Professional Documents
Culture Documents
User Manual
SG2K-S / SG2K5-S / SG3K-S /
SG3K-D / SG5K-D / SG8K-D
WWW.SUNGROWPOWER.COM SG2-8K-UEN-Ver15-202010
All Rights Reserved
No part of this document can be reproduced in any form or by any means without
the prior written permission of Sungrow Power Supply Co., Ltd (hereinafter
“SUNGROW”).
Trademarks
and other Sungrow trademarks used in this manual are
owned by Sungrow Power Supply Co., Ltd.
All other trademarks or registered trademarks mentioned in this document are
owned by their respective owners.
Software Licenses
It is prohibited to use data contained in firmware or software developed by
SUNGROW, in part or in full, for commercial purposes by any means.
It is prohibited to perform reverse engineering, cracking, or any other operations
that compromise the original program design of the software developed by
SUNGROW.
I
About This Manual
The manual mainly describes the product information, guidelines for installation,
operation and maintenance. The manual cannot include complete information
about the photovoltaic (PV) system. The reader can get additional information
about other devices at www.sungrowpower.com or on the webpage of the
respective component manufacturer.
Validity
This manual is valid for the following inverter models:
SG2K-S
SG2K5-S
SG3K-S
SG3K-D
SG5K-D
SG8K-D
They will be referred to as “inverter” hereinafter unless otherwise specified.
Target Group
This manual is intended for:
qualified personnel who are responsible for the installation and
commissioning of the inverter; and
inverter owners who will have the ability to interact with the inverter.
II
Symbols
Safety instructions will be highlighted with the following symbols.
Symbol Explanation
Indicates a hazard with a high level of risk that, if not
avoided, will result in death or serious injury.
Indicates a hazard with a medium level of risk that, if not
avoided, could result in death or serious injury.
Indicates a hazard with a low level of risk that, if not avoided,
could result in minor or moderate injury.
Indicates a situation that, if not avoided, could result in
equipment or property damage.
Indicates additional information, emphasized contents or
tips that may be helpful, e.g. to help you solve problems or
save time.
III
Contents
About This Manual ....................................................................II
1 Safety ....................................................................................1
1.1 PV Panels ..................................................................................1
1.2 Utility Grid ..................................................................................1
1.3 Inverter.......................................................................................2
1.4 Skills of Qualified Personnel ......................................................3
2 Product Description ............................................................4
2.1 Intended Use .............................................................................4
2.2 Product Introduction ...................................................................5
2.2.1 Model Description ..................................................................... 5
2.2.2 Appearance ............................................................................... 5
2.2.3 Dimensions ............................................................................... 7
2.2.4 LCD Panel ................................................................................. 7
2.3 Function Description ..................................................................8
2.3.1 Basic Function........................................................................... 8
2.3.2 External Demand Response (“AU”/”NZ”) ................................... 8
2.3.3 Reactive Power Regulation ....................................................... 9
2.3.4 Power Quality Response ........................................................... 9
3 Unpacking and Storage ....................................................10
3.1 Unpacking and Inspection ........................................................10
3.2 Identifying the Inverter .............................................................10
3.3 Scope of Delivery .....................................................................12
3.4 Inverter Storage .......................................................................13
4 Mechanical Mounting........................................................14
4.1 Safety during Mounting ............................................................14
4.2 Location Requirements ............................................................14
4.2.1 Installation Environment Requirements ................................... 15
4.2.2 Carrier Requirements .............................................................. 15
IV
4.2.3 Installation Angle Requirements .............................................. 15
4.2.4 Installation Clearance Requirements ....................................... 16
4.3 Installation Tools ...................................................................... 16
4.4 Moving the Inverter.................................................................. 18
4.5 Installing the Inverter ............................................................... 19
5 Electrical Connection ...................................................... 21
5.1 Safety Instructions ................................................................... 21
5.2 Terminal Description ................................................................ 22
5.3 Cable Requirements................................................................ 23
5.4 Additional Grounding Connection ............................................ 23
5.4.1 Additional Grounding Requirements ........................................ 23
5.4.2 Connection Procedure ............................................................. 24
