Bontang Maret - April 2023 Mar-23 Rutin
FMC Var additional Tarakan- Outer Feb 2023 Feb-23 Rutin
FMC Var Tarakan-Outer Feb 2023 Feb-23 Rutin
FMC Var Tarakan-Outer Feb 2023 Feb-23 Rutin
FMC Var Tarakan-Outer Feb 2023 Feb-23 Rutin
FMC Var Tarakan-Outer Feb 2023 Feb-23 Rutin
FMC Var Tarakan-Outer Feb 2023 Feb-23 Rutin
FMC Var Tarakan-Outer Feb 2023 Feb-23 Rutin
Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin
Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin
Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin

Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin

Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin

Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin


Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin

Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin


Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin

Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin


Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin
Relokasi Combat Arrow COK190 Felubun Merauke Non Rutin

Pekerjaan Leveling Antena MRK196 tower 42 m Non Rutin

Pekerjaan Leveling Antena MRK196 tower 42 m Non Rutin

Pekerjaan Leveling Antena MRK196 tower 42 m Non Rutin


Pekerjaan Leveling Antena MRK196 tower 42 m Non Rutin
Pekerjaan Leveling Antena MRK196 tower 42 m Non Rutin
Pekerjaan Leveling Antena MRK196 tower 42 m Non Rutin
Pekerjaan Leveling Antena MRK196 tower 42 m Non Rutin

Pekerjaan Leveling Antena MRK196 tower 42 m Non Rutin

Pekerjaan Dismantle Combat COK274 Non Rutin

Pekerjaan Dismantle Combat COK274 Non Rutin


Pekerjaan Dismantle Combat COK274 Non Rutin

Pekerjaan Dismantle Combat COK274 Non Rutin

Pekerjaan Dismantle Combat COK274 Non Rutin


FMC_Var_Tolitoli_Maret 2023 Mar-23 Rutin
FMC_Var_Tolitoli_Maret 2023 Mar-23 Rutin
FMC_Var_Tolitoli_Maret 2023 Mar-23 Rutin
FMC_Var_Tolitoli_Maret 2023 Mar-23 Rutin
FMC_Var_Tolitoli_Maret 2023 Mar-23 Rutin
FMC_Var_Tolitoli_Maret 2023 Mar-23 Rutin
Pekerjaan Combat Desa Sibado Q1 2023 Non Rutin

Pekerjaan Combat Desa Sibado Q1 2023 Non Rutin

Pekerjaan Combat Desa Sibado Q1 2023 Non Rutin


Pekerjaan Combat Desa Sibado Q1 2023 Non Rutin
Pekerjaan Combat Desa Sibado Q1 2023 Non Rutin
Pekerjaan Combat Desa Sibado Q1 2023 Non Rutin

Pekerjaan Combat Desa Sibado Q1 2023 Non Rutin


Pekerjaan Combat Desa Sibado Q1 2023 Non Rutin
Pekerjaan Combat Desa Sibado Q1 2023 Non Rutin
Pekerjaan Combat Desa Sibado Q1 2023 Non Rutin
Pekerjaan Combat Desa Sibado Q1 2023 Non Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Apr-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 May-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Fix_ToliToli_Q2_2023 Jun-23 Rutin
FMC_Var_ Seram Mar 2023 Mar-23 Rutin
FMC_Var_ Seram Mar 2023 Mar-23 Rutin
FMC_Var_ Seram Mar 2023 Mar-23 Rutin
FMC_Var_ Seram Mar 2023 Mar-23 Rutin
FMC_Var_ Maluku Tenggara Mar 2023 Mar-23 Rutin
FMC_Var_ Maluku Tenggara Mar 2023 Mar-23 Rutin
FMC_Var_ Maluku Tenggara Mar 2023 Mar-23 Rutin
FMC_Var_ Maluku Tenggara Mar 2023 Mar-23 Rutin
MC_Var_ Merauke Mar 202 Mar-23 Rutin
MC_Var_ Merauke Mar 202 Mar-23 Rutin
MC_Var_ Merauke Mar 202 Mar-23 Rutin
MC_Var_ Merauke Mar 202 Mar-23 Rutin
FMC_Var_Biak Serui Nabire Mar 2023 Mar-23 Rutin
FMC_Var_Biak Serui Nabire Mar 2023 Mar-23 Rutin
FMC_Var_Biak Serui Nabire Mar 2023 Mar-23 Rutin
FMC_Var_Biak Serui Nabire Mar 2023 Mar-23 Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
Relokasi Combat Cruiser COK303 Simpati Estate A Merauke 2023 Non Rutin
FMC Var Tarakan-Outer Mar 2023 Mar-23 Rutin
FMC Var Tarakan-Outer Mar 2023 Mar-23 Rutin
FMC Var Tarakan-Outer Mar 2023 Mar-23 Rutin
FMC Var Tarakan-Outer Mar 2023 Mar-23 Rutin
FMC Var Tarakan-Outer Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Kota Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Kota Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Kota Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Kota Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Kota Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Kota Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sanggau Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sanggau Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sanggau Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sanggau Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sanggau Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sanggau Mar 2023 Mar-23 Rutin
FMC Var Samarinda-Bontang Mar 2023 Mar-23 Rutin
FMC Var Samarinda-Bontang Mar 2023 Mar-23 Rutin
FMC Var Samarinda-Bontang Mar 2023 Mar-23 Rutin
FMC Var Samarinda-Bontang Mar 2023 Mar-23 Rutin
FMC Var Samarinda-Bontang Mar 2023 Mar-23 Rutin
FMC Var Samarinda-Bontang Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sintang Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sintang Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sintang Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sintang Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sintang Mar 2023 Mar-23 Rutin
FMC Var Pontianak-Sintang Mar 2023 Mar-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Apr-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 May-23 Rutin
FMC_Fix_ Maluku Tenggara_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Apr-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 May-23 Rutin
FMC_Fix_ Biak Serui Nabire_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Seram_Q2 2023 Apr-23 Rutin
FMC_Fix_ Seram_Q2 2023 May-23 Rutin
FMC_Fix_ Seram_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Apr-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC_Fix_ Merauke_Q2 2023 Jun-23 Rutin
FMC_Fix_ Merauke_Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Apr-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 May-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Tarakan-Outer Q2 2023 Jun-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Apr-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Apr-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Apr-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Apr-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Apr-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Apr-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Apr-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Apr-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Apr-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Apr-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Apr-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 May-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 May-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 May-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 May-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 May-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 May-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 May-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 May-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 May-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 May-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Jun-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Jun-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Jun-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Jun-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Jun-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Jun-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Jun-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Jun-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Jun-23 Rutin
FMC Fix Samarinda-Bontang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 May-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 May-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 May-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 May-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 May-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 May-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 May-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 May-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 May-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 May-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Kota Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sanggau Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Apr-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 May-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Fix Pontianak-Sintang Q2 2023 Jun-23 Rutin
FMC Var Pontianak-Kota Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Kota Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Kota Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Kota Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Kota Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Kota Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Sanggau Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Sanggau Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Sanggau Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Sanggau Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Sanggau Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Sanggau Apr 2023 Apr-23 Rutin

Integrasi Catuan Daya Corporate SAA215 2023 Non Rutin


FMC Var Pontianak-Sintang Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Sintang Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Sintang Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Sintang Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Sintang Apr 2023 Apr-23 Rutin
FMC Var Pontianak-Sintang Apr 2023 Apr-23 Rutin
FMC Var Tarakan-Outer Apr 2023 Apr-23 Rutin
FMC Var Tarakan-Outer Apr 2023 Apr-23 Rutin
FMC Var Tarakan-Outer Apr 2023 Apr-23 Rutin
FMC Var Tarakan-Outer Apr 2023 Apr-23 Rutin
FMC Var Tarakan-Outer Apr 2023 Apr-23 Rutin
FMC Var Tarakan-Outer Apr 2023 Apr-23 Rutin
FMC_Var_Biak Serui Nabire_Apr 2023 Apr-23 Rutin
FMC_Var_Biak Serui Nabire_Apr 2023 Apr-23 Rutin
FMC_Var_Biak Serui Nabire_Apr 2023 Apr-23 Rutin
FMC_Var_Biak Serui Nabire_Apr 2023 Apr-23 Rutin
FMC_Var_Biak Serui Nabire_Apr 2023 Apr-23 Rutin
FMC_Var_ Maluku Tenggara_Apr 2023 Apr-23 Rutin
FMC_Var_ Maluku Tenggara_Apr 2023 Apr-23 Rutin
FMC_Var_ Maluku Tenggara_Apr 2023 Apr-23 Rutin
FMC_Var_ Maluku Tenggara_Apr 2023 Apr-23 Rutin
FMC_Var_ Seram_ Apr 2023 Apr-23 Rutin
FMC_Var_ Seram_ Apr 2023 Apr-23 Rutin
FMC_Var_ Seram_ Apr 2023 Apr-23 Rutin
FMC_Var_ Seram_ Apr 2023 Apr-23 Rutin
FMC_Var_ Merauke_Apr 2023 Apr-23 Rutin
FMC_Var_ Merauke_Apr 2023 Apr-23 Rutin
FMC_Var_ Merauke_Apr 2023 Apr-23 Rutin
FMC_Var_ Merauke_Apr 2023 Apr-23 Rutin
FMC_Var_Tolitoli_April 2023 Apr-23 Rutin
FMC_Var_Tolitoli_April 2023 Apr-23 Rutin
FMC_Var_Tolitoli_April 2023 Apr-23 Rutin
FMC_Var_Tolitoli_April 2023 Apr-23 Rutin
FMC_Var_Tolitoli_April 2023 Apr-23 Rutin
FMC_Var_Tolitoli_April 2023 Apr-23 Rutin
FMC Rental SCD Fix Non BBM SAMARINDA - Bontang Q2 2023 Apr-23 Rutin
FMC Rental SCD Fix Non BBM SAMARINDA - Bontang Q2 2023 May-23 Rutin
FMC Rental SCD Fix Non BBM SAMARINDA - Bontang Q2 2023 Jun-23 Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin

Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin

Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin


Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin

Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin


Pekerjaan pergantian Trafo DGL008 Lombongan_Q2 202 2023 Non Rutin
FMC Var Samarinda-Bontang Apr 2023 Apr-23 Rutin
FMC Var Samarinda-Bontang Apr 2023 Apr-23 Rutin
FMC Var Samarinda-Bontang Apr 2023 Apr-23 Rutin
FMC Var Samarinda-Bontang Apr 2023 Apr-23 Rutin
FMC Var Samarinda-Bontang Apr 2023 Apr-23 Rutin
FMC Var Samarinda-Bontang Apr 2023 Apr-23 Rutin
FMC_Var_Toli-toli_May 2023 May-23 Rutin
FMC_Var_Toli-toli_May 2023 May-23 Rutin
FMC_Var_Toli-toli_May 2023 May-23 Rutin
FMC_Var_Toli-toli_May 2023 May-23 Rutin
FMC_Var_Toli-toli_May 2023 May-23 Rutin
FMC_Var_Toli-toli_May 2023 May-23 Rutin
FMC_Var_Biak Serui Nabire Mei 2023 May-23 Rutin
FMC_Var_Biak Serui Nabire Mei 2023 May-23 Rutin
FMC_Var_Biak Serui Nabire Mei 2023 May-23 Rutin
FMC_Var_Biak Serui Nabire Mei 2023 May-23 Rutin
FMC_Var_Biak Serui Nabire Mei 2023 May-23 Rutin
FMC_Var_ Maluku Tenggara_Mei 2023 May-23 Rutin
FMC_Var_ Maluku Tenggara_Mei 2023 May-23 Rutin
FMC_Var_ Maluku Tenggara_Mei 2023 May-23 Rutin
FMC_Var_ Maluku Tenggara_Mei 2023 May-23 Rutin
FMC_Var_ Merauke_Mei 2023 May-23 Rutin
FMC_Var_ Merauke_Mei 2023 May-23 Rutin
FMC_Var_ Merauke_Mei 2023 May-23 Rutin
FMC_Var_ Merauke_Mei 2023 May-23 Rutin
FMC_Var_ Seram_ Mei 2023 May-23 Rutin
FMC_Var_ Seram_ Mei 2023 May-23 Rutin
FMC_Var_ Seram_ Mei 2023 May-23 Rutin
FMC_Var_ Seram_ Mei 2023 May-23 Rutin
FMC Var Pontianak-Sanggau Mei 2023 May-23 Rutin
FMC Var Pontianak-Sanggau Mei 2023 May-23 Rutin
FMC Var Pontianak-Sanggau Mei 2023 May-23 Rutin
FMC Var Pontianak-Sanggau Mei 2023 May-23 Rutin
FMC Var Pontianak-Sanggau Mei 2023 May-23 Rutin
FMC Var Pontianak-Sanggau Mei 2023 May-23 Rutin
FMC Var Tarakan-Outer Mei 2023 May-23 Rutin
FMC Var Tarakan-Outer Mei 2023 May-23 Rutin
FMC Var Tarakan-Outer Mei 2023 May-23 Rutin
FMC Var Tarakan-Outer Mei 2023 May-23 Rutin
FMC Var Tarakan-Outer Mei 2023 May-23 Rutin
FMC Var Samarinda-Bontang Mei 2023 May-23 Rutin
FMC Var Samarinda-Bontang Mei 2023 May-23 Rutin
FMC Var Samarinda-Bontang Mei 2023 May-23 Rutin
FMC Var Samarinda-Bontang Mei 2023 May-23 Rutin
FMC Var Samarinda-Bontang Mei 2023 May-23 Rutin
FMC Var Samarinda-Bontang Mei 2023 May-23 Rutin
FMC Var Pontianak-Sintang Mei 2023 May-23 Rutin
FMC Var Pontianak-Sintang Mei 2023 May-23 Rutin
FMC Var Pontianak-Sintang Mei 2023 May-23 Rutin
FMC Var Pontianak-Sintang Mei 2023 May-23 Rutin
FMC Var Pontianak-Sintang Mei 2023 May-23 Rutin
FMC Var Pontianak-Sintang Mei 2023 May-23 Rutin
FMC Rental SCD Fix Non BBM SAA068 Jakluay dan SAA080 TB Swakarsa May-23 Non Rutin
FMC Rental SCD Fix Non BBM SAA068 Jakluay dan SAA080 TB Swakarsa Jun-23 Non Rutin
FMC Var Pontianak-Kota Mei 2023 May-23 Rutin
FMC Var Pontianak-Kota Mei 2023 May-23 Rutin
FMC Var Pontianak-Kota Mei 2023 May-23 Rutin
FMC Var Pontianak-Kota Mei 2023 May-23 Rutin
FMC Var Pontianak-Kota Mei 2023 May-23 Rutin
FMC Var Pontianak-Kota Mei 2023 May-23 Rutin
Pekerjaan Combat Desa Ogotion Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Ogotion Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Ogotion Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Ogotion Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Ogotion Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Ogotion Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Ogotion Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Ogotion Q2 2023 2023 Non Rutin

Pekerjaan Combat Desa Jono Oge Q2 2023 2023 Non Rutin


Pekerjaan Combat Desa Jono Oge Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Jono Oge Q2 2023 2023 Non Rutin

Pekerjaan Combat Desa Jono Oge Q2 2023 2023 Non Rutin


Pekerjaan Combat Desa Jono Oge Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Jono Oge Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Jono Oge Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Jono Oge Q2 2023 2023 Non Rutin

Pekerjaan Combat Desa Tanjung Padang Q2 2023 2023 Non Rutin


Pekerjaan Combat Desa Tanjung Padang Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Tanjung Padang Q2 2023 2023 Non Rutin

Pekerjaan Combat Desa Tanjung Padang Q2 2023 2023 Non Rutin


Pekerjaan Combat Desa Tanjung Padang Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Tanjung Padang Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Tanjung Padang Q2 2023 2023 Non Rutin
Pekerjaan Combat Desa Tanjung Padang Q2 2023 2023 Non Rutin
Pekerjaan Relokasi Rumah Genset MSH074 2023 Non Rutin
Pekerjaan Relokasi Rumah Genset MSH074 2023 Non Rutin
Pekerjaan Relokasi Rumah Genset MSH074 2023 Non Rutin
Pekerjaan Relokasi Rumah Genset MSH074 2023 Non Rutin
Pekerjaan Relokasi Rumah Genset MSH074 2023 Non Rutin
Pembuatan Base Frame MSH044_MSH042_MSH041_MSH055 2023 Non Rutin
Pembuatan Base Frame MSH044_MSH042_MSH041_MSH055 2023 Non Rutin
Pembuatan Base Frame MSH044_MSH042_MSH041_MSH055 2023 Non Rutin
Cluster Item PO Qty Harga Satuan

Service Variable Activity Non


NBS Power 1 46,000,000
Service Variable Activity Non
NBS Power 1 43,000,000

FMC-Corrective Site TRK


Tarakan Outer Des 2022 1 5,423,762
FMC-Corrective Power TRK
Tarakan Outer Des 2022 1 2,029,822
Ponti Kota Instalasi Network Support Event CAPGOMEH Pontianak 2023 1 7,300,000
Sanggau MTC Genset Type A 1 2,300,000
Sanggau MTC Genset Type C 10 700,000
Sanggau SCD Mobile B12 2 19,500,000
Sanggau SCD Mobile B22 4 12,375,000
Sanggau SCD Fix Type D 3 30,000,000
Sanggau MTC site Type A 4 900,000
Sanggau MTC site Type C 11 350,000
Sanggau MTC site Type D 3 500,000
Sanggau Fee Pemberdayaan Warga 13 25,000
Sanggau Security Site 4 3,000,000
Sanggau MTC site Type A 1 900,000
Sanggau MTC site Type C 8 350,000
Sanggau MTC site Type D 2 500,000
Sanggau MTC Genset Type A 1 2,300,000
Sanggau MTC Genset Type C 8 700,000
Sanggau SCD Fix Type D 3 30,000,000
Sanggau Fee Pemberdayaan Warga 13 25,000
Sanggau Security Site 4 3,000,000
Sanggau SCD Mobile B12 2 19,500,000
Sanggau SCD Mobile B22 4 12,375,000
Sanggau MTC Genset Type A 1 2,300,000
Sanggau MTC Genset Type C 7 700,000
Sanggau SCD Mobile B12 2 19,500,000
Sanggau SCD Mobile B22 4 12,375,000
Sanggau SCD Fix Type D 3 30,000,000
Sanggau MTC site Type C 5 350,000
Sanggau MTC site Type D 6 500,000
Sanggau Fee Pemberdayaan Warga 13 25,000
Sanggau Security Site 4 3,000,000
Ponti Kota MTC Genset Type C 14 700,000
Ponti Kota SCD Mobile B22 7 13,700,000
Ponti Kota MTC site Type A 8 750,000
Ponti Kota MTC site Type C 24 300,000
Ponti Kota MTC site Type D 1 425,000
Ponti Kota MTC site Type E 7 350,000
Ponti Kota Fee Pemberdayaan Warga 4 25,000
Ponti Kota Security Site 4 3,200,000
Ponti Kota MTC site Type A 3 750,000
Ponti Kota MTC site Type C 24 300,000
Ponti Kota MTC site Type D 1 425,000
Ponti Kota MTC Genset Type C 19 700,000
Ponti Kota Fee Pemberdayaan Warga 4 25,000
Ponti Kota Security Site 4 3,200,000
Ponti Kota SCD Mobile B22 7 13,700,000
Ponti Kota MTC Genset Type C 18 700,000
Ponti Kota SCD Mobile B22 7 13,700,000
Ponti Kota MTC site Type A 2 750,000
Ponti Kota MTC site Type C 23 300,000
Ponti Kota MTC site Type D 3 425,000
Ponti Kota Fee Pemberdayaan Warga 4 25,000
Ponti Kota Security Site 4 3,200,000
Bontang MTC Genset Type A 5 2,500,000
Bontang MTC Genset Type C 5 800,000
Bontang SCD Mobile B12 1 18,000,000
Bontang SCD Mobile B22 5 14,250,000
Bontang MTC site Type A 6 860,000
Bontang MTC site Type B 1 501,450
Bontang MTC site Type C 13 350,000
Bontang MTC site Type D 3 505,000
Bontang MTC site Type E 1 400,000
Bontang Fee Pemberdayaan Warga 20 25,000
Bontang MTC site Type C 17 350,000
Bontang MTC site Type E 2 400,000
Bontang MTC Genset Type A 5 2,500,000
Bontang MTC Genset Type C 5 800,000
Bontang Fee Pemberdayaan Warga 20 25,000
Bontang SCD Mobile B12 1 18,000,000
Bontang SCD Mobile B22 5 14,250,000
Bontang MTC site Type A 1 860,000
Bontang MTC site Type C 12 350,000
Bontang MTC site Type E 1 400,000
Bontang Fee Pemberdayaan Warga 20 25,000
Bontang MTC Genset Type A 5 2,500,000
Bontang MTC Genset Type C 5 800,000
Bontang SCD Mobile B12 1 18,000,000
Bontang SCD Mobile B22 5 14,250,000
Sintang MTC Genset Type A 5 2,200,000
Sintang MTC Genset Type C 20 650,000
Sintang SCD Mobile B22 7 12,000,000
Sintang SCD Fix Type C 2 21,000,000
Sintang SCD Fix Type D 1 27,000,000
Sintang MTC site Type A 1 796,500
Sintang MTC site Type C 16 290,000
Sintang MTC site Type D 3 400,000
Sintang Fee Pemberdayaan Warga 13 25,000
Sintang Security Site 11 3,000,000
Sintang MTC site Type A 2 796,500
Sintang MTC site Type C 5 290,000
Sintang MTC Genset Type A 5 2,200,000
Sintang MTC Genset Type C 20 650,000
Sintang SCD Fix Type C 2 21,000,000
Sintang SCD Fix Type D 1 27,000,000
Sintang Fee Pemberdayaan Warga 13 25,000
Sintang Security Site 11 3,000,000
Sintang SCD Mobile B22 7 12,000,000
Sintang MTC Genset Type A 5 2,200,000
Sintang MTC Genset Type C 20 650,000
Sintang SCD Mobile B22 7 12,000,000
Sintang SCD Fix Type C 2 21,000,000
Sintang SCD Fix Type D 1 27,000,000
Sintang MTC site Type A 2 796,500
Sintang MTC site Type C 8 290,000
Sintang MTC site Type D 4 200,000
Sintang Fee Pemberdayaan Warga 13 25,000
Sintang Security Site 11 3,000,000
Tarakan MTC Genset Type C 8 760,000
Tarakan MTC Genset Type D 1 800,000
Tarakan SCD Mobile B22 10 13,000,000
Tarakan SCD Fix Type C 3 22,000,000
Tarakan MTC site Type A 7 1,000,000
Tarakan MTC site Type C 11 450,000
Tarakan MTC site Type D 4 650,000
Tarakan MTC site Type E 3 499,000
Tarakan Fee Pemberdayaan Warga 27 30,000
Tarakan Security Site 10 4,200,000
Tarakan MTC site Type A 2 1,000,000
Tarakan MTC site Type C 13 450,000
Tarakan MTC site Type D 4 650,000
Tarakan MTC Genset Type C 9 760,000
Tarakan MTC Genset Type D 1 800,000
Tarakan SCD Fix Type C 3 22,000,000
Tarakan Fee Pemberdayaan Warga 27 30,000
Tarakan Security Site 10 4,200,000
Tarakan SCD Mobile B22 10 13,000,000
Tarakan MTC Genset Type C 10 760,000
Tarakan MTC Genset Type D 1 800,000
Tarakan SCD Mobile B22 10 13,000,000
Tarakan SCD Fix Type C 3 22,000,000
Tarakan MTC site Type A 1 1,000,000
Tarakan MTC site Type C 16 450,000
Tarakan Fee Pemberdayaan Warga 27 30,000
Tarakan Security Site 10 4,200,000
Malteng MTC site Type A 2 1,000,000
Malteng MTC site Type C 22 370,000
Malteng MTC site Type D 2 790,000
Malteng MTC site Type E 8 435,000
Malteng MTC Genset Type D 7 1,040,000
Malteng SCD Mobile B21 2 11,200,000
Malteng SCD Mobile B22 2 15,800,000
Malteng SCD Fix Type C 1 25,266,900
Malteng Technical Support 6 4,700,000
Malteng Sewa Mobil 3 6,000,000
Malteng Sewa Motor 6 750,000
Malteng Pemberdayaan Warga 1 3,349,200
Malteng Fee Pemberdayaan Warga 8 101,000
Malteng MTC site Type A 4 1,000,000
Malteng MTC site Type C 13 370,000
Malteng MTC site Type D 3 790,000
Malteng MTC site Type E 2 435,000
Malteng MTC Genset Type D 7 1,040,000
Malteng SCD Mobile B21 2 11,200,000
Malteng SCD Mobile B22 2 15,800,000
Malteng SCD Fix Type C 1 25,266,900
Malteng Technical Support 6 4,700,000
Malteng Sewa Mobil 3 6,000,000
Malteng Sewa Motor 6 750,000
Malteng Pemberdayaan Warga 1 3,349,200
Malteng Fee Pemberdayaan Warga 8 101,000
Malteng MTC site Type A 2 1,000,000
Malteng MTC site Type C 19 370,000
Malteng MTC site Type D 3 790,000
Malteng MTC site Type E 2 435,000
Malteng MTC Genset Type D 7 1,040,000
Malteng SCD Mobile B21 2 11,200,000
Malteng SCD Mobile B22 2 15,800,000
Malteng SCD Fix Type C 1 25,266,900
Malteng Technical Support 6 4,700,000
Malteng Sewa Mobil 3 6,000,000
Malteng Sewa Motor 6 750,000
Malteng Pemberdayaan Warga 1 3,349,200
Malteng Fee Pemberdayaan Warga 8 101,000
Seram MTC site Type A 5 800,000
Seram MTC site Type C 30 350,000
Seram MTC site Type D 14 780,000
Seram MTC site Type E 1 435,000
Seram MTC Genset Type B 1 2,500,000
Seram MTC Genset Type C 11 950,000
Seram MTC Genset Type D 17 1,000,000
Seram SCD Mobile Tipe B12 1 17,325,000
Seram SCD Mobile Tipe B22 8 15,425,000
Seram SCD Fix Type C 5 23,300,000
Seram Technical Support 5 4,700,000
Seram Sewa Mobil 3 5,500,000
Seram Sewa Motor 5 600,000
Seram Pemberdayaan Warga 1 12,200,000
Seram Fee Pemberdayaan Warga 24 101,000
Seram MTC site Type A 4 800,000
Seram MTC site Type C 13 350,000
Seram MTC site Type D 9 780,000
Seram MTC Genset Type B 1 2,500,000
Seram MTC Genset Type C 10 950,000
Seram MTC Genset Type D 12 1,000,000
Seram SCD Mobile Tipe B12 1 17,325,000
Seram SCD Mobile Tipe B22 8 15,425,000
Seram SCD Fix Type C 5 23,300,000
Seram Technical Support 5 4,700,000
Seram Sewa Mobil 3 5,500,000
Seram Sewa Motor 5 600,000
Seram Pemberdayaan Warga 1 12,200,000
Seram Fee Pemberdayaan Warga 24 101,000
Seram MTC site Type A 6 800,000
Seram MTC site Type C 25 350,000
Seram MTC site Type D 16 780,000
Seram MTC site Type E 1 435,000
Seram MTC Genset Type B 1 2,500,000
Seram MTC Genset Type C 10 950,000
Seram MTC Genset Type D 13 1,000,000
Seram SCD Mobile Tipe B12 1 17,325,000
Seram SCD Mobile Tipe B22 8 15,425,000
Seram SCD Fix Type C 5 23,300,000
Seram Technical Support 5 4,700,000
Seram Sewa Mobil 3 5,500,000
Seram Sewa Motor 5 600,000
Seram Pemberdayaan Warga 1 12,200,000
Seram Fee Pemberdayaan Warga 24 101,000
NBS MTC site Type A 10 850,000
NBS MTC site Type C 19 370,000
NBS MTC site Type D 3 790,000
NBS MTC site Type E 1 650,000
NBS MTC Genset Type C 8 1,150,000
NBS SCD Mobile Tipe B22 6 15,550,000
NBS SCD Fix Type C 3 23,250,000
NBS SCD Fix Type D 3 31,750,000
NBS Technical Support 7 4,700,000
NBS Sewa Mobil 5 6,000,000
NBS Sewa Motor 5 750,000
NBS Pemberdayaan Warga 1 14,000,000
NBS Fee Pemberdayaan Warga 13 101,000
NBS MTC site Type A 10 850,000
NBS MTC site Type C 12 370,000
NBS MTC site Type D 2 790,000
NBS MTC site Type E 1 650,000
NBS MTC Genset Type C 7 1,150,000
NBS SCD Mobile Tipe B22 6 15,550,000
NBS SCD Fix Type C 3 23,250,000
NBS SCD Fix Type D 3 31,750,000
NBS Technical Support 7 4,700,000
NBS Sewa Mobil 5 6,000,000
NBS Sewa Motor 5 750,000
NBS Pemberdayaan Warga 1 14,000,000
NBS Fee Pemberdayaan Warga 13 101,000
NBS MTC site Type A 10 850,000
NBS MTC site Type C 10 370,000
NBS MTC site Type D 3 790,000
NBS MTC site Type E 1 650,000
NBS MTC Genset Type C 7 1,150,000
NBS SCD Mobile Tipe B22 6 15,550,000
NBS SCD Fix Type C 3 23,250,000
NBS SCD Fix Type D 3 31,750,000
NBS Technical Support 7 4,700,000
NBS Sewa Mobil 5 6,000,000
NBS Sewa Motor 5 750,000
NBS Pemberdayaan Warga 1 14,000,000
NBS Fee Pemberdayaan Warga 13 101,000
Merauke MTC site Type A 8 1,482,000
Merauke MTC site Type C 12 555,000
Merauke MTC site Type E 1 655,000
Merauke MTC Genset Type A 2 4,000,000
Merauke MTC Genset Type C 8 1,350,000
Merauke SCD Mobile Tipe B21 1 14,980,000
Merauke SCD Mobile Tipe B22 5 21,769,000
Merauke SCD Fix Type C 1 33,919,000
Merauke SCD Fix Type D 5 45,259,265
Merauke Technical Support 6 5,500,000
Merauke Sewa Mobil 1 7,500,000
Merauke Sewa Motor 1 750,000
Merauke Pemberdayaan Warga 1 7,500,000
Merauke Fee Pemberdayaan Warga 15 143,000
Merauke MTC site Type A 5 1,482,000
Merauke MTC site Type C 13 555,000
Merauke MTC site Type D 4 1,170,000
Merauke MTC Genset Type A 2 4,000,000
Merauke MTC Genset Type C 4 1,350,000
Merauke SCD Mobile Tipe B21 1 14,980,000
Merauke SCD Mobile Tipe B22 5 21,769,000
Merauke SCD Fix Type C 1 33,919,000
Merauke SCD Fix Type D 5 45,259,265
Merauke Technical Support 6 5,500,000
Merauke Sewa Mobil 1 7,500,000
Merauke Sewa Motor 1 750,000
Merauke Pemberdayaan Warga 1 7,500,000
Merauke Fee Pemberdayaan Warga 15 143,000
Merauke MTC site Type A 2 1,482,000
Merauke MTC site Type C 18 555,000
Merauke MTC site Type D 3 1,170,000
Merauke MTC site Type E 2 655,000
Merauke MTC Genset Type A 2 4,000,000
Merauke MTC Genset Type C 4 1,350,000
Merauke SCD Mobile Tipe B21 1 14,980,000
Merauke SCD Mobile Tipe B22 5 21,769,000
Merauke SCD Fix Type C 1 33,919,000
Merauke SCD Fix Type D 5 45,259,265
Merauke Technical Support 6 5,500,000
Merauke Sewa Mobil 1 7,500,000
Merauke Sewa Motor 1 750,000
Merauke Pemberdayaan Warga 1 7,500,000
Merauke Fee Pemberdayaan Warga 15 143,000
Toli Bantuan Teknis -Orang 9 3,750,000
Toli Sewa Motor 4 600,000
Toli MTC Genset Type C 23 700,000
Toli SCD Mobile Semi Type A22 3 10,104,000
Toli SCD Mobile Full Type B22 9 13,600,000
Toli SCD Mobile Full Type B23 1 12,500,000
Toli Penjaga Site Backbone 15 60,000
Toli Penjaga Site Reguler 11 28,000
Toli Pemberdayaan Warga 1 38,000,000
Toli SCD Mobile Full Type B22 EXDMT 1 13,600,000
Toli SCD Mobile Full Type B23 EXDMT 1 12,500,000
Toli MTC site Type A 18 550,000
Toli MTC site Type C 22 200,000
Toli MTC site Type D 1 530,000
Toli Bantuan Teknis -Orang 9 3,750,000
Toli Sewa Motor 4 600,000
Toli MTC Genset Type C 33 700,000
Toli SCD Mobile Semi Type A22 4 10,104,000
Toli SCD Mobile Full Type B22 10 13,600,000
Toli SCD Mobile Full Type B23 1 12,500,000
Toli Penjaga Site Backbone 15 60,000
Toli Penjaga Site Reguler 11 28,000
Toli Pemberdayaan Warga 1 38,000,000
Toli SCD Mobile Full Type B22 EXDMT 1 13,600,000
Toli MTC site Type A 18 550,000
Toli MTC site Type C 17 200,000
Toli MTC site Type D 2 530,000
Toli Bantuan Teknis -Orang 9 3,750,000
Toli Sewa Motor 4 600,000
Toli MTC Genset Type C 20 700,000
Toli SCD Mobile Semi Type A22 4 10,104,000
Toli SCD Mobile Full Type B22 10 13,600,000
Toli SCD Mobile Full Type B23 1 12,500,000
Toli Penjaga Site Backbone 15 60,000
Toli Penjaga Site Reguler 11 28,000
Toli Pemberdayaan Warga 1 38,000,000
Toli SCD Mobile Full Type B22 EXDMT 1 13,600,000
Toli MTC site Type A 18 550,000
Toli MTC site Type C 16 200,000
Toli MTC site Type D 3 530,000
Toli BBM Depo 1 50,597,280
Toli Jasa + Transport BBM Depo 1968 1,200
Toli BBM Non Depo 1 31,391,910
Toli Jasa + Transport BBM Non Depo 1221 1,850
Toli Corrective Genset 1 32,635,950
Toli Corrective Site 1 1,100,000
Ponti Kota Bantuan Teknis -Orang 13 3,900,000
Ponti Kota Motor Bantek 13 500,000
Ponti Kota Bantuan Teknis -Orang 13 3,900,000
Ponti Kota Motor Bantek 13 500,000
Ponti Kota Bantuan Teknis -Orang 13 3,900,000
Ponti Kota Motor Bantek 13 500,000
Sanggau Bantuan Teknis -Orang 6 3,800,000
Sanggau Motor Bantek 6 500,000
Sanggau Bantuan Teknis -Orang 6 3,800,000
Sanggau Motor Bantek 6 500,000
Sanggau Bantuan Teknis -Orang 6 3,800,000
Sanggau Motor Bantek 6 500,000
Sintang Bantuan Teknis -Orang 6 3,800,000
Sintang Motor Bantek 6 500,000
Sintang Bantuan Teknis -Orang 6 3,800,000
Sintang Motor Bantek 6 500,000
Sintang Bantuan Teknis -Orang 6 3,800,000
Sintang Motor Bantek 6 500,000
Tarakan Bantuan Teknis -Orang 9 4,900,000
Tarakan Motor Bantek 9 500,000
Tarakan Bantuan Teknis -Orang 9 4,900,000
Tarakan Motor Bantek 9 500,000
Tarakan Bantuan Teknis -Orang 9 4,900,000
Tarakan Motor Bantek 9 500,000
Bontang Bantuan Teknis -Orang 5 4,800,000
Bontang Motor Bantek 5 550,000
Bontang Bantuan Teknis -Orang 5 4,800,000
Bontang Motor Bantek 5 550,000
Bontang Bantuan Teknis -Orang 5 4,800,000
Bontang Motor Bantek 5 550,000
Bontang Pemberdayaan Warga 1 10,150,000
Bontang Pemberdayaan Warga 1 10,150,000
Bontang Pemberdayaan Warga 1 10,150,000
Ponti Kota Pemberdayaan Warga 1 1,250,000
Ponti Kota Pemberdayaan Warga 1 1,250,000
Ponti Kota Pemberdayaan Warga 1 1,250,000
Sintang Pemberdayaan Warga 1 3,350,000
Sintang Pemberdayaan Warga 1 3,350,000
Sintang Pemberdayaan Warga 1 3,350,000
Sanggau Pemberdayaan Warga 1 4,050,000
Sanggau Pemberdayaan Warga 1 4,050,000
Sanggau Pemberdayaan Warga 1 4,050,000
NBS BBM 1 12,231,330
NBS Tranportasi BBM Non Depo 478 8,350
NBS Tranportasi BBM Depo 32 3,000
NBS Corrective Power 1 2,337,000
NBS Corrective Site 1 7,702,344
Malteng BBM 1 19,162,417
Malteng Tranportasi BBM Non Depo 799 8,150
Malteng Corrective Power 1 16,032,500
Malteng Corrective Site 1 20,430,532
Seram BBM 1 64,754,100
Seram Tranportasi BBM Non Depo 2700 6,200
Seram Corrective Power 1 11,702,373
Seram Corrective Site 1 15,674,000
Merauke BBM 1 11,871,585