5.5 AC Cable Connection .............................................................. 24
5.5.1 AC Side Requirements ............................................................ 25
5.5.2 Assembling the AC Connector ................................................. 26
5.5.3 Installing the AC Connector ..................................................... 27
5.6 DC Cable Connection.............................................................. 27
5.6.1 PV Input Configuration ............................................................ 28
5.6.2 Assembling the PV Connector ................................................. 31
5.6.3 Installing the PV Connector ..................................................... 32
5.7 RS485 Communication Connection ........................................ 33
5.8 Energy Meter Connection ........................................................ 33
5.9 DRM Connection (“AU”/“NZ”) .................................................. 35
6 Commissioning ................................................................ 38
6.1 Inspection before Commissioning ........................................... 38
6.2 Button Function ....................................................................... 38
6.3 Commissioning Procedure ...................................................... 38
7 LCD Operation .................................................................. 40
7.1 Button Function ....................................................................... 40
7.2 Main Screen ............................................................................ 40
7.3 Menu Structure ........................................................................ 42
7.4 Viewing Running Info .............................................................. 43
V
7.5 Advanced Settings ...................................................................43
7.5.1 Inputting the Password ............................................................ 43
7.5.2 Setting Protective Parameters ................................................. 44
7.5.3 Zero-export Setting ................................................................. 47
7.5.4 Adding the Existing Inverter ..................................................... 48
7.5.5 PF Setting ............................................................................... 48
7.5.6 Parameter Reset ..................................................................... 48
7.5.7 DRM Switch Setting (“AU”/”NZ”).............................................. 48
7.5.8 GND Detection ........................................................................ 49
7.5.9 Energy Adjustment .................................................................. 49
7.5.10 Setting Communication Parameter ........................................ 49
7.5.11 Ethernet Configuration .......................................................... 49
7.5.12 Arc Detection ......................................................................... 50
7.6 Starting/Stopping the Inverter ..................................................50
7.7 Viewing the Error Record .........................................................50
7.8 Setting the Time .......................................................................50
7.9 Setting the Country ..................................................................51
7.10 Viewing Device Info .................................................................53
8 System Decommissioning ...............................................54
8.1 Disconnecting the Inverter .......................................................54
8.2 Dismantling the Inverter ...........................................................55
8.3 Disposing of the Inverter ..........................................................55
9 Troubleshooting and Maintenance..................................56
9.1 Troubleshooting .......................................................................56
9.1.1 LED Indicator .......................................................................... 56
9.1.2 Errors on the App or LCD Screen ............................................ 56
9.2 Maintenance ............................................................................62
10 Appendix ............................................................................64
10.1 Technical Data .........................................................................64
10.1.1 –S Series .............................................................................. 64
10.1.2 –D Series .............................................................................. 65
10.2 Quality Assurance ....................................................................67
VI
1 Safety
The inverter has been designed and tested strictly according to international
safety regulations. Read all safety instructions carefully prior to any work and
observe them at all times when working on or with the inverter.
Incorrect operation or work may cause:
injury or death to the operator or a third party; or
damage to the inverter and other properties.
All detailed work-related safety warnings and notes will be specified at critical
points in this manual.
1.1 PV Panels
1
1 Safety User Manual
1.3 Inverter
2
User Manual 1 Safety
Warning Label
Label Description
Disconnect the inverter from all the external power sources
before maintenance!
3
2 Product Description
2.1 Intended Use
SG2K-S / SG2K5-S / SG3K-S / SG3K-D / SG5K-D / SG8K-D, a transformerless
single-phase PV grid-connected inverter, is an integral component in the PV
power system.
The inverter is designed to convert the direct current power generated from the
PV modules into grid-compatible AC current and feeds the AC current to the
utility grid.
Load power
A B C D
E
Fig. 2-1 Application in a PV Power System
Item Description Remarks
Compatible with monocrystalline silicon,
A PV strings polycrystalline silicon and thin-film without
grounding.