Merauke Tranportasi BBM Non Depo 495 12,212
Merauke Corrective Power 1 4,050,000
Merauke Corrective Site 1 31,939,376
Ponti Kota Jasa + Transport BBM Depo 556 1,400
Ponti Kota Jasa + Transport BBM Non Depo 435 1,700
Ponti Kota BBM Depo 1 14,195,375
Ponti Kota BBM Non Depo 1 11,106,094
Ponti Kota Corrective Genset 1 13,015,200
Ponti Kota Corrective Site 1 12,044,600
Bontang Jasa + Transport BBM Depo 4646 1,800
Bontang Jasa + Transport BBM Non Depo 4959 2,600
Bontang BBM Depo 1 118,622,655
Bontang BBM Non Depo 1 126,604,618
Bontang Corrective Genset 1 1,950,000
Bontang Corrective Site 1 9,457,500
Sintang Jasa + Transport BBM Depo 3768 1,300
Sintang Jasa + Transport BBM Non Depo 14340 2,800
Sintang BBM Depo 1 96,201,750
Sintang BBM Non Depo 1 366,118,125
Sintang Corrective Genset 1 23,213,250
Sintang Corrective Site 1 28,404,565
Sanggau Jasa + Transport BBM Depo 414 1,300
Sanggau Jasa + Transport BBM Non Depo 2376 2,800
Sanggau BBM Depo 1 10,569,938
Sanggau BBM Non Depo 1 60,662,250
Sanggau Corrective Genset 1 13,270,250
Sanggau Corrective Site 1 9,973,260
Tarakan Jasa + Transport BBM Depo 375 2,500
Tarakan Jasa + Transport BBM Non Depo 288 3,600
Tarakan BBM Depo 1 9,583,027
Tarakan BBM Non Depo 1 7,355,298
Tarakan Corrective Genset 1 5,555,000
Tarakan Corrective Site 1 34,700,500
Tarakan Pemberdayaan Warga 1 9,100,000
Tarakan Pemberdayaan Warga 1 9,100,000
Tarakan Pemberdayaan Warga 1 9,100,000
Rental SCD Fix Non BBM
Bontang 1 9,735,333
Rental SCD Fix Non BBM
Bontang 1 9,735,333
Corr_ Non PW_Levelling
NBS Antenna 1 6,178,500
Ponti Kota Jasa + Transport BBM Depo 531 1,400
Ponti Kota Jasa + Transport BBM Non Depo 768 1,700
Ponti Kota BBM Depo 1 13,614,176
Ponti Kota BBM Non Depo 1 19,677,741
Ponti Kota Corrective Genset 1 12,457,050
Ponti Kota Corrective Site 1 15,813,500
Antenna Leveling TJS059
TB_TNIBRIG
Tarakan Antenna Leveling Tarakan Outer Q1 2023 1 9,784,500
Tarakan Antenna Leveling TJS005 SALIMBATU 1 20,661,000
NBS BBM 1 13,461,646
NBS Jasa + Transport BBM Non Depo 525 8,350
NBS Jasa + Transport BBM Depo 29 3,000
NBS Corrective Power 1 7,231,188
NBS Corrective Non Power 1 8,087,388
Malteng BBM 1 6,494,176
Malteng Jasa + Transport BBM Non Depo 268 8,150
Malteng Corrective Power 1 14,675,500
Malteng Corrective Non Power 1 12,320,000
Seram BBM 1 47,731,501
Seram Jasa + Transport BBM Non Depo 1979 6,200
Seram Corrective Power 1 29,523,209
Seram Corrective Non Power 1 21,650,000
Merauke BBM 1 23,314,230
Merauke Jasa + Transport BBM Non Depo 1 11,760,156
Merauke Corrective Non Power 1 7,388,688
Sanggau Jasa + Transport BBM Depo 165 1,300
Sanggau Jasa + Transport BBM Non Depo 1806 2,800
Sanggau BBM Depo 1 4,230,394
Sanggau BBM Non Depo 1 46,303,583
Sanggau Corrective Genset 1 13,892,000
Sanggau Corrective Site 1 5,822,500
Bontang Jasa + Transport BBM Depo 3723 1,800
Bontang Jasa + Transport BBM Non Depo 3395 2,600
Bontang BBM Depo 1 95,461,912
Bontang BBM Non Depo 1 87,048,299
Bontang Corrective Genset 1 3,657,550
Bontang Corrective Site 1 6,664,000
Sintang Jasa + Transport BBM Depo 3687 1,300
Sintang Jasa + Transport BBM Non Depo 13795 2,800
Sintang BBM Depo 1 94,530,071
Sintang BBM Non Depo 1 353,686,556
Sintang Corrective Genset 1 24,463,400
Sintang Corrective Site 1 23,191,630
Toli BBM Depo 1 73,271,484
Toli Jasa + Transport BBM Depo 2838 1,200
Toli BBM Non Depo 1 7,977,762
Toli Jasa + Transport BBM Non Depo 309 1,850
Toli Corrective Genset 1 9,999,025
Toli Corrective Site 1 2,750,000
Rental SCD Fix Non BBM
Bontang Mar 23 2 9,735,333
Rental SCD Fix Non BBM
Bontang Apr 23 2 9,735,333
Tarakan Corrective Genset 1 6,970,749
Tarakan Jasa + Transport BBM Depo 822 2,500
Tarakan Jasa + Transport BBM Non Depo 406 3,600
Tarakan BBM Depo 1 21,083,129
Tarakan BBM Non Depo 1 10,410,614
Tarakan Corrective Genset 1 2,136,000
Tarakan Corrective Site 1 20,400,200
Merauke Mobilisasi Combat Jarak < 60km 1 7,500,000
Merauke Jasa Pembongkaran Combat 1 4,500,000
Merauke Jasa Pemasangan Combat 1 6,000,000
Jasa Pemasangan/Pelepasan
Merauke Kabel Optik RR 3 396,750
Jasa Pemasangan/Pelepasan
Merauke Kabel Power RR 3 396,750
Jasa Pelepasan &
Merauke Pemasangan RRU utk ting 3 1,504,344
Merauke Jasa Pelepasan Antena Sectoral outdoor t 3 1,850,000
Jasa Pemasangan Antena
Merauke Sectoral outdoor 3 1,500,000
Merauke Material kabel ties 30 cm 5 54,275
Pembersihan Lahan & Jasa
Merauke Sitac Lahan 1 3,000,000
Merauke PSB PIN 7.7KVA 1 15,000,000
Merauke Jasa Pemasangan Grounding 1 750,000
Jasa Pelepasan Antena
Merauke Sectoral outdoor t 3 1,850,000
Jasa Pemasangan Antena
Merauke Sectoral outdoor 3 1,500,000
Jasa Pemasangan/Pelepasan
Merauke Kabel Power RR 9 396,750
Merauke Jasa Pelepasan &Pemasangan RRU utk ting 9 1,504,344
Material Kabel Power
Merauke NYFGBY 4 x 16 Supre 45 210,674
Merauke Material Isolasi 5 8,550
Merauke Material kabel ties 30 cm 5 54,275
Matarial Bar Sambungan
Merauke Kabel Power RRU 9 50,000
pelepasan antena sectoral
NBS outdor 3 1,500,000
pelepasan combat dan
NBS mobilisasi 1 7,200,000
NBS Pembersihan Lahan 1 700,000
pelepasan kabel power RRU
NBS 2G/3G 3 450,000
Jasa Pelepasan Recti dan
NBS Batrey 1 2,850,000
Toli BBM Depo 1 39,324,800
Toli Jasa + Transport Depo 1600 1,200
Toli BBM Non Depo 1 8,258,208
Toli Jasa + Transport Non Depo 336 1,850
Toli Corrective Genset 1 30,496,400
Toli Corrective site 1 18,865,000
Toli Jasa Deinstalasi Combat FUN 1 1,000,000
Mobilisasi/Demobilisasi
Toli CombatFUN 1 1,250,000
Jasa Instal CombatFun 3band,
Toli Radio IP 1 6,500,000
Toli Material monopole 11 meter 1 5,775,000
Toli breaket mountig antena 3 sector 3 750,000
Toli material kabel sling 75 72,000
Buat Akses Jln Jembatan Site
Toli tebal 12cm 2 2,500,000
Toli jasa pengurusan sitac combat 1 1,000,000
Toli material tiang KWH box 9M 1 3,300,000
Toli PSB PLN 7700VA INCLUDE SLO + NIDI 1 12,000,000
Toli BOX KWH ukuran 1 410,000
Toli Bantuan Teknis 9 3,750,000
Toli Motor Bantek 4 600,000
Toli Maintenance Genset Type C 24 700,000
Toli SCD Mobile Type A22 4 10,104,000
Toli SCD Mobile Type B22 10 13,600,000
Toli SCD Mobile Type B23 1 12,500,000
Toli Fee PJS Backbone 15 60,000
Toli Fee PJS Reguler 11 28,000
Toli PJS Reguler 1 38,000,000
Toli SCD ex DMT Type B22 1 13,600,000
Toli Maintenance Site Type A 19 550,000
Toli Maintenance Site Type C 18 200,000
Toli Maintenance Site Type D 7 530,000
Toli Bantuan Teknis 9 3,750,000
Toli Motor Bantek 4 600,000
Toli Maintenance Genset Type C 24 700,000
Toli SCD Mobile Type A22 4 10,104,000
Toli SCD Mobile Type B22 10 13,600,000
Toli SCD Mobile Type B23 1 12,500,000
Toli Fee PJS Backbone 15 60,000
Toli Fee PJS Reguler 11 28,000
Toli PJS Reguler 1 38,000,000
Toli SCD ex DMT Type B22 1 13,600,000
Toli Maintenance Site Type A 20 550,000
Toli Maintenance Site Type C 17 200,000
Toli Maintenance Site Type D 7 530,000
Toli Bantuan Teknis 9 3,750,000
Toli Motor Bantek 4 600,000
Toli Maintenance Genset Type C 23 700,000
Toli SCD Mobile Type A22 4 10,104,000
Toli SCD Mobile Type B22 10 13,600,000
Toli SCD Mobile Type B23 1 12,500,000
Toli Fee PJS Backbone 15 60,000
Toli Fee PJS Reguler 11 28,000
Toli PJS Reguler 1 38,000,000
Toli SCD ex DMT Type B22 1 13,600,000
Toli Maintenance Site Type A 21 550,000
Toli Maintenance Site Type C 24 200,000
Toli Maintenance Site Type D 5 530,000
Toli Maintenance Site Type E 1 500,000
Seram BBM Non Depo 1 60,313,448
Seram Transportasi Non Depo 2489 6,200
Seram Corrective Power 1 27,954,270
Seram Corrective Non Power 1 15,950,000
Malteng BBM Non Depo 1 5,326,737
Malteng Transportasi Non Depo 219 8,150
Malteng Corrective Power 1 6,145,000
Malteng Corrective Non Power 1 14,731,750
Merauke BBM Non Depo 1 15,920,424
Merauke Transportasi Non Depo 657 12,212
Merauke Corrective Power 1 66,877,740
Merauke Corrective Non Power 1 16,772,500
NBS BBM 1 21,316,860
NBS Transportasi Non Depo 839 8,350
NBS Transportasi Depo 35 30,000
NBS Corrective Combat
Mobilisasi Non PowerCruiser 1 20,545,244
Merauke Jarak < 60km 1 14,750,000
Merauke Jasa Pembongkaran Combat Guyed Mash 1 12,000,000
Merauke Jasa Pemasangan Combat Guyed Mash 1 14,750,000
Merauke Jasa Pemasangan/pelepasan Kabel Optik RR 3 396,750
Merauke Jasa Pemasangan/pelepasan Kabel Power RR 3 396,750
Merauke Jasa Pelepasan & pernasangan RRU utk tin 3 1,504,344
Merauke Jasa Pelepasan Antena Sectoral outdoor t 3 1,850,000
Merauke Jasa Pemasangan Antena Sectoral outdoor 3 1,500,000
Merauke Jasa Pelepasan Antena 1+0<1.2 m 1 2,499,525
Merauke Jasa Pemasangan Antena 1+0<1.2 m 1 4,106,363
Merauke Jasa Pelepasan & Pemasangan Kabel Coaxia 1 500,000
Merauke Material kabel ties 30 cm 5 54,275
Merauke Pembersihan Lahan & Jasa Sitac Lahan 1 2,500,000
Merauke PSB PLN 7.7KVA 1 15,000,000
Merauke Jasa pemasangan Battery Kapasitas >130 A 12 250,000
Merauke Jasa pelepasan Battery kapasitas >1.30 A 12 250,000
Merauke Instalasi 1 750,000
Tarakan BBM Depo 1 16,198,624
Tarakan BBM Non Depo 1 10,680,242
Tarakan Jasa Transportasi Depo 664 2,500
Tarakan Jasa Transportasi Non Depo 438 3,600
Tarakan Corrective Site 1 23,187,500
Ponti Kota BBM Depo 1 12,213,451
Ponti Kota BBM Non Depo 1 10,139,239
Ponti Kota Jasa Transportasi Depo 501 1,400
Ponti Kota Jasa Transportasi Non Depo 416 1,700
Ponti Kota Corrective Genset 1 11,034,300
Ponti Kota Corrective Site 1 7,754,000
Sanggau BBM Depo 1 3,001,508
Sanggau BBM Non Depo 1 43,485,255
Sanggau Jasa Transportasi Depo 123 1,300
Sanggau Jasa Transportasi Non Depo 1782 2,800
Sanggau Corrective Genset 1 16,695,000
Sanggau Corrective Site 1 12,054,260
Bontang BBM Depo 1 104,621,814
Bontang BBM Non Depo 1 152,692,543
Bontang Jasa Transportasi Depo 4287 1,800
Bontang Jasa Transportasi Non Depo 6257 2,600
Bontang Corrective Genset 1 10,240,500
Bontang Corrective Site 1 10,300,000
Sintang BBM Depo 1 95,828,618
Sintang BBM Non Depo 1 318,281,808
Sintang Jasa Transportasi Depo 3927 1,300
Sintang Jasa Transportasi Non Depo 13043 2,800
Sintang Corrective Genset 1 10,043,600
Sintang Corrective Site 1 23,611,500
Malteng Bantuan Teknis 6 4,700,000
Malteng Bantuan Teknis 6 4,700,000
Malteng Bantuan Teknis 6 4,700,000
Malteng Maintenance Genset Type D 7 1,040,000
Malteng Maintenance Genset Type D 7 1,040,000
Malteng Maintenance Genset Type D 7 1,040,000
Malteng Maintenance Site Type A 4 1,000,000
Malteng Maintenance Site Type A 2 1,000,000
Malteng Maintenance Site Type A 4 1,000,000
Malteng Maintenance Site Type C 15 370,000
Malteng Maintenance Site Type C 20 370,000
Malteng Maintenance Site Type C 19 370,000
Malteng Maintenance Site Type D 2 790,000
Malteng Maintenance Site Type D 2 790,000
Malteng Maintenance Site Type D 2 790,000
Malteng Maintenance Site Type E 1 435,000
Malteng Maintenance Site Type E 1 435,000
Malteng Maintenance Site Type E 1 435,000
Malteng Mobil operasional tim 3 6,000,000
Malteng Mobil operasional tim 3 6,000,000
Malteng Mobil operasional tim 3 6,000,000
Malteng Pemberdayaan Warga 1 3,349,200
Malteng Pemberdayaan Warga 1 3,349,200
Malteng Pemberdayaan Warga 1 3,349,200
Malteng Pengamanan Site 8 101,000
Malteng Pengamanan Site 8 101,000
Malteng Pengamanan Site 8 101,000
Malteng SCD Fix Type C 1 25,266,900
Malteng SCD Fix Type C 1 25,266,900
Malteng SCD Fix Type C 1 25,266,900
Malteng Sepeda motor operasional 6 750,000
Malteng Sepeda motor operasional 6 750,000
Malteng Sepeda motor operasional 6 750,000
Malteng SCD Mobile Type B21 2 11,200,000
Malteng SCD Mobile Type B22 2 11,200,000
Malteng SCD Mobile Type B23 2 11,200,000
Malteng SCD Mobile Type B22 2 15,800,000
Malteng SCD Mobile Type B22 2 15,800,000
Malteng SCD Mobile Type B22 2 15,800,000
NBS Bantuan Teknis 7 4,700,000
NBS Bantuan Teknis 7 4,700,000
NBS Bantuan Teknis 7 4,700,000
NBS Maintenance Genset Type C 7 1,150,000
NBS Maintenance Genset Type C 7 1,150,000
NBS Maintenance Genset Type C 8 1,150,000
NBS Maintenance Site Type A 10 850,000
NBS Maintenance Site Type A 10 850,000
NBS Maintenance Site Type A 10 850,000
NBS Maintenance Site Type C 14 370,000
NBS Maintenance Site Type C 21 370,000
NBS Maintenance Site Type C 19 370,000
NBS Maintenance Site Type D 3 790,000
NBS Maintenance Site Type D 4 790,000
NBS Maintenance Site Type D 2 790,000
NBS Maintenance site Type E 1 650,000
NBS Mobil operasional tim 5 6,000,000
NBS Mobil operasional tim 5 6,000,000
NBS Mobil operasional tim 5 6,000,000
NBS Pemberdayaan Warga 1 14,000,000
NBS Pemberdayaan Warga 1 14,000,000
NBS Pemberdayaan Warga 1 14,000,000
NBS Pengamanan Site 13 101,000
NBS Pengamanan Site 13 101,000
NBS Pengamanan Site 13 101,000
NBS SCD Fix Type C 3 23,250,000
NBS SCD Fix Type C 3 23,250,000
NBS SCD Fix Type C 3 23,250,000
NBS SCD Fix Type D 3 31,750,000
NBS SCD Fix Type D 3 31,750,000
NBS SCD Fix Type D 3 31,750,000
NBS Sepeda motor operasional 5 750,000
NBS Sepeda motor operasional 5 750,000
NBS Sepeda motor operasional 5 750,000
NBS SCD Mobile Type B22 6 15,550,000
NBS SCD Mobile Type B22 6 15,550,000
NBS SCD Mobile Type B22 6 15,550,000
Seram Bantuan Teknis 5 4,700,000
Seram Bantuan Teknis 5 4,700,000
Seram Bantuan Teknis 5 4,700,000
Seram Maintenance Genset Type B 1 2,500,000
Seram Maintenance Genset Type B 1 2,500,000
Seram Maintenance Genset Type B 1 2,500,000
Seram Maintenance Genset Type C 11 950,000
Seram Maintenance Genset Type C 10 950,000
Seram Maintenance Genset Type C 10 950,000
Seram Maintenance Genset Type D 15 1,000,000
Seram Maintenance Genset Type D 13 1,000,000
Seram Maintenance Genset Type D 12 1,000,000
Seram Maintenance Site Type A 4 800,000
Seram Maintenance Site Type A 5 800,000
Seram Maintenance Site Type A 5 800,000
Seram Maintenance Site Type C 13 350,000
Seram Maintenance Site Type C 26 350,000
Seram Maintenance Site Type C 14 350,000
Seram Maintenance Site Type D 9 780,000
Seram Maintenance Site Type D 18 780,000
Seram Maintenance Site Type D 9 780,000
Seram Maintenance Site Type E 1 435,000
Seram Mobil operasional tim 3 5,500,000
Seram Mobil operasional tim 3 5,500,000
Seram Mobil operasional tim 3 5,500,000
Seram Pemberdayaan Warga 1 12,200,000
Seram Pemberdayaan Warga 1 12,200,000
Seram Pemberdayaan Warga 1 12,200,000
Seram Fee Pengamanan site 24 101,000
Seram Fee Pengamanan site 24 101,000
Seram Fee Pengamanan site 24 101,000
Seram SCD Fix Type C 5 23,330,000
Seram SCD Fix Type C 5 23,330,000
Seram SCD Fix Type C 5 23,330,000
Seram Sepeda motor operasional 5 600,000
Seram Sepeda motor operasional 5 600,000
Seram Sepeda motor operasional 5 600,000
Seram SCD Mobile Type B12 1 17,325,000
Seram SCD Mobile Type B12 1 17,325,000
Seram SCD Mobile Type B12 1 17,325,000
Seram SCD Mobile Type B22 8 15,425,000
Seram SCD Mobile Type B22 8 15,425,000
Seram SCD Mobile Type B22 8 15,425,000
Merauke Bantuan Teknis 6 5,500,000
Merauke Bantuan Teknis 6 5,500,000
Merauke Bantuan Teknis 6 5,500,000
Merauke Maintenance Genset Type A 2 4,000,000
Merauke Maintenance Genset Type A 2 4,000,000