4
User Manual 2 Product Description
For the TT utility grid, the N line voltage to ground must be 30 V or less.
SG 3K - S
2.2.2 Appearance
The image shown here is for reference only. The actual product you receive may
differ.
5
2 Product Description User Manual
1 2 3 4 5 6
6
User Manual 2 Product Description
2.2.3 Dimensions
W D
H
Fig. 2-3 Dimensions of the Inverter
Dimensions and Weight
Model W (mm) H (mm) D (mm)
SG2K-S / SG2K5-S / SG3K-S 300 370 125
SG3K-D / SG5K-D 360 390 133
SG8K-D 360 390 148
1 2 3 2
Fig. 2-4 LCD Panel
No. Name Description
1 LCD screen Display and access current operating data or change
inverter settings.
2 Buttons ESC / ENT.
View or set parameters via the buttons. For detailed
functions, see Tab. 6-1.
3 Indicator Green / red.
User can observe the color and blinking frequency to get
the current state of the inverter. For detailed definition,
see Tab. 6-2.
7
2 Product Description User Manual
8
User Manual 2 Product Description
9
3 Unpacking and Storage
3.1 Unpacking and Inspection
The inverter is thoroughly tested and strictly inspected before delivery. Damage
may still occur during shipping. For this reason, please conduct a thorough
inspection after receiving the device.
1. Check the packing case for any visible damage.
2. Check the scope of delivery for completeness according to the packing
list.
3. Check the inner contents for damage after unpacking.
Contact SUNGROW or the supplier in case of any damage or incompleteness.
Do not dispose of the original packing case. It is recommended to store the
inverter in it.
10
User Manual 3 Unpacking and Storage
光伏并网逆变器 1
型号 SG5K-D
直流 输入
最大输入电压 DC 60 0 V
最小 MPP 电压 DC 90 V
最大 MPP 电压 DC 56 0 V
最大输入电流 DC 25(12.5/12.5)A
最大短路电流 DC 30(15/15)A 2
交流 输出
额定输出电压 23 0 V
额定输出频率 50 Hz
最大输出电流 AC 21.7 A
额定输出功率 4.99 9 kW
最大视在功率 4.99 9 kVA
功率因数范围 0.8 Le ad...0.8 La g
安全等级 I
防护等级 IP65
工作温度范围 -25℃…60℃
中国制造
4
CE mark of conformity.
11
3 Unpacking and Storage User Manual
Inverter
a Wall-mounting bracket Documents b
b
c
AC connector set PV connector set M4x10 grounding screw
Optional Accessory
The Energy Meter is not included in
the inverter packaging but, if
ordered, delivered separately.
More detailed information on the
Energy Meter can be found in the
respective Quick Installation Guide.
Single-phase meter
12
User Manual 3 Unpacking and Storage
Store the inverter in the original packing case with the desiccant inside.
The storage temperature should be always between -30°C and +85°C, and
the storage relative humidity should be always between0 and 100 %, non-
condensing.
In case of stacking storage, the number of stacking layers should never
exceed the limit marked on the outer side of the packing case.
13
4 Mechanical Mounting
4.1 Safety during Mounting
14
User Manual 4 Mechanical Mounting
IP65
15
4 Mechanical Mounting User Manual
400 mm 400 mm
800 mm
For multi-row installation, the distance between two adjacent rows should be at
least 400 mm.
16
User Manual 4 Mechanical Mounting
880.0
17
4 Mechanical Mounting User Manual
18
User Manual 4 Mechanical Mounting
2. Set the wall mounting bracket aside and drill the marked holes. The depth
of the holes should be about 70 mm. Install the wall-mounting bracket
with a torque of 9.0 Nm.
Wall-mounting bracket
Fender washer
Spring washer
Self-tapping screw
Expansion tube
3. Mount the inverter to the bracket, and secure it with an M4x80 screw
(torque: 1.5 Nm).
19
4 Mechanical Mounting User Manual
5. Remove the waterproof lid from RS485 terminal and install the
communication module to the inverter. The following figure takes the Wi-
Fi module as an example. Refer to the manual delivered with the module
for details.