Merauke Maintenance Genset Type A 2 4,000,000
Merauke Maintenance Genset Type C 8 1,350,000
Merauke Maintenance Genset Type C 4 1,350,000
Merauke Maintenance Genset Type C 4 1,350,000
Merauke Maintenance Site Type A 4 1,482,000
Merauke Maintenance Site Type A 5 1,482,000
Merauke Maintenance Site Type A 2 1,482,000
Merauke Maintenance Site Type B 1 1,348,916
Merauke Maintenance Site Type C 17 555,000
Merauke Maintenance Site Type C 23 555,000
Merauke Maintenance Site Type C 26 555,000
Merauke Maintenance Site Type D 1 1,170,000
Merauke Maintenance Site Type D 4 1,170,000
Merauke Maintenance Site Type D 4 1,170,000
Merauke Maintenance Site Type E 1 655,000
Merauke Maintenance Site Type E 3 655,000
Merauke Mobil operasional tim 1 7,500,000
Merauke Mobil operasional tim 1 7,500,000
Merauke Mobil operasional tim 1 7,500,000
Merauke Pemberdayaan Warga 1 7,500,000
Merauke Pemberdayaan Warga 1 7,500,000
Merauke Pemberdayaan Warga 1 7,500,000
Merauke Fee Pengamanan site 15 143,000
Merauke Fee Pengamanan site 15 143,000
Merauke Fee Pengamanan site 15 143,000
Merauke SCD Fix Type C 1 33,919,000
Merauke SCD Fix Type C 1 33,919,000
Merauke SCD Fix Type C 1 33,919,000
Merauke SCD Fix Type D 5 45,259,265
Merauke SCD Fix Type D 5 45,259,265
Merauke SCD Fix Type D 5 45,259,265
Merauke Sepeda motor operasional 1 750,000
Merauke Sepeda motor operasional 1 750,000
Merauke Sepeda motor operasional 1 750,000
Merauke SCD Mobile Type B21 1 14,980,000
Merauke SCD Mobile Type B21 1 14,980,000
Merauke SCD Mobile Type B21 1 14,980,000
Merauke SCD Mobile Type B22 5 21,769,000
Merauke SCD Mobile Type B22 5 21,769,000
Merauke SCD Mobile Type B22 5 21,769,000
Merauke Maintenance Site Type E 1 655,000
Tarakan Maintenance Site Type A 1 1,000,000
Tarakan Maintenance Site Type C 13 450,000
Tarakan Maintenance Site Type D 6 650,000
Tarakan Maintenance Genset Type C 7 760,000
Tarakan Maintenance Genset Type D 1 800,000
Tarakan SCD Fix Type C 3 22,000,000
Tarakan Fee Pemberdayaan Warga 27 30,000
Tarakan Security site 10 4,200,000
Tarakan SCD Mobile B22 9 13,000,000
Tarakan Pemberdayaan Warga 1 9,100,000
Tarakan Bantuan Teknis -Orang 9 4,900,000
Tarakan Motor Bantek 9 500,000
Tarakan Maintenance Site Type A 3 1,000,000
Tarakan Maintenance Site Type C 12 450,000
Tarakan Maintenance Site Type D 3 650,000
Tarakan Maintenance Site Type E 3 499,000
Tarakan Maintenance Genset Type C 10 760,000
Tarakan Maintenance Genset Type D 1 800,000
Tarakan SCD Fix Type C 3 22,000,000
Tarakan Fee Pemberdayaan Warga 27 30,000
Tarakan Security site 10 4,200,000
Tarakan SCD Mobile B22 9 13,000,000
Tarakan Pemberdayaan Warga 1 9,100,000
Tarakan Bantuan Teknis -Orang 9 4,900,000
Tarakan Motor Bantek 9 500,000
Tarakan Maintenance Site Type A 1 1,000,000
Tarakan Maintenance Site Type C 14 450,000
Tarakan Maintenance Site Type D 4 650,000
Tarakan Maintenance Genset Type C 6 760,000
Tarakan Maintenance Genset Type D 1 800,000
Tarakan SCD Fix Type C 3 22,000,000
Tarakan Fee Pemberdayaan Warga 27 30,000
Tarakan Security site 10 4,200,000
Tarakan SCD Mobile B22 9 13,000,000
Tarakan Pemberdayaan Warga 1 9,100,000
Tarakan Bantuan Teknis -Orang 9 4,900,000
Tarakan Motor Bantek 9 500,000
Bontang Maintenance Site Type A 2 860,000
Bontang Maintenance Site Type C 10 350,000
Bontang Maintenance Site Type D 2 505,000
Bontang Maintenance Genset Type A 5 2,500,000
Bontang Maintenance Genset Type C 5 800,000
Bontang Fee Pemberdayaan Warga 20 25,000
Bontang SCD Mobile B12 1 18,000,000
Bontang SCD Mobile B22 5 14,250,000
Bontang Pemberdayaan Warga 1 10,150,000
Bontang Bantuan Teknis -Orang 5 4,800,000
Bontang Motor Bantek 5 550,000
Bontang Maintenance Site Type A 1 860,000
Bontang Maintenance Site Type C 14 350,000
Bontang Maintenance Genset Type A 5 2,500,000
Bontang Maintenance Genset Type C 5 800,000
Bontang Fee Pemberdayaan Warga 20 25,000
Bontang SCD Mobile B12 1 18,000,000
Bontang SCD Mobile B22 5 14,250,000
Bontang Pemberdayaan Warga 1 10,150,000
Bontang Bantuan Teknis -Orang 5 4,800,000
Bontang Motor Bantek 5 550,000
Bontang Maintenance Site Type C 12 350,000
Bontang Maintenance Site Type E 3 400,000
Bontang Maintenance Genset Type A 5 2,500,000
Bontang Maintenance Genset Type C 5 800,000
Bontang Fee Pemberdayaan Warga 20 25,000
Bontang SCD Mobile B12 1 18,000,000
Bontang SCD Mobile B22 5 14,250,000
Bontang Pemberdayaan Warga 1 10,150,000
Bontang Bantuan Teknis -Orang 5 4,800,000
Bontang Motor Bantek 5 550,000
Ponti Kota Maintenance Site Type A 2 750,000
Ponti Kota Maintenance Site Type C 22 300,000
Ponti Kota Maintenance Site Type E 6 350,000
Ponti Kota Maintenance Genset Type C 15 700,000
Ponti Kota Fee Pemberdayaan Warga 4 25,000
Ponti Kota Tenaga Security 4 3,200,000
Ponti Kota Pemberdayaan Warga 1 1,250,000
Ponti Kota Bantuan Teknis -Orang 13 3,900,000
Ponti Kota Motor Bantek 13 500,000
Ponti Kota SCD Mobile B22 5 13,700,000
Ponti Kota Maintenance Site Type A 2 750,000
Ponti Kota Maintenance Site Type C 24 300,000
Ponti Kota Maintenance Site Type E 2 350,000
Ponti Kota Maintenance Genset Type C 18 700,000
Ponti Kota Fee Pemberdayaan Warga 4 25,000
Ponti Kota Tenaga Security 4 3,200,000
Ponti Kota Pemberdayaan Warga 1 1,250,000
Ponti Kota Bantuan Teknis -Orang 13 3,900,000
Ponti Kota Motor Bantek 13 500,000
Ponti Kota SCD Mobile B22 5 13,700,000
Ponti Kota Maintenance Site Type A 6 750,000
Ponti Kota Maintenance Site Type C 19 300,000
Ponti Kota Maintenance Site Type E 2 350,000
Ponti Kota Maintenance Genset Type C 19 700,000
Ponti Kota Fee Pemberdayaan Warga 4 25,000
Ponti Kota Tenaga Security 4 3,200,000
Ponti Kota Pemberdayaan Warga 1 1,250,000
Ponti Kota Bantuan Teknis -Orang 13 3,900,000
Ponti Kota Motor Bantek 13 500,000
Ponti Kota SCD Mobile B22 5 13,700,000
Sanggau Maintenance Site Type C 8 350,000
Sanggau Maintenance Site Type D 4 500,000
Sanggau Maintenance Genset Type A 1 2,300,000
Sanggau Maintenance Genset Type C 5 700,000
Sanggau SCD Fix Type D 2 30,000,000
Sanggau Fee Pemberdayaan Warga 13 25,000
Sanggau Tenaga Security 4 3,000,000
Sanggau Pemberdayaan Warga 1 4,050,000
Sanggau Bantuan Teknis -Orang 6 3,800,000
Sanggau Motor Bantek 6 500,000
Sanggau SCD Mobile B12 2 19,500,000
Sanggau SCD Mobile B22 4 12,375,000
Sanggau Maintenance Site Type C 11 350,000
Sanggau Maintenance Genset Type A 1 2,300,000
Sanggau Maintenance Genset Type C 11 700,000
Sanggau SCD Fix Type D 2 30,000,000
Sanggau Fee Pemberdayaan Warga 13 25,000
Sanggau Tenaga Security 4 3,000,000
Sanggau Pemberdayaan Warga 1 4,050,000
Sanggau Bantuan Teknis -Orang 6 3,800,000
Sanggau Motor Bantek 6 500,000
Sanggau SCD Mobile B12 2 19,500,000
Sanggau SCD Mobile B22 4 12,375,000
Sanggau Maintenance Site Type C 10 350,000
Sanggau Maintenance Genset Type A 1 2,300,000
Sanggau Maintenance Genset Type C 8 700,000
Sanggau SCD Fix Type D 2 30,000,000
Sanggau Fee Pemberdayaan Warga 13 25,000
Sanggau Tenaga Security 4 3,000,000
Sanggau Pemberdayaan Warga 1 4,050,000
Sanggau Bantuan Teknis -Orang 6 3,800,000
Sanggau Motor Bantek 6 500,000
Sanggau SCD Mobile B12 2 19,500,000
Sanggau SCD Mobile B22 4 12,375,000
Sintang Maintenance Site type A 3 796,500
Sintang Maintenance Site type C 4 290,000
Sintang Maintenance Site type D 3 400,000
Sintang Maintenance Genset type A 5 2,200,000
Sintang Maintenance Genset type C 20 650,000
Sintang SCD Fix Type C 2 21,000,000
Sintang SCD Fix Type D 1 27,000,000
Sintang Fee Pemberdayaan Warga 13 25,000
Sintang Security site 11 3,000,000
Sintang Pemberdayaan Warga 1 3,350,000
Sintang Bantuan Teknis -Orang 6 3,800,000
Sintang Motor Bantek 6 500,000
Sintang SCD Mobile April 7 12,000,000
Sintang Maintenance Site type A 1 796,500
Sintang Maintenance Site type C 7 290,000
Sintang Maintenance Site type D 3 400,000
Sintang Maintenance Genset type A 5 2,200,000
Sintang Maintenance Genset type C 19 650,000
Sintang SCD Fix Type C 2 21,000,000
Sintang SCD Fix Type D 1 27,000,000
Sintang Fee Pemberdayaan Warga 13 25,000
Sintang Security site 11 3,000,000
Sintang Pemberdayaan Warga 1 3,350,000
Sintang Bantuan Teknis -Orang 6 3,800,000
Sintang Motor Bantek 6 500,000
Sintang SCD Mobile April 7 12,000,000
Sintang Maintenance Site type A 2 796,500
Sintang Maintenance Site type C 8 290,000
Sintang Maintenance Genset type A 5 2,200,000
Sintang Maintenance Genset type C 17 650,000
Sintang SCD Fix Type C 2 21,000,000
Sintang SCD Fix Type D 1 27,000,000
Sintang Fee Pemberdayaan Warga 13 25,000
Sintang Security site 11 3,000,000
Sintang Pemberdayaan Warga 1 3,350,000
Sintang Bantuan Teknis -Orang 6 3,800,000
Sintang Motor Bantek 6 500,000
Sintang SCD Mobile April 7 12,000,000
Ponti Kota Jasa + Transport BBM Depo 413 1,400
Ponti Kota Jasa + Transport BBM Non Depo 391 1,700
Ponti Kota BBM Depo 1 9,777,797
Ponti Kota BBM Non Depo 1 9,268,166
Ponti Kota Corrective Genset 1 10,624,150
Ponti Kota Corrective Site 1 13,888,500
Sanggau Jasa + Transport BBM Depo 265 1,300
Sanggau Jasa + Transport BBM Non Depo 1689 2,800
Sanggau BBM Depo 1 6,278,412
Sanggau BBM Non Depo 1 40,035,634
Sanggau Corrective Genset 1 18,361,600
Sanggau Corrective Site 1 12,241,000
Integrasi Power SAA215 Instalasi Material Integrasi
Bontang Power SAA215 1 64,000,000
Sintang Jasa + Transport BBM Depo 3801 1,300
Sintang Jasa + Transport BBM Non Depo 13624 2,800
Sintang BBM Depo 1 90,097,954
Sintang BBM Non Depo 1 322,939,890
Sintang Corrective Genset 1 10,707,000
Sintang Corrective Site 1 30,856,750
Tarakan Jasa + Transport BBM Depo 478 2,500
Tarakan Jasa + Transport BBM Non Depo 341 3,600
Tarakan BBM Depo 1 11,333,830
Tarakan BBM Non Depo 1 8,085,349
Tarakan Corrective Genset 1 3,873,200
Tarakan Corrective Site 1 27,527,500
NBS BBM Depo & Non Depo 1 23,921,304
NBS Transportasi BBM Non Depo 982 8,350
NBS Transportasi BBM Depo 22 3,000
NBS Corrective Genset 1 11,630,000
NBS Corrective Site 1 5,890,000
Malteng BBM 1 1,940,319
Malteng Transportasi BBM Non Depo 79 8,150
Malteng Corrective Genset 1 4,207,500
Malteng Corrective Site 1 11,974,375
Seram BBM 1 85,766,850
Seram Transportasi BBM Non Depo 3510 6,200
Seram Corrective Genset 1 18,460,000
Seram Corrective Site 1 17,321,313
Merauke BBM 1 18,484,644
Merauke Transportasi BBM Non Depo 753 12,212
Merauke Corrective Genset 1 8,612,500
Merauke Corrective Site 1 27,260,189
Toli BBM Depo 1 77,961,670
Toli Jasa + transport Depo 3265 1,200
Toli BBM Non Depo 1 7,999,130
Toli Jasa + transport Non Depo 335 1,850
Toli Corrective Genset 1 13,305,000
Toli Corrective Site 1 4,720,500
Bontang Rental SCD Fix Non BBM 1 9,735,333
Bontang Rental SCD Fix Non BBM 1 9,735,333
Bontang Rental SCD Fix Non BBM 1 9,735,333
Toli PHBTR PL-250-2-LBS
NYY;1X70MM2;0.6/1KV;Opsti 1 3,440,000
Toli g 40 90,000
Toli AAAC-S;70MM2; (Jumper) 18 28,500
Toli CompressionConnector TypeG 50-70mm2 3 59,000
Toli Breket UNP
Rangka Besi 10 Dudukan
Dudukan CO 3
Trafo 1 1,000,000
Toli ph Canto
SchoenAL- 1 3,000,000
Toli CU70mm2(SKAT)TM 9 130,000
Toli Kabel Schoen CU 95 mm2 8 100,000
Toli JoinSleeveBimetalAlcu70-70mm2+heatshrink 8 130,000
Toli Fuse Link (Type H) 2 - 20 A 3 41,000
Toli Bongkar Trafo Distribusi 1 1,000,000
Toli Bongkar PHB TR 2 Jurusan SPLN D3 1 320,000
Bongkar Breket UNP 10
Toli Dudukan CO dan LA 1 50,000
Bongkar Rangka Besi
Toli Dudukan Trafo 3 ph 1 320,000
Toli Mobilisasi Trafo dari Makassar ke Site 1 5,000,000
Mobilisasi TrafoBekas dari
Toli Site->MKs 1 5,000,000
Toli Jasa Penggantian Trafo 1 5,000,000
Bontang Jasa + transport BBM Depo 4476 1,800
Bontang Jasa + transport BBM Non Depo 5700 2,600
Bontang BBM Depo 1 106,106,400
Bontang BBM Non Depo 1 135,113,271
Bontang Corrective Genset 1 11,769,000
Bontang Corrective Site 1 10,936,400
Toli BBM Depo 1 59,120,615
Toli Fee BBM Depo 2539 1,200
Toli BBM Non Depo 1 4,121,445
Toli Fee BBM Non Depo 177 1,850
Toli Cor Power 1 6,410,070
Toli Cor Site 1 6,070,000
NBS BBM 1 12,175,086
NBS Fee BBM Non Depo 494 8,350
NBS Fee BBM Depo 17 3,000
NBS Corrective Power 1 25,505,330
NBS Corrective Non Power 1 13,107,774
Malteng BBM 1 5,501,664
Malteng Fee BBM Non Depo 224 8,150
Malteng Corrective Power 1 29,100,000
Malteng Corrective Non Power 1 8,679,375
Merauke BBM 1 16,722,450
Merauke Fee BBM Non Depo 675 12,212
Merauke Corrective Power 1 3,253,696
Merauke Corrective Non Power 1 34,539,538
Seram BBM 1 60,720,975
Seram Fee BBM Non Depo 2485 6,200
Seram Corrective Power 1 25,490,000
Seram Corrective Non Power 1 34,916,551
Sanggau Fee BBM Depo 208 1,300
Sanggau Fee BBM Non Depo 1863 2,800
Sanggau Corr Site 1 15,327,800
Sanggau Corr Genset 1 10,526,750
Sanggau BBM Depo 1 4,809,480
Sanggau BBM Non Depo 1 43,058,588
Tarakan Fee BBM Depo 670 2,500
Tarakan Fee BBM Non Depo 526 3,600
Tarakan Corr Site 1 27,099,000
Tarakan BBM Depo 1 15,496,585
Tarakan BBM Non Depo 1 12,146,543
Bontang Fee BBM Depo 4516 1,800
Bontang Fee BBM Non Depo 5116 2,600
Bontang Corr Site 1 6,975,000
Bontang Corr Genset 1 8,948,430
Bontang BBM Depo 1 104,370,850
Bontang BBM Non Depo 1 118,252,448
Sintang Fee BBM Depo 3891 1,300
Sintang Fee BBM Non Depo 12103 2,800
Sintang Corr Site 1 27,155,600
Sintang Corr Genset 1 19,681,500
Sintang BBM Depo 1 89,930,738
Sintang BBM Non Depo 1 279,719,031
Bontang Rental SCD Fix Non BBM 2 9,735,333
Bontang Rental SCD Fix Non BBM 2 9,735,333
Ponti Kota Fee BBM Depo 594 1,400
Ponti Kota Fee BBM Non Depo 380 1,700
Ponti Kota Corr Site 1 16,649,050
Ponti Kota Corr Genset 1 6,334,500
Ponti Kota BBM Depo 1 13,728,825
Ponti Kota BBM Non Depo 1 8,782,750
Toli Jasa Relokasi Unit Perangkat 1 1,000,000
Toli Instalasi 1 12,000,000
Toli Instalasi 1 6,300,000
Toli Instalasi 1 6,500,000
Toli Instalasi 1 2,500,000
Toli Instalasi 1 1,000,000
Toli Instalasi 1 800,000
Toli Instalasi 1 4,200,000
Jasa Mobilisasi/Demobilisasi
Toli CombatFUN 1 1,000,000
Toli PSB PLN 7700 1 12,000,000
Toli Jasa Instal CombatFUN 3band, Radio IP 1 6,300,000
Pembuatan dan pemasangan
Toli Pole Combat 1 6,500,000
Toli Pembuatan Pondasi Combat 1 2,500,000
Toli Jasa Pengurusan Site Combat 1 1,000,000
Toli Pengadaan KWH Box 1 800,000
Toli Pengadaan tiang KWH Box 1 4,200,000
Jasa Mobilisasi/Demobilisasi
Toli CombatFUN 1 1,000,000
Toli PSB PLN 7700 1 12,000,000
Toli Jasa Instal CombatFUN 3band, Radio IP 1 6,300,000
Pembuatan dan pemasangan
Toli Pole Combat 1 6,500,000
Toli Pembuatan Pondasi Combat 1 2,500,000
Toli Jasa Pengurusan Site Combat 1 1,000,000
Toli Pengadaan KWH Box 1 800,000
Toli Pengadaan tiang KWH Box 1 4,200,000
Seram Jasa bongkar Pasang Rumah Genset 1 5,000,000
Seram Pembuatan base Frame rumah genset (4x3) 1 8,000,000
Seram Jasa Mobilisasi/Relokasi Genset 10 - 50 1 6,250,000
Seram Jasa Transportasi Tim corrective on site 1 2,850,000
Seram Jasa Pemindahan rumah genset MSH074 1 1,500,000
Seram Pemasangan Atap 4 7,375,000
Seram Transportasi tim + matrial Instalasi atap 4 1,555,000
Seram Jasa instalasi 4 1,250,000
24,011,318,134
Total PO