20
5 Electrical Connection
5.1 Safety Instructions
Prior to any electrical connections, keep in mind that the inverter has dual power
supplies. It is mandatory for the technical personnel to wear personal protective
equipments (PPE) during the electrical work.
Comply with the safety instructions related to the PV strings and the
regulations related to the utility grid.
All electrical connections must be in accordance with local and national
standards.
Only with the permission of the local utility grid company, the inverter
can be connected to the utility grid.
21
5 Electrical Connection User Manual
PV2 PV1
PV2 PV1
1 2 3 4 5
Fig. 5-1 Terminal Description
* Image shown here is for reference only. The actual product you receive may
differ.
Tab. 5-1 Terminal Descriptions
No. Terminal Description Decisive Voltage
Classification
MC4 terminals for PV inputs. DVC-C
-S series: one pair of PV terminals.
PV
1 -D series: three pairs for SG8K-D
terminals
and two pairs for other –D
inverters.
RS485 DVC-A
2 To connect the WiFi module.
terminal
Meter | The left hole is for meter DVC-A
3 DRM communication and the right is for
terminal DRED communication.
Additional Not applicable
4 grounding For reliable grounding.
terminal
AC terminal for connection to the DVC-C
5 AC terminal
utility grid.
22
User Manual 5 Electrical Connection
Since the inverter is transformerless, neither the negative pole nor the
positive pole of the PV string must be grounded. Otherwise, the
inverter will not operate normally.
Connect the additional grounding terminal to the protective
grounding point before AC cable connection, PV cable connection,
and communication cable connection.
The ground connection of this additional grounding terminal cannot
replace the connection of the PE terminal of the AC cable. Make sure
the two terminals are both grounded reliably.
23
5 Electrical Connection User Manual
L = E + (2~3)mm
1 2
M4
1.5N.m
24
User Manual 5 Electrical Connection
Connect the inverter to the grid only after getting an approval from
the local electric power company.
Before connecting the inverter to the grid, ensure the grid voltage and frequency
comply with requirements, for which, refer to "10.1 Technical Data". Otherwise,
contact the utility grid company for help.
AC Circuit Breaker
An independent two-pole circuit breaker must be installed on the output side of
the inverter to ensure safe disconnection from the grid. The recommended
specifications are as follows:
Inverter Model Specification
SG2K-S / SG2K5-S 15 A
SG3K-S / SG3K-D 20 A
SG5K-D 32 A
SG8K-D 50 A
25
5 Electrical Connection User Manual
4. Assemble the housing, the terminal block and the swivel nut (torque
4–5 Nm for SG8K-D and 2–3 Nm for other models). Make sure that
the rib of the terminal block and the groove on the housing engage
perfectly until a “Click” is heard or felt.
26
User Manual 5 Electrical Connection
27
5 Electrical Connection User Manual
-S Series
There is one input area with one MPP tracker. Only one input can be connected,
as shown in the following figure.
PV input
MPPT
Inverter inside
-D Series
For –D inverters except SG8K-D, there are two pairs of PV terminals, each with
its MPP tracker.
The inverter SG8K-D has three pairs of PV terminals. The PV1 has an
independent MPP tracker. The PV2 has two pairs of PV terminals, which are
internal paralleled and with one MPP tracker.
The PV1 and PV2 can be configured in independent mode or parallel mode.
28
User Manual 5 Electrical Connection
For SG8K-D, the PV strings to PV2 input should have the same PV
module type, the same string length, identical tilt and identical
orientation.
Independent Mode
Each PV input operates independently and has its own MPPT. In this way, string
structures of each PV input may differ from each other, including PV module type,
number of PV modules in each string, angle of tilt, and installation orientation.
PV input 1
MPPT1
Inverter Inside
PV input 2
MPPT2
Inverter Inside
PV input 2
MPPT2
Only the current is limited for a single input and the power is
not limited.