46,000,000

43,000,000

5,423,762

2,029,822
7,300,000
2,300,000
7,000,000
39,000,000
49,500,000
90,000,000
3,600,000
3,850,000
1,500,000
325,000
12,000,000
900,000
2,800,000
1,000,000
2,300,000
5,600,000
90,000,000
325,000
12,000,000
39,000,000
49,500,000
2,300,000
4,900,000
39,000,000
49,500,000
90,000,000
1,750,000
3,000,000
325,000
12,000,000
9,800,000
95,900,000
6,000,000
7,200,000
425,000
2,450,000
100,000
12,800,000
2,250,000
7,200,000
425,000
13,300,000
100,000
12,800,000
95,900,000
12,600,000
95,900,000
1,500,000
6,900,000
1,275,000
100,000
12,800,000
12,500,000
4,000,000
18,000,000
71,250,000
5,160,000
501,450
4,550,000
1,515,000
400,000
500,000
5,950,000
800,000
12,500,000
4,000,000
500,000
18,000,000
71,250,000
860,000
4,200,000
400,000
500,000
12,500,000
4,000,000
18,000,000
71,250,000
11,000,000
13,000,000
84,000,000
42,000,000
27,000,000
796,500
4,640,000
1,200,000
325,000
33,000,000
1,593,000
1,450,000
11,000,000
13,000,000
42,000,000
27,000,000
325,000
33,000,000
84,000,000
11,000,000
13,000,000
84,000,000
42,000,000
27,000,000
1,593,000
2,320,000
800,000
325,000
33,000,000
6,080,000
800,000
130,000,000
66,000,000
7,000,000
4,950,000
2,600,000
1,497,000
810,000
40,996,200
2,000,000
5,850,000
2,600,000
6,840,000
800,000
66,000,000
810,000
40,996,200
130,000,000
7,600,000
800,000
130,000,000
66,000,000
1,000,000
7,200,000
810,000
40,996,200
2,000,000
8,140,000
1,580,000
3,480,000
7,280,000
22,400,000
31,600,000
25,266,900
28,200,000
18,000,000
4,500,000
3,349,200
808,000
4,000,000
4,810,000
2,370,000
870,000
7,280,000
22,400,000
31,600,000
25,266,900
28,200,000
18,000,000
4,500,000
3,349,200
808,000
2,000,000
7,030,000
2,370,000
870,000
7,280,000
22,400,000
31,600,000
25,266,900
28,200,000
18,000,000
4,500,000
3,349,200
808,000
4,000,000
10,500,000
10,920,000
435,000
2,500,000
10,450,000
17,000,000
17,325,000
123,400,000
116,500,000
23,500,000
16,500,000
3,000,000
12,200,000
2,424,000
3,200,000
4,550,000
7,020,000
2,500,000
9,500,000
12,000,000
17,325,000
123,400,000
116,500,000
23,500,000
16,500,000
3,000,000
12,200,000
2,424,000
4,800,000
8,750,000
12,480,000
435,000
2,500,000
9,500,000
13,000,000
17,325,000
123,400,000
116,500,000
23,500,000
16,500,000
3,000,000
12,200,000
2,424,000
8,500,000
7,030,000
2,370,000
650,000
9,200,000
93,300,000
69,750,000
95,250,000
32,900,000
30,000,000
3,750,000
14,000,000
1,313,000
8,500,000
4,440,000
1,580,000
650,000
8,050,000
93,300,000
69,750,000
95,250,000
32,900,000
30,000,000
3,750,000
14,000,000
1,313,000
8,500,000
3,700,000
2,370,000
650,000
8,050,000
93,300,000
69,750,000
95,250,000
32,900,000
30,000,000
3,750,000
14,000,000
1,313,000
11,856,000
6,660,000
655,000
8,000,000
10,800,000
14,980,000
108,845,000
33,919,000
226,296,325
33,000,000
7,500,000
750,000
7,500,000
2,145,000
7,410,000
7,215,000
4,680,000
8,000,000
5,400,000
14,980,000
108,845,000
33,919,000
226,296,325
33,000,000
7,500,000
750,000
7,500,000
2,145,000
2,964,000
9,990,000
3,510,000
1,310,000
8,000,000
5,400,000
14,980,000
108,845,000
33,919,000
226,296,325
33,000,000
7,500,000
750,000
7,500,000
2,145,000
33,750,000
2,400,000
16,100,000
30,312,000
122,400,000
12,500,000
900,000
308,000
38,000,000
13,600,000
12,500,000
9,900,000
4,400,000
530,000
33,750,000
2,400,000
23,100,000
40,416,000
136,000,000
12,500,000
900,000
308,000
38,000,000
13,600,000
9,900,000
3,400,000
1,060,000
33,750,000
2,400,000
14,000,000
40,416,000
136,000,000
12,500,000
900,000
308,000
38,000,000
13,600,000
9,900,000
3,200,000
1,590,000
50,597,280
2,361,600
31,391,910
2,258,850
32,635,950
1,100,000
50,700,000
6,500,000
50,700,000
6,500,000
50,700,000
6,500,000
22,800,000
3,000,000
22,800,000
3,000,000
22,800,000
3,000,000
22,800,000
3,000,000
22,800,000
3,000,000
22,800,000
3,000,000
44,100,000
4,500,000
44,100,000
4,500,000
44,100,000
4,500,000
24,000,000
2,750,000
24,000,000
2,750,000
24,000,000
2,750,000
10,150,000
10,150,000
10,150,000
1,250,000
1,250,000
1,250,000
3,350,000
3,350,000
3,350,000
4,050,000
4,050,000
4,050,000
12,231,330
3,991,300
96,000
2,337,000
7,702,344
19,162,417
6,511,850
16,032,500
20,430,532
64,754,100
16,740,000
11,702,373
15,674,000
11,871,585
6,044,940
4,050,000
31,939,376
778,400
739,500
14,195,375
11,106,094
13,015,200
12,044,600
8,362,800
12,893,400
118,622,655
126,604,618
1,950,000
9,457,500
4,898,400
40,152,000
96,201,750
366,118,125
23,213,250
28,404,565
538,200
6,652,800
10,569,938
60,662,250
13,270,250
9,973,260
938,362
1,037,124
9,583,027
7,355,298
5,555,000
34,700,500
9,100,000
9,100,000
9,100,000

9,735,333

9,735,333

6,178,500
743,400
1,304,750
13,614,176
19,677,741
12,457,050
15,813,500

9,784,500
20,661,000
13,461,646
4,383,750
87,000
7,231,188
8,087,388
6,494,176
2,184,200
14,675,500
12,320,000
47,731,501
12,269,800
29,523,209
21,650,000
23,314,230
11,760,156
7,388,688
214,500
5,056,800
4,230,394
46,303,583
13,892,000
5,822,500
6,701,400
8,827,000
95,461,912
87,048,299
3,657,550
6,664,000
4,793,100
38,626,000
94,530,071
353,686,556
24,463,400
23,191,630
73,271,484
3,405,600
7,977,762
571,650
9,999,025
2,750,000

19,470,666

19,470,666
6,970,749
2,055,787
1,461,780
21,083,129
10,410,614
2,136,000
20,400,200
7,500,000
4,500,000
6,000,000

1,190,250

1,190,250

4,513,032
5,550,000

4,500,000
271,375

3,000,000
15,000,000
750,000

5,550,000

4,500,000

3,570,750
13,539,096
9,480,330
42,750
271,375

450,000

4,500,000

7,200,000
700,000

1,350,000

2,850,000
39,324,800
1,920,000
8,258,208
621,600
30,496,400
18,865,000
1,000,000

1,250,000

6,500,000
5,775,000
2,250,000
5,400,000

3,750,000
1,000,000
1,650,000
12,000,000
410,000
33,750,000
2,400,000
16,800,000
40,416,000
136,000,000
12,500,000
900,000
308,000
38,000,000
13,600,000
10,450,000
3,600,000
3,710,000
33,750,000
2,400,000
16,800,000
40,416,000
136,000,000
12,500,000
900,000
308,000
38,000,000
13,600,000
11,000,000
3,400,000
3,710,000
33,750,000
2,400,000
16,100,000
40,416,000
136,000,000
12,500,000
900,000
308,000
38,000,000
13,600,000
11,550,000
4,800,000
2,650,000
500,000
60,313,448
15,431,800
27,954,270
15,950,000
5,326,737
1,784,850
6,145,000
14,731,750
15,920,424
8,023,284
66,877,740
16,772,500
21,316,860
7,005,650
1,050,000
20,545,244
14,750,000
12,000,000
14,750,000
1,190,250
1,190,250
4,513,032
5,550,000
4,500,000
2,499,525
4,106,363
500,000
271,375
2,500,000
15,000,000
3,000,000
3,000,000
750,000
16,198,624
10,680,242
1,660,000
1,576,800
23,187,500
12,213,451
10,139,239
701,400
707,200
11,034,300
7,754,000
3,001,508
43,485,255
159,900
4,989,600
16,695,000
12,054,260
104,621,814
152,692,543
7,716,600
16,268,200
10,240,500
10,300,000
95,828,618
318,281,808
5,105,100
36,520,400
10,043,600
23,611,500
28,200,000
28,200,000
28,200,000
7,280,000
7,280,000
7,280,000
4,000,000
2,000,000
4,000,000
5,550,000
7,400,000
7,030,000
1,580,000
1,580,000
1,580,000
435,000
435,000
435,000
18,000,000
18,000,000
18,000,000
3,349,200
3,349,200
3,349,200
808,000
808,000
808,000
25,266,900
25,266,900
25,266,900
4,500,000
4,500,000
4,500,000
22,400,000
22,400,000
22,400,000
31,600,000
31,600,000
31,600,000
32,900,000
32,900,000
32,900,000
8,050,000
8,050,000
9,200,000
8,500,000
8,500,000
8,500,000
5,180,000
7,770,000
7,030,000
2,370,000
3,160,000
1,580,000
650,000
30,000,000
30,000,000
30,000,000
14,000,000
14,000,000
14,000,000
1,313,000
1,313,000
1,313,000
69,750,000
69,750,000
69,750,000
95,250,000
95,250,000
95,250,000
3,750,000
3,750,000
3,750,000
93,300,000
93,300,000
93,300,000
23,500,000
23,500,000
23,500,000
2,500,000
2,500,000
2,500,000
10,450,000
9,500,000
9,500,000
15,000,000
13,000,000
12,000,000
3,200,000
4,000,000
4,000,000
4,550,000
9,100,000
4,900,000
7,020,000
14,040,000
7,020,000
435,000
16,500,000
16,500,000
16,500,000
12,200,000
12,200,000
12,200,000
2,424,000
2,424,000
2,424,000
116,650,000
116,650,000
116,650,000
3,000,000
3,000,000
3,000,000
17,325,000
17,325,000
17,325,000
123,400,000
123,400,000
123,400,000
33,000,000
33,000,000
33,000,000
8,000,000 400,000
8,000,000
8,000,000
10,800,000 540,000
5,400,000
5,400,000
5,928,000 296,400
7,410,000
2,964,000
1,348,916
9,435,000 471,750
12,765,000
14,430,000
1,170,000 58,500
4,680,000
4,680,000
655,000 32,750
1,965,000
7,500,000
7,500,000
7,500,000
7,500,000
7,500,000
7,500,000
2,145,000
2,145,000
2,145,000
33,919,000 1,695,950
33,919,000
33,919,000
226,296,325 11,314,816
226,296,325
226,296,325
750,000
750,000
750,000
14,980,000 749,000
14,980,000 11,314,816
14,980,000
108,845,000 5,442,250
108,845,000
108,845,000
655,000
1,000,000
5,850,000
3,900,000
5,320,000
800,000
66,000,000
810,000
40,996,200
117,000,000
9,100,000
44,100,000
4,500,000
3,000,000
5,400,000
1,950,000
1,497,000
7,600,000
800,000
66,000,000
810,000
40,996,200
117,000,000
9,100,000
44,100,000
4,500,000
1,000,000
6,300,000
2,600,000
4,560,000
800,000
66,000,000
810,000
40,996,200
117,000,000
9,100,000
44,100,000
4,500,000
1,720,000
3,500,000
1,010,000
12,500,000
4,000,000
500,000
18,000,000
71,250,000
10,150,000
24,000,000
2,750,000
860,000
4,900,000
12,500,000
4,000,000
500,000
18,000,000
71,250,000
10,150,000
24,000,000
2,750,000
4,200,000
1,200,000
12,500,000
4,000,000
500,000
18,000,000
71,250,000
10,150,000
24,000,000
2,750,000
1,500,000
6,600,000
2,100,000
10,500,000
100,000
12,800,000
1,250,000
50,700,000
6,500,000
68,500,000
1,500,000
7,200,000
700,000
12,600,000
100,000
12,800,000
1,250,000
50,700,000
6,500,000
68,500,000
4,500,000
5,700,000
700,000
13,300,000
100,000
12,800,000
1,250,000
50,700,000
6,500,000
68,500,000
2,800,000
2,000,000
2,300,000
3,500,000
60,000,000
325,000
12,000,000
4,050,000
22,800,000
3,000,000
39,000,000
49,500,000
3,850,000
2,300,000
7,700,000
60,000,000
325,000
12,000,000
4,050,000
22,800,000
3,000,000
39,000,000
49,500,000
3,500,000
2,300,000
5,600,000
60,000,000
325,000
12,000,000
4,050,000
22,800,000
3,000,000
39,000,000
49,500,000
2,389,500
1,160,000
1,200,000
11,000,000
13,000,000
42,000,000
27,000,000
325,000
33,000,000
3,350,000
22,800,000
3,000,000
84,000,000
796,500
2,030,000
1,200,000
11,000,000
12,350,000
42,000,000
27,000,000
325,000
33,000,000
3,350,000
22,800,000
3,000,000
84,000,000
1,593,000
2,320,000
11,000,000
11,050,000
42,000,000
27,000,000
325,000
33,000,000
3,350,000
22,800,000
3,000,000
84,000,000
578,200
664,700
9,777,797
9,268,166
10,624,150
13,888,500
344,331
4,729,200
6,278,412
40,035,634
18,361,600 `
12,241,000

64,000,000
4,941,300
38,147,200
90,097,954
322,939,890
10,707,000
30,856,750
1,195,362
1,227,960
11,333,830
8,085,349
3,873,200
27,527,500
23,921,304
8,199,700
66,000
11,630,000
5,890,000
1,940,319
643,850
4,207,500
11,974,375
85,766,850
21,762,000
18,460,000
17,321,313
18,484,644
9,195,636
8,612,500
27,260,189 32,316,233
77,961,670
3,918,000
7,999,130
619,750
13,305,000
4,720,500
9,735,333
9,735,333
9,735,333
3,440,000
3,600,000
513,000
177,000
1,000,000
3,000,000
1,170,000
800,000
1,040,000
123,000
1,000,000
320,000

50,000

320,000
5,000,000

5,000,000
5,000,000
8,056,800
14,820,000
106,106,400
135,113,271
11,769,000
10,936,400
59,120,615
3,046,800
4,121,445
327,450
6,410,070
6,070,000
12,175,086
4,124,900
51,000
25,505,330
13,107,774
5,501,664
1,825,600
29,100,000
8,679,375
16,722,450
8,243,100
3,253,696
34,539,538
60,720,975
15,407,000
25,490,000
34,916,551
270,400
5,216,400
15,327,800
10,526,750
4,809,480
43,058,588
1,675,000
1,893,600
27,099,000
15,496,585
12,146,543
8,128,800
13,301,600
6,975,000
8,948,430
104,370,850
118,252,448
5,058,300
33,888,400
27,155,600
19,681,500
89,930,738
279,719,031
19,470,666
19,470,666
831,600
646,000
16,649,050
6,334,500
13,728,825
8,782,750
1,000,000
12,000,000
6,300,000
6,500,000
2,500,000
1,000,000
800,000
4,200,000

1,000,000
12,000,000
6,300,000

6,500,000
2,500,000
1,000,000
800,000
4,200,000

1,000,000
12,000,000
6,300,000

6,500,000
2,500,000
1,000,000
800,000
4,200,000
5,000,000
8,000,000
6,250,000
2,850,000
1,500,000
29,500,000
6,220,000
5,000,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
DP 35%
RFI 1 15%
RFI 2 25%

ATP BAST 20%


BAST Retention 5%

No PO
1 Pak Ari

No PO
1 6200000773
2 6300000180
3 6300000199
4 6300000198
5 6100000163
6 6100000176
7 6300000180
8 6100000189
9 6100001454
10 6100000163
11 6100000176
12 6100000189

13 6300000237

14 6300000236

15 6300000238
16 6300000180
17 6300000198
18 6300000198
19 6300000180
20 6300000198
21 6300000236
22 6300000198
23 6300000236
24 6100000202
25 6300000198
26 6300000198
27 6100000202
28 6300000198
29 6300000180
30 6200001622
31 Reimburse
32 Reimburse
33 Reimburse
34 Reimburse
35 Reimburse
36 Reimburse
37 Reimburse
38 Reimburse
39 Reimburse
40 Reimburse
41 Reimburse
42 Reimburse
43 6300000198
44 Reimburse
45 Reimburse
46 Reimburse
47 6300000180
48 6300000180
49 6300000198
50 Andi Kurniawan ZTE
51 Reimburse
52 Reimburse
53 Reimburse
54 Reimburse
55 6300000180
56 6300000180
57 6300000180
58 6300000180
59 6300000180
60 6300000180
61 6300000198
62 6300000236
63 Reimburse
64 Reimburse
65 Reimburse
66 Reimburse
67 Reimburse
68 Reimburse
69 Reimburse
70 6300000180
71 6300000180
72 6300000180
73 6300000198
74 6300000198
75 6300000199
76 6300000199
77 6300000180
78 6300000198
79 6300000198
80 6300000198
6300000180
6300000180
6300000180
Projek
IBS

Pekerjaan
Pekerjaan Jasa Instalasi Power Dan VSAT 200 AU
Down Payment 35% Pekerjaan jasa Instalasi Power dan VSAT
Down Payment 35% Instalation Tower Power VSAT CME dan Delivery All Materials BAKTI Project
Down Payment 35% Instalation Tower Power VSAT CME dan Delivery All Materials BAKTI Project
Down Payment 50% VSAT Material C-BAND 10 W
Down Payment 50% VSAT Material C-BAND 10 W Tambahan 30 site
RFI 1 15% Site PAP4106 YUGU MABUR TOLIKARA BIUK
Down Payment 50% VSAT Material C-BAND 10 W Tambahan 8 site
Man Power For Task Force VSAT Project BAKTI (periode Sep-Des )
Pelunasan 50% VSAT Material C-BAND 10 W
Pelunasan 50% VSAT Material C-BAND 10 W tambahan 30 Site
Pelunasan 50% VSAT Material C-BAND 10 W tambahan 8 Set

Down Payment 35% Instalation Tower Power VSAT, CME dan Delivery All Materials BAKTI Project

Down Payment 35% Instalation Tower Power VSAT, CME dan Delivery All Materials BAKTI Project

Down Payment 35% Instalation Tower Power VSAT, CME dan Delivery All Materials BAKTI Project
RFI 1 15% Site PAP3986 TIMER , Site PAP3859 TINGWNERI
RFI 1 15% Site PAP3141 ABUTPUK JAYAWIJAYA USILIMO , PAP3188 YEREGA JAYAWIJAYA SILOKARNODOGA
RFI 1 15% Site PAP3138 FIKHA JAYAWIJAYA USILIMO
RFI 2 25% Site PAP4106 YUGU MABUR TOLIKARA BIUK, PAP3986 TIMER TOLIKARA WAKUWO, PAP3859 TING
RFI 1 15% Site PAP3053 ANEGERA JAYAWIJAYA MUSATFAK
RFI 1 15% Site PAP3015 IYANTIK JAYAPURA JAYAWIJAYA KURULU
RFI 1 15% Site PAP4935 SIAPMA JAYAWIJAYA MUSATFAK
RFI 2 25% Site Site PAP3015 IYANTIK JAYAPURA JAYAWIJAYA KURULU
Down Payment 50% Pengadaan Material dan Aksesoris VSAT th 2023
RFI 2 25% Site PAP4935 SIAPMA JAYAWIJAYA MUSATFAK
RFI 1 15 % Site PAP3193 PIRAMID JAYAWIJAYA PIRAMID
Pelunasan 50% Pengadaan Material dan Aksesoris VSAT th 2023
RFI 2 25 % PAP3185 WOGI JAYAWIJAYA SILOKARNODOGA, PAP3141 ABUTPUK JAYAWIJAYA USILIMO
RFI 1 15 % PAP3783 YIBALO TOLIKARA BEWANI,PAP3777 BILUBAGA TOLIKARA BEWANI
Man Power For Task Force VSAT Project BAKTI (periode 15 Des 2022 - 15 Mar 2023)
Pembayaran langsir material site Kubugiwa PAP3753
Pembayaran biaya langsir material,perataan tanah site Timer PAP3986
Pembayaran biaya langsir material,penggantian pohon buah merah, pembersihan lahan,perataan tanah dan p
Pembayaran biaya langsir material dan buka palang masuk ke site Yugumabur PAP4106
Pembayaran pembersihan lahan,perbaikan jembatan, penggantian tiang PLN,penggantian pohon untuk pembu
Pembayaran perbaikan jembatan,buka palang untuk masuk site,biaya langsir material dan jaga malam site W
Pembayaran hutang mitra sebelumnya,perataan tanah,pembukaan palang masuk site,langsir material dan te
Pembayaran hutang mitra sebelumnya site Windik
Pembayaran langsir material site Fikha PAP3138
Pembayaran langsir material site Abutpuk PAP3141
Pembayaran langsir material site Anegara PAP3053
Pembayaran langsir material 2 KM site Hamukhi PAP4936
ATP 20% PAP4935 SIAPMA JAYAWIJAYA MUSATFAK,PAP3185 WOGI JAYAWIJAYA SILOK
Pembayaran Langsir material tower oleh warga site Minagi PAP3715
Pembayaran ganti rugi perataan tanah yang memakai excavator site Yibalo PAP3783
Pembayaran langsir material site Kubugiwa PAP3710
RFI 1 15% Site 3697 YANDONO TOLIKARA PANAGA
RFI 2 25% Site 3697 YANDONO TOLIKARA PANAGA
RFI 2 25% Site PAP3053 ANEGERA JAYAWIJAYA MUSATFAK
Penggantian Aksesoris BUC 3 Watt
Pembayaran pembongkaran pagar akses masuk site Yugumabur PAP 4106
Pembayaran pembukaan palang masuk site Tingweneri PAP 3859
Pembayaran hutang mitra sebelumnya site Tingweneri PAP 3859
Pembayaran pembersihan lahan,perbaikan jembatan, penggantian tiang PLN,penggantia
ATP 20 % PAP3986 TIMER TOLIKARA WAKUWO, PAP3859 TINGWINERI
RFI 1 15% Site 3715 MINAGI
RFI 2 25% Site 3715 MINAGI
RFI 2 25 % PAP3783 YIBALO TOLIKARA BEWANI ,PAP3777 BILUBAGA TOLIKARA BEWANI
RFI 1 15% Site PAP3886 ALOBAGA TOLIKARA GEYA
ATP 20 % Site PAP4106 YUGU MABUR TOLIKARA BIUK
ATP 20 % Site PAP3053 ANEGERA JAYAWIJAYA MUSATFAK, Site PAP3141 ABUTPUK JAYA
ATP 20 % Site PAP3015 IYANTIK JAYAPURA JAYAWIJAYA KURULU
Reimbursement Pembayaran pembukaan palang, pembukaan akses masuk ke desa, dan pe
Reimbursement Pembangunan Jembatan Site Wogi PAP3185
Reimbursement Pembayaran langsir material lebih dari 1 KM Site Yibalo PAP3783
Reimbursement Pembayaran langsir material lebih dari 1 KM Site Bilubaga PAP377
Reimbursement Pembayaran langsir material lebih dari 1 KM Site Bilubaga PAP377
Reimbursement Pembayaran langsir material site Piramid PAP3193
Reimbursement Pembayaran langsir material site Piramid PAP3193
ATP 20% Site 3715 MINAGI
ATP 20% Site 3697 YANDONO TOLIKARA PANAGA
ATP 20% Site PAP3783 YIBALO TOLIKARA BEWANI
RFI 2 25% PAP 3193 PIRAMID JAYAMIJAYA PIRAMID
RFI 2 25% PAP 3138 FIKHA JAYAWIJAYA USILIMO
RFI 2 25% PAP 3891 JELEPELE TOLIKARA GEYA
RFI 1 15% PAP3891 JELEPELE TOLIKARA GEYA
RFI 2 25% Site PAP3886 ALOBAGA TOLIKARA GEYA
ATP 20% PAP3193 PIRAMID JAYAMIJAYA PIRAMID
ATP 20% PAP3138 FIKHA JAYAWIJAYA USILIMO
RFI 1 15% PAP4936 HAMUKHI JAYAWIJAYA MUSATFAK
RFI 1 15% Site PAP3710 KUBUGIWA TOLIKARA KUBU
ATP 20% Site PAP3886 ALOBAGA TOLIKARA GEYA
ATP 20% PAP3777 BILUBAGA TOLIKARA BEWANI
Kwajiban Mahaga To IBS perhitungan awal 1,366,935,612
PPN yg belom terbayar atas 2 Invoice Material yg sudah paid 9,768,000
Kwajiban Mahaga To IBS final 1,357,167,612.00

Bulan Inv
Januari

Kategori Pekerjaan Jumlah Site Bulan Inv


VSAT POWER Jan-22
CME DP 15 Aug-22
CME DP 2 Sep-22
CME DP 10 Sep-22
VSAT MATERIAL Sep-22
VSAT MATERIAL Oct-22
CME 1 Oct-22
VSAT MATERIAL Oct-22
MAN POWER / IN HOUSE Nov-22
VSAT MATERIAL Nov-22
VSAT MATERIAL Nov-22
VSAT MATERIAL Nov-22

CME DP 4 Nov-22

CME DP 3 Nov-22

CME DP 3 Nov-22
CME 2 Nov-22
CME 3 Dec-22
CME 1 Dec-22
CME 3 Dec-22
CME 1 Dec-22
CME 1 Dec-22
CME 1 Jan-23
CME 1 Feb-23
VSAT MATERIAL Feb-23
CME 1 Feb-23
CME 1 Feb-23
VSAT MATERIAL Mar-23
CME 2 Mar-23
CME 2 Mar-23
MAN POWER / IN HOUSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME 2 Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME REIMBURSE Mar-23
CME 1 Apr-23
CME 1 Apr-23
CME 1 Apr-23

CME REIMBURSE Apr-23


CME REIMBURSE Apr-23
CME REIMBURSE Apr-23
CME REIMBURSE Apr-23
CME 2 Apr-23
CME 1 Apr-23
CME 1 Apr-23
CME 2 Apr-23
CME 1 Apr-23
CME 1 Jun-23
CME 2 Jun-23
CME 1 Jun-23
CME REIMBURSE Jun-23
CME REIMBURSE Jun-23
CME REIMBURSE Jun-23
CME REIMBURSE Jun-23
CME REIMBURSE Jun-23
CME REIMBURSE Jun-23
CME REIMBURSE Jun-23
CME 1 Jun-23
CME 1 Jun-23
CME 1 Jun-23
CME 1 Jun-23
CME 1 Jun-23
CME 1 Jun-23
CME 1 Jun-23
CME 1 Jul-23
CME 1 Jul-23
CME 1 Jul-23
CME 1 Jul-23
CME 1
CME 1
CME 1
-
No Invoice Nilai Actual
00058/MP/0122/0002 -

22,253,000,000
No Invoice TOP Nilai Actual
00058/MP/0122/0001 Invoice 50% 5,500,000,000
00058/MP/0822/0001 DP 35% 1,522,500,000
00058/MP/0922/0001 DP 35% 203,000,000
00058/MP/0922/0002 DP 35% 1,015,000,000
00058/MP/0922/0003 DP 50% 4,000,655,000
00058/MP/1022/0001 DP 50% 902,295,000
00058/MP/1022/0002 RFI 1 (15%) 43,500,000
00058/MP/1022/0003 DP 50% 194,000,000
00058/MP/1122/0001 Invoice 100% 480,000,000
00058/MP/1122/0007 Pelunasan 50 % 4,000,655,000
00058/MP/1122/0006 Pelunasan 50 % 902,295,000
00058/MP/1122/0005 Pelunasan 50 % 194,000,000

00058/MP/1122/0003 DP 35% -

00058/MP/1122/0002 DP 35% -

00058/MP/1122/0004 DP 35% -
00058/MP/1122/0008 RFI 1 (15%) 87,000,000
58/MP/1222/0001 RFI 1 (15%) 130,500,000
58/MP/1222/0002 RFI 1 (15%) 43,500,000
58/MP/1222/0003 RFI 2 (25%) 217,500,000
58/MP/1222/0004 RFI 1 (15%) 43,500,000
58/MP/1222/0005 RFI 1 (15%) 43,500,000
58/MP/0123/0001 RFI 1 (15%) 43,500,000
58/MP/0223/0001 RFI 2 (25%) 72,500,000
58/MP/0223/0002 DP 50% 44,400,000
58/MP/0223/0004 RFI 2 (25%) 72,500,000
58/MP/0223/0003 RFI 1 (15%) 43,500,000
58/MP/0323/0001 Pelunasan 50 % 44,400,000
58/MP/0323/0003 RFI 2 (25%) 145,000,000
58/MP/0323/0002 RFI 1 (15%) 87,000,000
58/MP/0323/0020 RFI 1 (15%) 384,000,000
00058/MP/0323/0004 Invoice 100% 11,500,000
00058/MP/0323/0005 Invoice 100% 6,000,000
00058/MP/0323/0006 Invoice 100% 6,250,000
00058/MP/0323/0007 Invoice 100% 5,150,000
00058/MP/0323/0008 Invoice 100% 8,000,000
00058/MP/0323/0009 Invoice 100% 5,500,000
00058/MP/0323/0010 Invoice 100% 5,750,000
00058/MP/0323/0011 Invoice 100% 10,000,000
00058/MP/0323/0012 Invoice 100% 6,000,000
00058/MP/0323/0013 Invoice 100% 5,000,000
00058/MP/0323/0014 Invoice 100% 2,000,000
00058/MP/0323/0015 Invoice 100% 12,500,000
00058/MP/0323/0016 ATP 20% 116,000,000
00058/MP/0323/0017 Invoice 100% 3,750,000
00058/MP/0323/0018 Invoice 100% 5,000,000
00058/MP/0323/0019 Invoice 100% 5,000,000
58/MP/0423/0002 RFI 1 (15%) 43,500,000
58/MP/0423/0001 RFI 2 (25%) 72,500,000
58/MP/0423/0003 RFI 2 (25%) 72,500,000
00058/MP/0423/0004 -
00058/MP/0423/0005 Invoice 100% 5,000,000
00058/MP/0423/0006 Invoice 100% 2,500,000
00058/MP/0423/0007 Invoice 100% 4,000,000
00058/MP/0423/0008 Invoice 100% 5,000,000
58/MP/0423/0009 ATP 20% 116,000,000
58/MP/0523/0004 RFI 1 (15%) 43,500,000
58/MP/0523/0003 RFI 2 (25%) 72,500,000
58/MP/0523/0002 RFI 2 (25%) 145,000,000
58/MP/0523/0001 RFI 1 (15%) 43,500,000
58/MP/0623/0010 ATP 20% 58,000,000
58/MP/0623/0009 ATP 20% 116,000,000
58/MP/0623/0008 ATP 20% 58,000,000
00058/MP/0623/0001 Invoice 100% 10,000,000
00058/MP/0623/0002 Invoice 100% 10,000,000
00058/MP/0623/0003 Invoice 100% 9,000,000
00058/MP/0623/0004 Invoice 100% 9,000,000
00058/MP/0623/0005 Invoice 100% 10,000,000
00058/MP/0623/0006 Invoice 100% 1,900,000
00058/MP/0623/0007 Invoice 100% 5,000,000
58/MP/0623/0017 ATP 20% 58,000,000
58/MP/0623/0016 ATP 20% 58,000,000
58/MP/0623/0015 ATP 20% 58,000,000
58/MP/0623/0014 RFI 2 (25%) 72,500,000
58/MP/0623/0013 RFI 2 (25%) 72,500,000
58/MP/0623/0012 RFI 2 (25%) 72,500,000
58/MP/0623/0011 RFI 1 (15%) 43,500,000
58/MP/0723/0001 RFI 2 (25%) 72,500,000
58/MP/0723/0002 ATP 20% 58,000,000
58/MP/0723/0002 ATP 20% 58,000,000
58/MP/0723/0003 RFI 1 (15%) 43,500,000
RFI 1 (15%) -
ATP 20% -
ATP 20% -
Tgl Invoice Ket
27-Jan-22

11% 24,567,362,000
VAT Net Amount Tgl Invoice Ket
605,000,000 6,105,000,000 27-Jan-22 Paid
167,475,000 1,689,975,000 4-Aug-22 Paid
22,330,000 225,330,000 6-Sep-22 Paid
111,650,000 1,126,650,000 6-Sep-22 Paid
440,072,050 4,440,727,050 6-Sep-22 Paid
99,252,450 1,001,547,450 3-Oct-22 Paid
4,785,000 48,285,000 20-Oct-22 Paid
21,340,000 215,340,000 24-Oct-22 Paid
52,800,000 532,800,000 15-Nov-22 Paid
440,072,050 4,440,727,050 21-Nov-22 Paid
99,252,450 1,001,547,450 21-Nov-22 Paid
21,340,000 215,340,000 21-Nov-22 Paid