Prior to connecting the inverter to PV inputs, the specifications in the following
table should be met:
29
5 Electrical Connection User Manual
Parallel Mode
All PV strings should be the same in PV string structure, including the type,
number, tilt, and orientation of the PV modules.
PV input 1
MPPT
PV input 2
Inverter inside
PV input 1
MPPT
PV input 2
Inverter inside
Max. current
Total PV Input Open-circuit
Model for input
Power Limit Voltage Limit
connector
SG3K-D 4000 W 600 V 30 A
SG5K-D 6500 W 600 V 30 A
SG8K-D 10400 W 600 V 45 A
30
User Manual 5 Electrical Connection
To avoid the input power unbalance of the two inputs or input load-
restriction, ensure the two PV input cables are of the same type.
Use the MC4 DC terminal within the scope of delivery. Damage to the
device due to the use of incompatible terminal shall not be covered by
the warranty.
Procedure:
1. Strip the insulation from each DC 2. Assemble the cable ends
cable by 7 mm. with the crimping pliers.
Positive Crimp Contact
7mm
Negative Crimp Contact
3. Lead the cable through cable gland, and insert into the insulator until
it snaps into place. Gently pull the cable backward to ensure firm
connection. Tighten the cable gland and the insulator (torque 2.5 Nm
to 3 Nm).
31
5 Electrical Connection User Manual
Positive Insulator
Negative Insulator
Crimp Contact
Crimp Contact
Cable Gland Cable Gland
OFF
ON
2. Check the cable connection of the PV string for polarity correctness and
ensure that the open circuit voltage in any case does not exceed the
inverter input limit of 600 V.
480.0
+
32
User Manual 5 Electrical Connection
Check the positive and negative polarity of the PV strings, and connect
the PV connectors to corresponding terminals only after ensuring
polarity correctness.
Electric arc or contactor over temperature may occur if the PV
connectors are not firmly in place, and SUNGROW shall not be held
liable for any damage caused due to this operation.
3. Connect the PV connectors to corresponding terminals until there is an
audible click.
PV+ PV+
PV - PV -
+
-
- +
* The image shown here is for reference only. The actual product you receive
may differ.
4. (-D series) Seal the unused PV terminals with the terminal caps.
33
5 Electrical Connection User Manual
Network Utility
Sungrow meter
meter grid
PV strings Inverter
Home Appliance
34
User Manual 5 Electrical Connection
4. If no external demand
response enabling device
connected, secure the
waterproof lid to the inverter
bottom with four screws
(torque 1.5 Nm) and then
fasten the swivel nut (torque
4 Nm to 5 Nm).
35
5 Electrical Connection User Manual
3. Unscrew the swivel nut from the cable gland and remove the waterproof
plug from the right inlet. Lead the cable through the cable gland then the
right inlet.
4. Use the Ethernet crimper to crimp the cable and carefully push all 8
unstripped colored wires into the RJ45 plug according to local standard,
as shown below.
36
User Manual 5 Electrical Connection
37
6 Commissioning
6.1 Inspection before Commissioning
Check the following items before starting the inverter:
1. The inverter DC switch and external circuit breaker are disconnected.
2. The inverter should be accessible for operation, maintenance and service.
3. Nothing is left on the top of the inverter.
4. The inverter is correctly connected to the external devices, and the cables
are routed in a safe place or protected against mechanical damage.
5. The selection of the AC circuit breaker is in accordance to this manual
and all applicable local standards.
6. All unused terminals at the bottom of the inverter are properly sealed.
7. Warning signs and labels are intact and legible.
38
User Manual 6 Commissioning
39
7 LCD Operation
7.1 Button Function
The inverter offers two buttons with multiple functions. Please refer to the
following table before any operation of the inverter.
Tab. 7-1 Button function
Button Operation Description
Navigate up / down or change the setting values.
≤1.2 s
Hereinafter referred to as “Touch ESC”.
ESC
Return to a previous menu or cancel the settings.
>1.2 s
Hereinafter referred to as “Press ESC”.
Move left or right, or turn pages, or view the active
≤1.2 s error/warning from the main screen.
ENT Hereinafter referred to as “Touch ENT”.
Enter the sub-menu or confirm a selection or settings.
>1.2 s
Hereinafter referred to as “Press ENT”.
40
User Manual 7 LCD Operation
When there is no button operation for more than 8 seconds on the main screen,
the displayed information will automatically cycle through to provide additional
data: Main screen, energy, PV data, utility grid data. The screen will cycle every
2 seconds. Press any button to quit this mode.
* The images shown here are for your reference only. For –D series, all PV input
information will be displayed.
Tab. 7-2 Status Description
State Description
The inverter waits for sufficient sunlight, then the DC voltage
Standby
recovers.
Startup The inverter is initializing and synchronizing with the grid.
After being energized, the inverter tracks the PV strings’
Running maximum power point (MPP) and feeds the AC power to grid.
This mode is the normal mode.
The inverter is connected to an external demand response
DRMx enabling device and the DRM switch is set to ON via the LCD
menu.
The inverter will stop running by manual “OFF” via the LCD
Turn off menu or with the DRM0 command from external DRED. Set to
“ON” if you want to restart the inverter.
Upgrading The DSP or LCD firmware is upgrading.
If an error occurs, the inverter will automatically stop operation,
trigger the AC relay and show “Error xxx” on the LCD with the
indicator red (xxx is the error code).
Error xxx
Once the error is cleared in recovery time, the inverter will
automatically try to resume normal operation. The recovery
time can be set via the App.
If the device is in standby mode for more than 10 minutes, please check:
Whether the insolation is sufficient and the PV connection is correct.
If no anomaly is found, disconnect and reconnect the DC switch and
the main switch to restart.
If it still does not work, contact SUNGROW.
41
7 LCD Operation User Manual
Password: 111
Settings Grid Prot. Param
Zero-export
ON/OFF
Existing Inverter
Error Record PF
DRM Switch
Country Password: 111
GND Detect
Comm. Param
Arc Detection
42
User Manual 7 LCD Operation
Meter power:
+ (omitted): The inverter is sourcing power to the grid.
-: The inverter is sinking power from the grid.
Pmax limit: only indicated for the derating in the event of over-temperature,
overvoltage or over-frequency.
43
7 LCD Operation User Manual
Single/Multiple Protection
Touch ESC to change the value and touch ENT to move the cursor.
Confirm settings by pressing ENT.
Confirm settings and scroll pages by pressing ENT.
Too high grid voltage may affect the normal usage and the life of
household loads. The loss of any or all the warranty rights may follow
if the protection set-point is beyond the specified range.
44
User Manual 7 LCD Operation
Protection Recover
Vmax-rec (230.0 V–311.0 V):
Recovery value for over-voltage error. Inverter will
start operating when the grid voltage falls below this
value.
Vmax-rec: 253.0V
Vmin-rec (23.0 V–230.0 V):
Vmin-rec: 205.0V
Recovery value for under-voltage error. Inverter will
start operating when the grid voltage is above this
value.
45
7 LCD Operation User Manual
80%
Power, P/P rated %
Default characteristic
Range (lower limit)
60%
Range (upper limit)
40%
20%
0%
200
230
250
210
220
240
260
270
Inverter Voltage, V
46
User Manual 7 LCD Operation
With the password 111, the zero-export setting can only be done at the
first time. The later modification can be performed by professionals
only, please contact SUNGROW.
47
7 LCD Operation User Manual
7.5.5 PF Setting
The inverter is capable of operating with fixed power factor. The PF ranges from 0.8
leading (+) to 0.8 lagging (-).
+ (Leading): the inverter is sourcing reactive power to
the grid.
- (Lagging): the inverter is sinking reactive power PF: +1.000
from the grid.
All settable parameters will return to the default values once the “Param
Reset” operation is performed.
48
User Manual 7 LCD Operation
49
7 LCD Operation User Manual
50
User Manual 7 LCD Operation
Main Screen (Press ENT) → Menu (Touch ESC) → Time (Press ENT)
Time: 10 : 30 : 05
Scroll pages by pressing ENT.