- - 28-Nov-22

- - 28-Nov-22

- - 28-Nov-22
9,570,000 96,570,000 28-Nov-22
14,355,000 144,855,000 12-Dec-22
4,785,000 48,285,000 15-Dec-22
23,925,000 241,425,000 28-Dec-22
4,785,000 48,285,000 29-Dec-22
4,785,000 48,285,000 29-Dec-22
4,785,000 48,285,000 31-Jan-23
7,975,000 80,475,000 21-Feb-23
4,884,000 49,284,000 21-Feb-23 Paid
7,975,000 80,475,000 27-Feb-23
4,785,000 48,285,000 27-Feb-23
4,884,000 49,284,000 1-Mar-23 Paid
15,950,000 160,950,000 6-Mar-23
9,570,000 96,570,000 6-Mar-23
42,240,000 426,240,000 29-Mar-23
28-Mar-23
28-Mar-23
28-Mar-23
28-Mar-23
28-Mar-23
28-Mar-23
28-Mar-23
28-Mar-23
28-Mar-23
28-Mar-23
28-Mar-23
28-Mar-23
12,760,000 128,760,000 28-Mar-23
29-Mar-23
29-Mar-23
29-Mar-23
4,785,000 48,285,000 3-Apr-23
7,975,000 80,475,000 3-Apr-23
7,975,000 80,475,000 3-Apr-23
Paid
4-Apr-23
4-Apr-23
4-Apr-23
4-Apr-23
12,760,000 128,760,000 6-Apr-23
4,785,000 48,285,000 2-May-23
7,975,000 80,475,000 2-May-23
15,950,000 160,950,000 2-May-23
4,785,000 48,285,000 2-May-23
6,380,000 64,380,000 6-Jun-23
12,760,000 128,760,000 6-Jun-23
6,380,000 64,380,000 6-Jun-23
10,000,000 5-Jun-23
10,000,000 5-Jun-23
9,000,000 5-Jun-23
9,000,000 5-Jun-23
9,000,000 5-Jun-23
1,900,000 5-Jun-23
5,000,000 5-Jun-23
6,380,000 64,380,000 26-Jun-23
6,380,000 64,380,000 26-Jun-23
6,380,000 64,380,000 26-Jun-23
7,975,000 80,475,000 26-Jun-23
7,975,000 80,475,000 26-Jun-23
7,975,000 80,475,000 26-Jun-23
4,785,000 48,285,000 26-Jun-23
7,975,000 80,475,000 2-May-23
6,380,000 64,380,000 25-Jul-23
6,380,000 64,380,000 25-Jul-23
4,785,000 48,285,000
- -
- -
- -
Nilai Pembayaran Tanggal Paid
33,320,000

20,909,949,450
Nilai Pembayaran Tanggal Paid
5,940,000,000 17-Feb-22
1,663,331,250 23-Aug-22
221,777,500 19-Sep-22
1,108,887,500 19-Sep-22
4,440,727,500 27-Sep-22
1,001,547,450 30-Nov-22
47,523,750 30-Nov-22
215,340,000 28-Dec-22
524,400,000 10-Jan-23
4,440,727,050 3-Feb-22
1,001,547,450 3-Feb-22
215,340,000 21-Feb-23
minta didrop po req cancel
inv dan fp dimasukkan di rev 2023
minta didrop po req cancel
inv dan fp dimasukkan di rev 2023
minta didrop po req cancel
inv dan fp dimasukkan di rev 2023
dimasukkan di rev 2023

44,400,000 9-Mar-23

44,400,000 9-May-23
0 11-Apr-23

sisa kewajiban Mahaga to IBS 1,357,167,612


sisa kewajiban Mahaga to IBS 1,292,787,612
sisa kewajiban Mahaga to IBS 1,228,407,612
sisa kewajiban Mahaga to IBS 1,164,027,612
sisa kewajiban Mahaga to IBS 1,083,552,612
sisa kewajiban Mahaga to IBS 1,003,077,612
sisa kewajiban Mahaga to IBS 922,602,612
sisa kewajiban Mahaga to IBS 874,317,612
sisa kewajiban Mahaga to IBS 793,842,612
729,462,612
665,082,612

793,842,612
665,082,612
665,082,612
setelah rekon dengan BPC
BAPP
Cluster SCD Fix & SCD Mobile PW MTC site & MTC genset
Biak Serui Nabire Done Done Done
Malteng Done Done Done
Seram Done Done Done
Merauke Done Done Done

BAPP
Cluster SCD Fix & SCD Mobile PW MTC site & MTC genset
Biak Serui Nabire Done Done Done
Malteng Done Done Done
Seram Done Done Done
Merauke Done Done Done

BAPP
Cluster SCD Fix & SCD Mobile PW MTC site & MTC genset
Biak Serui Nabire Done Done Done
Malteng Done Done Done
Seram Done Done Done
Merauke Done Done Done

BAPP
Cluster SCD Fix & SCD Mobile PW MTC site & MTC genset
Biak Serui Nabire Done Done Done
Malteng Done Done Done
Seram Done Done Done
Merauke NY NY NY
Januari 2023
BAPP BAST
BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile PW
Done Done Done Done Done
Done Done Done Done Done
Done Done Done Done Done
Done Done Done Done Done

Februari 2023
BAPP BAST
BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile PW
Done Done Done Done Done
Done Done Done Done Done
Done Done Done Done Done
Done Done Done Done Done

Maret 2023
BAPP BAST
BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile PW
NY NY Done Done Done
NY NY Done Done Done
Done NY Done Done Done
NY NY Done Done Done

Apr-23
BAPP BAST
BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile PW
NY NY Done Done Done
NY NY Done Done Done
NY NY Done Done Done
NY NY NY NY NY
BAST
MTC site & MTC genset BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile
Done Done Done Done Done
Done Done Done Done Done
Done Done Done Done Done
Done Done Done Done Done

BAST
MTC site & MTC genset BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile
Done Done Done Done Done
Done NY Done Done Done
Done Done Done Done Done
Done Done Done Done Done

BAST
MTC site & MTC genset BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile
Done NY NY Done Done
Done NY NY Done Done
Done Done NY Done Done
Done NY NY Done Done

BAST
MTC site & MTC genset BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile
Done NY NY Done NY
Done NY NY Done Done
Done NY NY Done Done
NY NY NY NY NY
Collab ID
PW MTC site & MTC genset BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile
Done Done Done Done Done Done
Done Done Done Done Done Done
Done Done Done Done Done Done
Done Done Done Done Done Done

Collab ID
PW MTC site & MTC genset BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile
Done Done Done Done Done Done
Done Done NY Done Done Done
Done Done Done Done Done Done
Done Done Done Done Done Done

Collab ID
PW MTC site & MTC genset BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile
Done Done NY NY Done Done
Done Done NY NY Done Done
Done Done Done NY Done Done
Done Done NY NY Done Done

Collab ID
PW MTC site & MTC genset BBM Cor Site & Cor Genset ETS SCD Fix & SCD Mobile
NY NY NY NY NY NY
Done Done NY NY Done Done
Done Done NY NY Done Done
NY NY NY NY NY NY
Invoice
PW MTC site & MTC genset BBM Cor Site & Cor Genset ETS
Done Done Done Done Done
Done Done Done Done Done
Done Done Done Done Done
Done Done Done Done Done

Invoice
PW MTC site & MTC genset BBM Cor Site & Cor Genset ETS
Done Done Done Done Done
Done Done NY Done Done
Done Done Done Done Done
Done Done Done Done Done

Invoice
PW MTC site & MTC genset BBM Cor Site & Cor Genset ETS
Done Done NY NY Done
Done Done NY NY Done
Done Done Done NY Done
Done Done NY NY Done

Invoice
PW MTC site & MTC genset BBM Cor Site & Cor Genset ETS
NY NY NY NY NY
Done Done NY NY Done
Done Done NY NY Done
NY NY NY NY NY
Ket - all -

Sum of Nilai Actual TOP


PO Invoice 100% Pelunasan 50 % DP 50% ATP 20% RFI 2 (25%)
6100000163 4,000,655,000 4,000,655,000
6100000176 902,295,000 902,295,000
6100000189 194,000,000 194,000,000
6100000202 44,400,000 44,400,000
6100001454 480,000,000
6200000773
6200001622
6300000180 348,000,000 580,000,000
6300000198 348,000,000 435,000,000
6300000199 72,500,000
6300000236 58,000,000 72,500,000
6300000237
6300000238
Reimburse 168,800,000
Andi Kurniawan ZTE
Total Result 648,800,000 5,141,350,000 5,141,350,000 754,000,000 ###
RFI 1 (15%) DP 35% Invoice 50% Total Result
###
###
###
###
###
5,500,000,000 ###
384,000,000 ###
348,000,000 1,522,500,000 ###
348,000,000 1,015,000,000 ###
43,500,000 203,000,000 ###
43,500,000 - ###
- -
- -
###
-
1,167,000,000 2,740,500,000 5,500,000,000 ###
Pivot Invoice FO

Sum - Data Nilai PO


Projek 1,281,284 1,766,685 2,105,684 2,137,685 6,689,684
BKS
BTS
YOFC
9,173,284 ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### (empty)
Total Result
Bangun Kelola Swadaya
= Bali Towerindo Sentra
DP
PAT
BAST
BA Retensi

NO Kode
1 62

1 62
2 62
2 62
3 62
4 62
5 62
6 62
7 62
8 62
9 62
10 62
11 62
12 62
13 62
14 62
15 62
16 62
17 62
18 62
19 62
20 62
21 62
22 62
23 62
24 62
25 62
26 62
27 62
28 62
29 62
30 62
31 62
32 62
33 62
34 62
35 62
36 62
37 62
38 62
39 62
40 62
41 62
42 62
43 62
44 62
45 62
46 62
47 62
48 62
48 62
49 62
50 62
51 62
52 62
20% (DP Bond min 3 bulan & Performance Bond 6 bulan)
30% (Progress pekerjaan BAST 50 %)
40% (Progress pekerjaan 100%)
10%

Nama Pekerjaan Periode


DP 20% FTTH Kunciran RW 14 2023

PAT 30% FTTH Kunciran RW 14 2023


DP 20% FTTH Kedoya utara RW 06 2023
PAT 30% FTTH
Penarikan FO CUTKedoya
Impact utara RW 06
Pekerjaan 2023
PU Site MP-Kalideres-001
Tole Iskandar Site Abadi Jaya-014 Sesuai TT Number 2023
TTNOC-230111093947915-002
Pembangunan Toll Site Jatibening-017 Sesuai TT Number 2023
TTNOC-221206170355150-001 2023
Pekerjaan Kabel Power Tanah Impact Pembangunan
Pelebaran Jalan Site Marga Jaya-008 Sesuai TT Number Halte Sarinah Site Gondangdia -001 Sesuai 2023
TTNOC-230129200925627-001 2023
DP 20% Penarikan Kabel Udara FTTH-PO Standart-Kebayoran Lama Selatan RW 03 & RW 04-224 HP 2023
DP 20 % Penarikan Kabel Udara FTTH-PO Standart-Kreo RW 07-226 HP 2023
DP 20 % Penarikan Kabel Udara FTTH-PO Standart-Kreo RW 10-308 HP 2023
Reimbursement donasi site kedaung kali angke RW 06 dan site Kedaung kali angke RW 02 2023
DP 40% Rollout New - Kedaung Kaliangke RW 02 2023
DP 40% Rollout New - Kedaung Kaliangke RW 06 2023
DP 40% Rollout New - Griya Gading Pamulang
Pekerjaan Pembongkaran JPO Sarinah Site Gondangdia- Tangerang Selatan 2023
001 Sesuai TT Number TTNOC-230221101001769-001
Accessories Site Jovis SF Batch 7 Site MP-Semper Timur- 2023
001 Sesuai TT Number TTNOC-230215080007921-001
Pembangunan Tower Sutet Sitet MP-Semper Timur-001 2023
Sesuai TT Number TTNOC-230125140007453-00 2023
DP 40 % Roll Out New - Subfeeder Griya Gading Pamulang - Tangerang 2023
DP 40 % Roll Out New - Subfeeder Kedaung Kaliangke RW2 - Jakarta Barat 2023
DP 40 % Roll Out New - Subfeeder
317_CM_FTTH_TTNOC-230220160008492-001_FO Kedaung Kaliangke RW6 - Jakarta Barat 2023
CUT_Kapuk-001 2023
PAT 30% Penarikan Kabel Udara FTTH-PO Standart-Kebayoran Lama Selatan RW 03 & RW 04-224 H 2023
Biaya
Hj Pekerjaan
Bokir Bin Dji?UnRestorasi Galian
- Jl. Pinang PLNdengan
Ranti ImpactVendor
Source PT.
Power PLN Site Kalibaru-012 Sesuai TT Num 2023
Mahaga Pratama - SPK No 009/BTS/PS/SPK-FO/II/2023 2023
Pekerjaan Perbaikan Tiang FO Compain
Truck Site Margahayu-015 Sesuai TT Number TTNOC-Sudin Jakarta Site MP -Semper Timur-004 Sesuai TT Number 230324192231
230327150256493-001
Miring FO Site MP-Duren Sawit-001 Sesuai TT Number 2023
TTNOC-230316104509428-002
Site Teluk Pucung-007 Sesuai TT Number TTNOC- 2023
230411161549451-001
Site MP-Semper Timur-001 Sesuai TT Number TTNOC- 2023
230418001424481-001
001 - 317_CM_FTTH_TTNOC- 2023
230331074647723-001_FO CUT_MP-Pejagalan-001 2023
BAST
dengan19Vendor
% Penarikan
PT. Mahaga Kabel Udara -FTTH
Pratama Kedoya Utara RW 06 - 270 HP
SPK No 2023
012/BTS/PS/SPK-FO/III/2023
Kabel Gepeng Terlindas Truck Site Curug Wetan-006 2023
Sesuai TT Number
Kalibaru-012 SesuaiTTNOC-23041413460279-001
TT Number TTNOC- 2023
230410200545527-001 2023
PAT 30 % Penarikan Kabel Udara FTTH-PO Standart-Kreo RW 07-226 HP 2023
PAT 30 % Penarikan Kabel Udara FTTH-PO
Impact Kabel Gepeng Site 708642 - Sukamantri-013 Standart-Kreo RW 10-308 HP 2023
Sesuai TT Number
Bangka-001 SesuaiTTNOC-230322092821685-00
TT Number TTNOC- 2023
230517193659897-001
Impact Kabel Tergilas Truck Site 708642 - Sukamantri-013 2023
Sesuai TT Number TTNOC-230403195153445-001 2023
Selatan RW03 & RW04 - 224
HP
317_PM_FTTH_TTNOC-230330090020955-001_Relokasi 2023
FAT 01_Pluit- 2023
ATP 30% Rollout New - Kedaung Kaliangke RW 02 2023
Pekerjaan Repair Kabel Link Backbone Pulo Sirih to BSC H3I Bekasi Impact RSL Low Site Pulo Si 2023
Pekerjaan Repair Kabel Link Backbone Impact Kabel Link BB Broken Site MP-Suka Pura- 2023
Pekerjaan Penarikan FO CUT dan Install HH Concrete Impact Kabel Terbakar Site MP-Ke 2023
Pekerjaan Penarikan FO CUT Ducting Impact Galian PDAM Site MP-Cideng-001 Sesuai T 2023
Pekerjaan FO CUT Kabel Ducting Impact Pekerjaan FO CUT Kabel Ducting Impact Terbak 2023
Pekerjaan Rektifikasi Kabel FO Ducting Expose Site Sukaasih Kab Tangerang-004 Sesua 2023
Pekerjaan Perbaikan Kabel Landai dan Tiang Miring FO Site MP-Sukabumi Utara-002 Se 2023
ATP 30% Rollout New - Kedaung Kaliangke RW 06 2023
ATP 30 % Subfeeder Kedaung Kaliangke RW2 - Jakarta Barat 2023
ATP
CUT 30 % Subfeeder
Ducting ImpactKedaung
JC BrokenKaliangke RW6 - JakartaSesuai
Site MP-Ancol-001 Barat 2023
TT Number TTNOC-23051207423289-001 2023
YOFC = Yangtze Optical Fibre And Cable Joint Stock
DP YOFC
PAC 1 YOFC
PAC II YOFC
FAC YOFC

Kategori Projek Status Dokumen


Project BKS Sudah masuk ke finance

Project BKS Sudah masuk ke finance


Project BKS paid
Project BKS paid
OM BTS paid
OM BTS paid
OM BTS Paid
OM BTS Paid
OM BTS Paid
Project BKS Sudah masuk ke finance
Project BKS Sudah masuk ke finance
Project BKS Sudah masuk ke finance
Project YOFC Paid
Project YOFC Paid
Project YOFC Paid
Project YOFC Paid
OM BTS paid
OM BTS Paid
OM BTS Paid
Project YOFC Paid
Project YOFC Paid
Project YOFC Paid
OM BTS paid
Project BKS Proses Routing Approval
OM BTS Proses Routing Approval
Project BTS Proses Routing Approval
OM BTS waiting payment
OM BTS waiting payment
OM BTS waiting payment
OM BTS waiting payment
OM BTS waiting payment
OM BTS waiting payment
Project BKS Sudah masuk ke finance
Project BTS waiting payment
OM BTS waiting payment
OM BTS waiting payment
Project BKS Proses Routing Approval
Project BKS Proses Routing Approval
OM BTS waiting payment
OM BTS waitng payment
OM BTS waiting payment
Project BKS Proses Routing Approval
OM BTS waiting payment
Project YOFC on check mba Noer DC
OM BTS waiting payment
OM BTS waiting payment
OM BTS waiting payment
OM BTS waiting payment
OM BTS waiting payment
OM BTS waiting payment
OM BTS waiting payment
Project YOFC on check mba Noer DC
Project YOFC on check mba Noer DC
Project YOFC on check mba Noer DC
OM BTS waiting payment
40%( DP Bond )
30% (ATP Civil Work )
25% (RFS/Ready For Service Certificate )
5 % ( Final Acceptance Certificate )

1,348,288,106
NO PO Tgl PO TOP Nilai PO Tgl Invoice
BKS/21/10/1450 3-Feb-23 DP 20 % 90,292,000 24-Mar-23

BKS/21/10/1450 3-Feb-23 PAT 30% 24-Mar-23


BKS/21/10/1458 6-Feb-23 DP 20 % 104,213,600 24-Mar-23
BKS/21/10/1458 6-Feb-23 PAT 30% 24-Mar-23
5010007693 23-Feb-23 Invoice 100% 2,105,684 28-Feb-23
1010035657 11-Mar-23 Invoice 100% 22,628,242 13-Mar-23
5010007761 11-Mar-23 Invoice 100% 9,173,284 13-Mar-23
5010007762 11-Mar-23 Invoice 100% 5,164,684 13-Mar-23
5010007763 11-Mar-23 Invoice 100% 6,689,684 13-Mar-23
BKS/21/10/1477 13-Mar-23 DP 20 % 66,510,000 14-Mar-23
BKS/21/10/1497 21-Mar-23 DP 20 % 61,465,000 27-Mar-23
BKS/21/10/1498 21-Mar-23 DP 20 % 79,985,000 27-Mar-23
Invoice 100%
PR20230208004YII-YOFC-MAHAGA-01 15-Feb-23 DP 40 % 33,519,454 22-Feb-23
PR20230208005YII-YOFC-MAHAGA-02 15-Feb-23 DP 40 % 25,155,615 22-Feb-23
7400011616-YOFC-MAHAGA-03 21-Mar-23 DP 40 % 20,369,566 27-Mar-23
5010007888 29-Mar-23 Invoice 100% 23,073,684 29-Mar-23
5010007884 28-Mar-23 Invoice 100% 15,197,484 29-Mar-23
5010007885 28-Mar-23 Invoice 100% 10,459,684 29-Mar-23
7400012105-YOFC-MAHAGA-04 3-Apr-23 DP 40 % 11,407,413 6-Apr-23
PR20230330007YII-YOFC-MAHAGA-06 3-Apr-23 DP 40 % 38,208,303 6-Apr-23
7400011852-YOFC-MAHAGA-05 3-Apr-23 DP 40 % 17,110,035 6-Apr-23
1010036006 6-Apr-23 Invoice 100% 1,281,284 10-Apr-23
BKS/21/10/1477 13-Mar-23 PAT 30% 66,510,000 17-Apr-23
5010008034 9-May-23 Invoice 100% 35,508,685 9-May-23
1010036335 9-May-23 Invoice 100% 17,047,632 10-May-23
5010008082 23-May-23 Invoice 100% 1,766,685 23-May-23
5010008097 5-Jun-23 Invoice 100% 2,137,685 5-Jun-23
5010008098 5-Jun-23 Invoice 100% 8,452,685 45,082
5010008099 5-Jun-23 Invoice 100% 6,226,485 5-Jun-23
5010008100 5-Jun-23 Invoice 100% 15,455,685 5-Jun-23
5010008102 5-Jun-23 Invoice 100% 3,074,685 5-Jun-23
BKS/21/10/1458 8-Jun-23 BAST 19 % 73,808,800 12-Jun-23
1010036827 13-Jun-23 Invoice 100% 18,727,632 13-Jun-23
5010008185 21-Jun-23 Invoice 100% 18,086,685 22-Jun-23
5010008186 21-Jun-23 Invoice 100% 13,163,685 22-Jun-23
BKS/21/10/1497 21-Mar-23 PAT 30% 61,465,000 22-Jun-23
BKS/21/10/1498 21-Mar-23 PAT 30% 79,985,000 22-Jun-23
5010008182 21-Jun-23 Invoice 100% 15,871,685 22-Jun-23
5010008183 21-Jun-23 Invoice 100% 10,529,685 22-Jun-23
5010008184 21-Jun-23 Invoice 100% 18,688,685 22-Jun-23
BKS/21/10/1477 22-Jun-23 BAST 40 % 65,818,000 26-Jun-23
5010008247 5-Jul-23 Invoice 100% 2,606,435 5-Jul-23
7400011848-YOFC-MAHAGA-01 15-Feb-23 ATP 30% 33,519,454 17-Jul-23
5010008276 13-Jul-23 Invoice 100% 2,481,685 17-Jul-23
5010008277 13-Jul-23 Invoice 100% 2,341,685 17-Jul-23
5010008278 13-Jul-23 Invoice 100% 11,153,685 17-Jul-23
5010008279 13-Jul-23 Invoice 100% 3,800,685 17-Jul-23
5010008280 13-Jul-23 Invoice 100% 13,475,885 17-Jul-23
5010008281 13-Jul-23 Invoice 100% 9,458,685 17-Jul-23
5010008282 13-Jul-23 Invoice 100% 6,602,485 17-Jul-23
PR20230208005YII-YOFC-MAHAGA-02 15-Feb-23 ATP 30% 25,155,615 17-Jul-23
PR20230330007YII-YOFC-MAHAGA-06 3-Apr-23 ATP 30% 38,208,303 17-Jul-23
7400011852-YOFC-MAHAGA-05 3-Apr-23 ATP 30% 17,110,035 17-Jul-23
5010008296 14-Jul-23 Invoice 100% 6,038,685 18-Jul-23
66,427,920
14,321,120

672,513,210 0.11 225,261,125


Nilai Tagihan VAT Net Amount Nominal Paid Tgl Paid
18,058,400 1,986,424 20,044,824

27,087,600 2,979,636 30,067,236


20,842,720 2,292,699 23,135,419 2023-07-13
31,264,080 3,439,049 34,703,129 56,926,679 2023-07-13
2,105,684 231,625 2,337,309 2,300,460 2023-04-28
22,628,242 2,489,107 25,117,349 24,721,355 2023-05-02
9,173,284 1,009,061 10,182,345 10,021,813 2023-04-28
5,164,684 568,115 5,732,799 5,642,418 2023-04-28
6,689,684 735,865 7,425,549 7,308,480 2023-04-28
13,302,000 1,463,220 14,765,220
12,293,000 1,352,230 13,645,230
15,997,000 1,759,670 17,756,670
2023-02-19
13,407,782 1,474,856 14,882,638 2023-03-30
10,062,246 1,106,847 11,169,093 25,641,006 2023-03-30
8,147,826 896,261 9,044,087 8,901,501 2023-04-14
23,073,684 2,538,105 25,611,789 25,208,000 2023-07-05
15,197,484 1,671,723 16,869,207 16,603,251 2023-05-16
10,459,684 1,150,565 11,610,249 11,427,205 2023-05-16
4,562,965 501,926 5,064,891 2023-05-16
15,283,321 1,681,165 16,964,487 2023-05-16
6,844,014 752,842 7,596,856 29,159,154 2023-05-16
1,281,284 140,941 1,422,225 1,399,803 2023-05-25
19,953,000 2,194,830 22,147,830
35,508,685
17,047,632 1,875,240 18,922,872
1,766,685 194,335 1,961,020
2,137,685 235,145 2,372,830
8,452,685 929,795 9,382,480
6,226,485 684,913 6,911,398
15,455,685 1,700,125 17,155,810
3,074,685 338,215 3,412,900
14,321,120 1,575,323 15,896,443
18,727,632 2,060,040 20,787,672
18,086,685 1,989,535 20,076,220
13,163,685 1,448,005 14,611,690
18,439,500
23,995,500
15,871,685 1,745,885 17,617,570
10,529,685 1,158,265 11,687,950
18,688,685 2,055,755 20,744,440
25,981,200 2,857,932 28,839,132
2,606,435 286,708 2,893,143
10,055,836 1,106,142 11,161,978
2,481,685 272,985 2,754,670
2,341,685 257,585 2,599,270
11,153,685 1,226,905 12,380,590
3,800,685 418,075 4,218,760
13,475,885 1,482,347 14,958,232
9,458,685 1,040,455 10,499,140
6,602,485 726,273 7,328,758
7,546,685 830,135 8,376,820
11,462,491 1,260,874 12,723,365
5,133,011 564,631 5,697,642
6,038,685 664,255 6,702,940
No Invoice No Faktur Pajak No Docket
00062/MP/0323/0006 0100012324051337 DC050066

00062/MP/0323/0006 0100012324051337 DC050066


00062/MP/0323/0007 0100012324051338/0110012324051338 DC050067
00062/MP/0323/0007 0100012324051338/0110012324051338 DC050067
00062/MP/0223/0004 0100012324051253 DC090179
00062/MP/0323/0001 0100012324051293 DC090283
00062/MP/0323/0002 0100012324051294 DC090284
00062/MP/0323/0003 0100012324051295 DC090285
00062/MP/0323/0004 0100012324051296 DC090287
00062/MP/0323/0005 0100012324051298/0110012324051298 DC050057
00062/MP/0323/0008 0100012324051339/0110012324051339 DD050002
00062/MP/0323/0009 0100012324051340/0110012324051340 DD050003
00062/MP/0223/0001
00062/MP/0223/0002 0100012324051229
00062/MP/0223/0003 0100012324051230
00062/MP/0323/0010 0100012324051341
00062/MP/0323/0011 0100012324051344 DD090125
00062/MP/0323/0012 0100012324051345 DD090126
00062/MP/0323/0013 0100012324051346 DD090127
00062/MP/0423/0001 0100012324051371/011.001-23.24051371
00062/MP/0423/0002 0100012324051372/0110012324051372
00062/MP/0423/0003 0100012324051373/011.001-23.24051373
00062/MP/0423/0004 0100012324051376
00062/MP/0423/0005 0100012324051377 DE050001
00062/MP/0523/0001 0100082370681210 DE090398
00062/MP/0523/0002 0100082370681211 DE020359
00062/MP/0523/0003 0100082370681241 DF090032
00062/MP/0623/0001 0100082370681252 DF090141
00062/MP/0623/0002 0100082370681253 DF090140
00062/MP/0623/0003 0100082370681254 DF090139
00062/MP/0623/0004 0100082370681255 DF090138
00062/MP/0623/0005 0100082370681256 DF090332
00062/MP/0623/0006 0100082370681272 DF050017
00062/MP/0623/0007 0100082370681273 DF020186
00062/MP/0623/0008 0100082370681292 DG090155
00062/MP/0623/0009 0100082370681293 DG090154
00062/MP/0623/0010 0100082370681295 DF050033
00062/MP/0623/0011 0100082370681296 DF050034
00062/MP/0623/0012 0100082370681299 DG090158
00062/MP/0623/0013 0100082370681300 DG090157
00062/MP/0623/0014 0100082370681301 DG090156
00062/MP/0623/0015 0100082370681318/0110082370681318 DF050039
00062/MP/0723/0001 0100082370681340 DG090213
00062/MP/0723/0009 0100082370681340
00062/MP/0723/0002 0100082370681347 DG090436
00062/MP/0723/0003 0100082370681348 DG090438
00062/MP/0723/0004 0100082370681349 DG090439
00062/MP/0723/0005 0100082370681350 DG090441
00062/MP/0723/0006 0100082370681351 DG090440
00062/MP/0723/0007 0100082370681352 DG090442
00062/MP/0723/0008 0100082370681353 DG090435
00062/MP/0723/0010 0100082370681355
00062/MP/0723/0011 0110082370681360
00062/MP/0723/0012 0110082370681361
00062/MP/0723/0013 0100082370681362 DG090437
Tgl Submit Esub Tgl submit Dok fisik NO BAST
27-Mar-23 4-Apr-23

27-Mar-23 4-Apr-23
27-Mar-23 4-Apr-23
27-Mar-23 4-Apr-23
13-Mar-23 BAST/PT.MP/23/II/0286
20-Mar-23 BAST/PT.MP/23/II/0288
20-Mar-23 BAST/PT.MP/23/II/0294
20-Mar-23 BAST/PT.MP/23/II/0296
20-Mar-23 BAST/PT.MP/23/II/0297
17-Mar-23 4-Apr-23
4-Apr-23 4-Apr-23
4-Apr-23 4-Apr-23

10-Apr-23 BAST/PT.MP/23/II/0302
10-Apr-23 BAST/PT.MP/23/II/0401
10-Apr-23 BAST/PT.MP/23/II/0402

11-Apr-23 BAST/001/FTTHOPS-Mahaga/IV/23
2 Mei 2023 9 Mei 2023
17 Mei 2023 19 Mei 2023
11 Mei 2023 16 Mei 2023 BAST/FO-A/23/III/00980
6-Jun-23 29 Mei 2023
13-Jun-23 6-Jun-23
13-Jun-23 6-Jun-23
13-Jun-23 6-Jun-23
13-Jun-23 6-Jun-23
23-Jun-23 6-Jun-23 013/BAST/FTTH/05/2023
12-Jun-23 13-Jun-23
13-Jun-23 BAST/FO-A/23/V/00989
12-Jul-23 4-Jul-23
12-Jul-23 4-Jul-23
26-Jun-23 4-Jul-23
26-Jun-23 4-Jul-23
12-Jul-23 4-Jul-23
12-Jul-23 4-Jul-23
12-Jul-23 4-Jul-23
26-Jun-23 4-Jul-23 018/BAST/FTTH/05/2023
14-Jul-23 10-Jul-23

26-Jul-23 20-Jul-23 BAST/PT.MP/23/VI/0476


26-Jul-23 7/20/2023 BAST/PT.MP/23/VI/0477
26-Jul-23 7/20/2023 BAST/PT.MP/23/VI/0478
26-Jul-23 7/20/2023 BAST/PT.MP/23/VI/0479
26-Jul-23 7/20/2023 BAST/PT.MP/23/VI/0480
26-Jul-23 7/20/2023 BAST/PT.MP/23/VI/0481
26-Jul-23 7/20/2023 BAST/PT.MP/23/VI/0482

26-Jul-23 7/20/2023 BAST/PT.MP/23/VI/0485


NO DP Bond NO Perfomance Bond NO Kwitansi NO SPK
0005/BKS/FTTX-PROC/SPK/1/23

0005/BKS/FTTX-PROC/SPK/1/23
0006/BKS/FTTX-PROC/SPK/1/23
0006/BKS/FTTX-PROC/SPK/1/23

23.08.02.1104.020044 23.08.02.1104.020047 0029/BKS/FTTX-PROC/SPK/III/23


23.08.02.1104.020050 23.08.02.1104.020049 0030/BKS/FTTX-PROC/SPK/III/23
23.08.02.1104.033907 23.08.02.1104.033906 0031BKS/FTTX-PROC/SPK/III/23

23.08.02.1104.020039 L-021/SRT-MP/III/2023
23.08.02.1104.020040 L-020/SRT-MP/III/2023
L-026/SRT-MP/III/2023

L-030/SRT-MP/IV/2023
L-031/SRT-MP/IV/2023
L-032/SRT-MP/IV/2023

0029/BKS/FTTX-PROC/SPK/III/23

009/BTS/PS/SPK-FO/II/2023

0006/BKS/FTTX-PROC/SPK/I/23

012/BTS/PS/SPK-FO/III/2023

0030/BKS/FTTX-PROC/SPK/III/23
0031BKS/FTTX-PROC/SPK/III/23
0029/BKS/FTTX-PROC/SPK/III/23

L-062/SRT-MP/VII/2023

L-063/SRT-MP/VII/2023
L-064/SRT-MP/VII/2023
L-065/SRT-MP/VII/2023
NO Sertifikat PAT
014/PAT/FTTH/03/2023

014/PAT/FTTH/03/2023
013/PAT/FTTH/03/2023
013/PAT/FTTH/03/2023

tunggu sertifikat PAT


tunggu sertifikat PAT

19/PAT/FTTH/04/2023

034/PAT/FTTH/06/2023
035/PAT/FTTH/06/2023
DP 20% (DP Bond min 3 bulan & Performance Bond 6 bulan)
PAT 30% (Progress pekerjaan BAST 50 %)
TOP BTS/BKS
BAST 40% (Progress pekerjaan 100%)
BA Retensi 10%

DP YOFC 40%( DP Bond )


PAC 1 YOFC 30% (ATP Civil Work )
TOP YOFC
PAC II YOFC 25% (RFS/Ready For Service Certificate )
FAC YOFC 5 % ( Final Acceptance Certificate )

DP 35%
RFI 1 0.15
TOP IBS RFI 2 25%
ATP BAST 20%
BAST Retention 5%

TOP Nominal PO Nominal


DP 20 % 66,510,000 13,302,000
PAT 30% 66,510,000 19,953,000
BAST 40 % 65,818,000 25,981,200
Retensi 10 % 65,818,000 6,581,800
Subtotal 65,818,000
No Kode
1
Nama Pekerjaan Kategori
Sewa Layanan Internet Satelit VSAT Mangoesky STAR (Starlink Intenet) Instalasi VSAT Starlink
PT. Media Telekomunikasi Mandiri

TOP : 100 % After Invoice Received


Submit Invoice : Monday, 13.00 - 15.00 WIB
Confirm of Payment : Friday, 13.00 - 15.00 WIB

Kode Project NO /PO TGL PO NO BAST TGL BAST


MS-23-010 MTM/POR/205/23/546 19-Apr-23 BAST/MP/0523/001 21-Mar-23
13.00 - 15.00 WIB
y, 13.00 - 15.00 WIB

No Kwitansi No Invoice No FP TGL Inv Nominal BAST


L-044/SRT-MP/V/2023 00071/MP/0523/0018 0100082370681221 19-May-23 1,500,000
11%
VAT 11 % Net Amount Keterangan Tgl Paid Nominal Paid
165,000 1,665,000 Paid 16-Jun-23 1,635,000
A PO Awal 104,213,600

B DP 20 % 20,842,720
C PAT 30 % 31,264,080
D Total Invoice tersubmit (B + C) 52,106,800

E PO Final 73,808,800
F Nominal yg belom tertagih ( E - D) 21,702,000

G BAST (F - H ) 14,321,120
H BA retensi (10% X E ) 7,380,880
I subtotal (G+H) 21,702,000
66,427,920
14,321,120
24-May-23
24-May-23
5-Jun-23
5-Jun-23
3-Jun-23
23-May-23
25-May-23
29-May-23
9-May-23
23-May-23
17-May-23
17-May-23
22-May-23
17-May-23
17-May-23
25-May-23

23-May-23
31-May-23
13-Jun-23
23-May-23
25-May-23
25-May-23
10-May-23
22-May-23
12-Apr-23
18-Apr-23
26-Apr-23
17-Apr-23
3-May-23
3-May-23
25-May-23
25-May-23
25-May-23
25-May-23
14-Jun-23
14-Jun-23
14-Jun-23
14-Jun-23
8-Jun-23
19-May-23
Agusti Hendra
Alwi Saputra
Adolf Nait
Cyahyono
Rohman Ashari
Surono
Jaka Sofian
Muslimin
Haerun
Sunarto
Natam Diono
Rahim
9-Jun-23
9-Jun-23
Moratel

14-Apr-23
14-Apr-23
Materai 630,000
Kordinasi Listing PT TBG 3,000,000
Fu Dok Penagihan CME 92,235
Fu Dok Penagihan CME 156,090
Fiberstar 43,000
Moratel 1,058,997
Moratel 283,997
CME 1,552,997
ZTE 297,999
Konsultan Project 662,400
PT Woris 147,998
Binamarga 573,999
Tinta canon 380,000
Moratel 63,000
Moratel 305,000
OPS Trial Signalku 52,000
Delico 573,999
Moratel 41,000
Materai 510,000
Materai 510,000
Moratel 110,000
Trial Signalku 221,700
Trial Signalku 130,100
Kopi kenangan 443,000
JNE 18,000
Toko Bintang 455,000
ATK 105,000
ATK 60,000
Materai 510,000
PT Utama 859,210
Infokom 42,939
Koordinasi Listing PT Nexwave 1,700,000
Warung Nasi Cianjur 188,100
Go shuttle sheat 2 125,000
Go shuttle sheat 5 125,000
Istana Motor 1,430,000
138,000
Tokopedia panel surya 669,400
Tokopedia Solar charge 78,000
Pak Pram -Top Buah Cibubur 310,000
Tokopedia Modified Sine 248,100
IBS Grab Halte Kantor A9 - GKM Cikini 34,000
IBS Grab GKM Cikini - Halte Kantor A9 25,000
IBS Grab Halte Kantor A9 - GKM Cikini 39,000
IBS Grab GKM Cikini - Kantor Taman A9 29,000
IBS Gojek GKM - Kantor Taman A9 21,500
IBS Gojek Kantor Taman A9 - GKM 19,000
Gojek Bali Tower Gojek Capital fruit - kantor taman A9 20,500
Grab Transportasi survey ATP PSN - Masjid At Taqwa 77,000
Grab Transportasi survey Kedoya -PSN 80,000
Grab Bali Tower kantor taman A9 - Gojek Capital fruit 20,200
Grab Bali Tower ruko mitra matrman - mampang 24,700
Grab Bali Tower mampang - ruko mitra matrman 27,200
Blubird 48,460
Starbucks 323,000
Bakmi Roxy 218,000
TOTAL A 19,907,820

Retno Galih UPG-CGK 2,281,928


Retno Galih CGK-UPG 1,380,144
TOTAL B 3,662,072

SUBTOTAL A+ B 23,569,892

You might also like