51
7 LCD Operation User Manual
WP EG Other
When the grid is set to “EE” or “EG”, the reactive power regulation will be in PF
mode with the power factor of +0.90 (lagging).
Tab. 7-8 Grid Standard Description
Grid company Code Company
AG AusGrid, NSW
EE Ergon Energy, QLD
PN SA Power Networks,SA
PC Powercor,VIC
WP Western Power,WA
EG Energex, QLD
Other Company not mentioned above
52
User Manual 7 LCD Operation
Other
Parameter (Default)
AG EE EG PN PC WP
10-min voltage
1-V10-min (V) 255.0 255.0 255.0 257.0 258.0 255.0 258.0
Refer to Tab. 7-3 for the parameter explanation and range. If you
(qualified personnel only) need to modify the voltage protective
parameters, please refer to “Single/Multiple Protection”.
53
8 System Decommissioning
8.1 Disconnecting the Inverter
For maintenance or other service work, the inverter must be switched off.
Proceed as follows to disconnect the inverter from the AC and DC power sources.
Lethal voltages or damage to the inverter will follow if otherwise.
1. Stop the inverter via the LCD menu. For details, see “7.6
Starting/Stopping the Inverter”.
2. Disconnect the AC circuit breaker and secure it against reconnection.
3. Rotate DC switch to “OFF” position and then disconnect all of the PV
string inputs.
4. Wait at least 10 minutes until the capacitors inside the inverter completely
discharge.
5. Ensure that the DC cable is current-free via a current clamp.
6. Insert a MC4 wrench into the notch and press the wrench with an
appropriate force to remove the DC connector.
7. Lay the tool in the location of snap and press the tool down. Remove the
AC connector, ensure that the AC wiring terminals are voltage-free via a
multimeter, and remove the AC wires.
8. Install the MC4waterproof plugs and AC waterproof cover.
54
User Manual 8 System Decommissioning
Some parts and devices of the inverter, such as the capacitors, may
cause environment pollution.
Do not dispose of the product together with household waste but in
accordance with the disposal regulations for electronic waste
applicable at the installation site.
55
9 Troubleshooting and
Maintenance
9.1 Troubleshooting
9.1.1 LED Indicator
See “Tab. 6-2Indicator Status Description” for the definition.
Fault Type Troubleshooting
1. Disconnect the AC circuit breaker.
LED indicator
2. Rotate the DC switch to “OFF”.
cannot be lit.
3. Check the polarity of DC input.
1. Disconnect the AC circuit breaker.
2. Rotate the DC switch to “OFF”.
3. Check the inverter electrical connection. Refer to “5
Green indicator Electrical Connection”.
goes out. 4. Check whether the voltage of DC input exceeds the
inverter start-up voltage.
5. If all the above conditions are OK, please contact
SUNGROW.
56
User Manual 9 Troubleshooting and Maintenance
57
9 Troubleshooting and Maintenance User Manual
58
User Manual 9 Troubleshooting and Maintenance
59
9 Troubleshooting and Maintenance User Manual
60
User Manual 9 Troubleshooting and Maintenance
61
9 Troubleshooting and Maintenance User Manual
9.2 Maintenance
62
User Manual 9 Troubleshooting and Maintenance
Restart the inverter only after removing the fault that impairs safety
performance.
As the inverter contains no component parts that can be maintained,
never arbitrarily replace any internal components.
For any maintenance need, please contact SUNGROW. Otherwise,
SUNGROW shall not be held liable for any damage caused.
63
10 Appendix
10.1 Technical Data
10.1.1 –S Series
Parameters SG2K-S SG2K5-S SG3K-S
Input Data
Max. PV input power 3000 W 3200 W 4000 W
Max. PV input voltage 600 V
Startup voltage 120 V
Nominal input voltage 360 V
MPP voltage range 90 V–560 V
MPP voltage range for nominal
210 V–480 V 260 V–480 V 310 V–480 V
power
No. of MPPTs 1
Max. number of PV strings per
1
MPPT
Max. PV input current 12.5A
Max. PV short-circuit current 15 A
Max. inverter backfeed current
0A
to PV string
Output Data
Nominal AC output power 2000 W 2500 W 3000 W
Max. AC output apparent
2000 VA 2500 VA 3000 VA
power
Max. AC output current 9.1 A 11.3 A 13.7 A
Max. inrush current
8 A / 12 ms
(peak value / duration)
Max. output fault current
80 A / 3.2 ms
(peak value / duration)
Max. output over-current
25 A
protection
Nominal AC voltage 230 Vac(single phase)
180 Vac–276 Vac
AC voltage range
(this may vary with grid standards)
Nominal grid frequency 50 Hz / 60 Hz
45 Hz–55 Hz / 55 Hz–65 Hz
Grid frequency range
(this may vary with grid standards)
Total harmonic distortion
< 3 % (of nominal power)
(THD)
DC current injection < 0.5 % (of nominal current)
64
User Manual 10 Appendix
10.1.2 –D Series
Parameters SG3K-D SG5K-D SG8K-D
Input Data
Max. PV input power 4000 W 6500 W 10400 W
65
10 Appendix User Manual
66
User Manual 10 Appendix
67
10 Appendix User Manual
Evidence
During the warranty period, the customer shall provide the product purchase
invoice and date. In addition, the trademark on the product shall be undamaged
and legible. Otherwise, SUNGROW has the right to refuse to honor the quality
guarantee.
Conditions
After replacement, unqualified products shall be processed by SUNGROW.
The customer shall give SUNGROW a reasonable period to repair the faulty
device.
Exclusion of Liability
In the following circumstances, SUNGROW has the right to refuse to honor the
quality guarantee:
If the free warranty period for the whole machine/components have expired.
If the device is damaged during transport.
If the device was incorrectly installed, refitted, or used.
If the device is operated in a very improper environment, as described in
this manual.
If the fault or damage was caused by installation, repairs, modification, or
disassembly performed by a service provider or personnel other than this
company.
If the fault or damage was caused by the use of non-standard or non-
SUNGROW components or software.
If the installation and use range are beyond stipulations of relevant
international standards.
If the damage was caused by an abnormal natural environment.
For faulty products in any of above cases, if the customer requests maintenance,
paid maintenance service may be provided based on the judgment of
SUNGROW.
Contact Information
Should you have any question about this product, please contact us.
We need the following information to provide you the best assistance:
Model of the inverter
68
User Manual 10 Appendix
Brazil France
Sungrow Do Brasil Sungrow France
Sao Paulo
Lyon
+55 11 2366 1957
+33420102107
latam.service@sa.sungrowpower.com service@sungrow-emea.com
India Italy
Sungrow (India) Private Limited Sungrow Italy
Gurgaon Verona
+91 080 41201350 +39 0800 974739 (Residential)
service@in.sungrowpower.com +39 045 4752117 (others)
service@sungrow-emea.com
69
10 Appendix User Manual
Japan Korea
Sungrow Japan K.K. Sungrow Power Korea Limited
Tokyo
Seoul
+81 3 6262 9917
+82 70 7719 1889
service@jp.sungrowpower.com service@kr.sungrowpower.com
Malaysia Philippines
Sungrow SEA Sungrow Power Supply Co., Ltd
Selangor Darul Ehsan
Mandaluyong City
+60 19 897 3360
+63 9173022769
service@my.sungrowpower.com
service@ph.sungrowpower.com
Thailand Spain
Romania Turkey
Service Partner - Elerex Sungrow Deutschland GmbH
+40 241762250 Turkey
service@sungrow-emea.com Istanbul
+90 216 663 61 80
service@sungrow-emea.com
UK U.S.A, Mexico
Sungrow Power UK Ltd. Sungrow USA Corporation
Milton Keynes Phoenix
+44 (0) 01908 414127 +1 833 747 6937
service@sungrow-emea.com techsupport@sungrow-na.com
70
User Manual 10 Appendix
service@vn.sungrowpower.com
Poland -
+48 221530484
service@sungrow-emea.com
71